Council archive · source document
07/1703 - Multiple Housing Type 4 [As Published] · 132007.1703
INTEGRATED PLANNING ACT 1997, ‘Integration of fand use and public transport For more information refer to Guide 23, schedule 8A of the IPA, & schedule 2 of the IP Requiation. : Unless you answered “none of the above”, the application triggers referral to QT as a concurrence agency. 1 IDAS Assessment Checklist, Version 20, 2 Aprit 2007 22. The application involves: (tick the applicable box/es)— D (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that schedule. UO (ii) reconfiguring a tot— (1a) ontand that is completely or partly within a public transport corridor, and the total number of lots increases; (1 (b) on land that is completely or partly within a future public transport corridor or an airport's public safety area; (©) onland that is within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000m? or greater; LJ (d) fora residential purpose within the 25 ANEF contour for an airport; (1 (e) fora residential purpose resulting in 100 or more allotments. 0 (ii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, on land that— (J (a) _ is completely or partly within a public transport corridor or a future public transport corridor; (2 (b) _ will result in work that encroaches into an airport's operational airspace. (iv) none of the above. J Railway safety and efficiency 4 For more information refer to Guide 23, schedule 8A ol the IPA & schedule 2 of the IP Requlation. Unless you answered “none of the above", the application triggers referral to QT as a concurrence agency. 23. The application involves: (tick the applicable box/es)— LD (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that schedule. D (ii) reconfiguring a fot— [J (a) ontand that is completely or partly within a future public transport corridor, future railway land or a railway tunnel easement; (0 (b) on land that is within 400m of a Citytrain passenger railway station or a future Citytrain passenger railway station, and the total site area is 5000m? or greater; [1 (ce) on land that abuts rail corridor land, commercial corridor land or future railway land, and the total number of lots increases; on land that abuts rail corridor land, commercial corridor land or future railway land and an easement abutting the corridor or future railway land is created; Ce) onland that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and the total number of lots increases; (Of) for a residential purpose resulting in 100 or more allotments. LC (iii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, involving extracting, excavating or filling greater than 50m3, on land that— C1 (a) __ is completely or partly within rail corridor land or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; (0 () is completely or partly within future raitway land, or a railway tunnel easement; (1 (c) abuts rail corridor land, commercial corridor land or future railway land, and the work is within 25m of the railway boundary. KX (iv) none of the above. * Moonie to Brisbane pipeline . For more information refer to schedule 2of the IP Reguiation. Unless you answered “none of the above”, the ‘application triggers referral to the holder of pipeline licence No 1 issued under the Petroleum| Act 1923, currently Santos QNT Pty Ltd, for advice. 24. The application involves the easement for the construction or operation of the Moonie to Brisbane strategic pipeline, and involves: (tick the applicable box/es)— CO (i) a material change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be located wholly or partly in the easement. 0 (i) reconfiguring a tot : U (iii) operational work assessable against the planning scheme, that is filling, excavation, compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the work is located wholly or partly in the easement. &] (iv) none of the above. Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1703 - Multiple Housing Type 4 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.