Council archive · source document
132007.1022.01 Extension to relevant period
3. Nature of request (please tick ALL applicable categories)
q To change the development q To change the development q' To extend the relevant period
approval conditions before lapsing
Please attach documentation outlining the detail of and the reasons and justification for the requested change or
extension.
4. Location of the premises
Unit No. Street No o S^ Street L; y'Vi r' i 1 C-
Suburb 1\ : O A V t u-L State Postcode s
Plan type & plan no.
5. Concurrance Agencies
Was there one or more concurrence agencies involved in the original approval? 0No
q Yes-provide details below
Note - Under s372 of the Sustainable Planning Act 2009 the person making the request is required to give a copy of this request to all
concurrence agencies.
Conc,u"j,m, enc.y, Date copy gi
6. Pre-request response notice
Has a pre-request response been given by a relevant entity (e.g. a concurrence agency) for this request?
No q Yes
If yes, please attach a copy of the notice.
7. Owner's consent
Is the owner's consent required for this request? q No
1),' } t a - p ^ _ r ,^ -, % I /e-`7c q Yes- complete either Table A or Table B below
Note - If more than one owner of the land all owners' details are required
Table q wner's;clonsen provided ob iarrn V
Date
Owner's name/s
Table A -owner's consent provided on foi
I/We, the above-mentioned owner/s of the land, consent
Owner's name/s
to the making of this request.
Signature/s q The owner's written consent is attached.
2 of 4 2011112 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM401
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132007.1022.01 Extension to relevant periodRelated documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.