Council archive · source document
0015E693.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
es NEereKw we Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1. APPLICATION FORMS — . ” — .
1.1 Form 1 Part A
1.1.1. Ensure that the form is fully completed. [7]
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required: iN
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information “D et MOH
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed. mi
2. REFERRALINFORMATION ~~) >. OO co"
@ 2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. ot
3. “ ENVIRONMENTALLY RELEVANTACTIVITIES =~. 2). 7, es
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. ' FORM 2-REQUEST TO. CHANGE APPROVAL © ne re 2
4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. “PLANS. . Ce ee ae ow eR
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa!
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. “SUPPORTING INFORMATION 77 TTT ae
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
@ capable of reproduction.
6.2. In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. —
TREE TSS OCTET USES TTT DUBE sal GB
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. |
Receiving Officer PS. dypeewe litters Date LAL POP oc
Having completed this form and accepted th¢-4pplication, please deliver both to the following IDAS Application Receiving
trays:-
* If the application is for a Materlal Change of Use exclusively -AOP1’s desk in the Land Use Section.
¢ !f the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
* if the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.
e Inall other circumstances - AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.docSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 29 sections
Section 2
GMA Certification Group Pty Ltd
BUILDING SURVEYORS
Queensland's leaders in Building Certification Services GMA
ACN 104 855 110
Noosa Shire Council SUNSHINE COAST
Land Use Department
PO Box 141 FAX. ov = 84 490483
. Tewantin QLD 4565 Shop 20 “Tewantin Ptaza”
. TEWANTIN. QLD. 42XX.
13/8/07
POSTAL:
P.O. Box 0742,
. NOOSAVILLE BC. QLO. 4566
To whom it may concern,
E-Mail: adminsc@geoffmitche!l.com.au
Web: www.qeoffmitchell.com.au
RE: 90 Persimmon Drive, Peregian Beach.
Please find an application attached for a code assessment against the Building Works Code (Roof Form $12.1 sub
b) as it does not meet the Acceptable Solution.
We find that the building
@ e Does contribute positively to the skyline.
e It does not present an appearance of excessive bulk to the streetscape.
e It does not create opportunities for residence to overlook the private open space areas of the neighboring
properties.
e It does use simple and traditional roof designs.
e Under the new amendments of The Noosa Plan new and alterations to existing building only need 70% of
the dwelling to have 600mm sofits to comply with the The Noosa Plan.
Can you please assess the application in a way to gain a positive outcome as we believe it complies with the
specific outcomes of the The Noosa Plan.
Please debit our account 1156.
Regards LL 3 Le»
/-s NES
2
e ZH Vs % ¢
* S
Tony Boreham a SS Ss SS oo
Sy
oo
re
BUILDING APPROVALS & INSPECTION BUILDING CERTIFICATION FIRE SAFETY AUDITS
Gold Coast Chinchilla Cloncurry Atherton
(07) 5578 1622 {07) 4669 1166 (07) 4742 2022 (07) 4091 4196Section 3
INTEGRATED PLANNING ACT 1997 . . Part A, Version 2.4, 29 May 2006
sD hey i nce NL ta nee ese
WO Spier cele) il nl eae) lie ne re 1
3a on i ae See UE OE a ee a te te <i :
an a aa eT ORR I Ck SSR ESE URE: SEDER FOCUSES
7 Pes pes
7 ommon etal S &/0)
} o pace,
; The completion of all appficable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
: __ . Fequired, and by one (1) or more-ather completed piarts of the Form as required: For more information on the parts of the Form refer to www.ipa.gld.gov.au, ,
~_-Any.information requested in the form may be'provided in af attachment to the application. For further information about completing the following details, refer to. Guide 4.
‘ Description ofland. ° °° .. * “}4° Street address: fnctidinghouse riuniber, stréet name; suburbMocalily name & postcode) {if pplicabls)
_ Identified, However, 8 desorption af thelandjstot: -| | 4D ren 2 USEKTCL. (Rta
: ; i ar i " . ok : om ee pe ge
- Utremenly Reloven Achy (ekay = | 2. Nathe of water body or watercourse, within which the developments proposed: (if applicable). .
: | development ls proposed within a water body o. voy Te oo
ywatecourse, "ee TS. Lot on plan‘description (eg. Lot 123 on RP 4567) 'GPS.coordinates;-"—"" S s
ieuietyaninpmcechin mercests | | CODE GGL on UCM UES@ 1d
* identified by a lot on plan description. These details - .
‘can be obtained from titts.di its of through the . © ae ° rrr Tn 7 aie
ocal covernment eee ree’ 14: The above description is for: (tick applicable box) e
" Héwever, i ihe land on which the development is i) the land on which the development is proposed; or
dd t have a lot on pkin desériptlon (f8," | . se ve \ te ee . .
the developmen! proposed in owaler body or fie CD (i) the land adjoining the water body of watercourse, within which the development is
watercourse) provide ~~ ‘ . proposed; or . :
“(the tot iption for th vey aa a : -
6 adpinbgtaocant ond: o woe [-] (ii) the water body or watercourse. ‘
" adisining/adjacent tand (69, jn Moreton Bay). 5. Shop/tenancynumber. - 6. Storey / level: 7. Total area of land: (m? or ha):
i) GPS coordinates where there i :
dévelopment is within a water body or watercourse. a A, at 2
foe Te co anent ate 3 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woacoo etc.) (if applicable)
Note: ras bby hgh wae mara at in
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Adyice for completing Q5 - Q9 appties if i : . . , -
development is on strategie port land or a strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
Proposal details 10. Existing use of the land: (eg. vacant, single housa, shop etc.) : ,
provided in an attachment to the application. ee
If thera is insufficient room avaitable, details may be
@ 11. Proposed tsé of the land: eg. 6 unit apartment building, 30 Jot residential subdivision, ERA for aquaculture in
: ponds with a total area of 7 ha for which wastes are released into waters etc).
Other applicable parts of Form + 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part 1, elc)
completed parts of Form 1. For information about ‘
when a part of Form + may apply refer to Guide 1.
Applicant details 13. Applicant's name: 4 _ 15. Contact person: _
applicant need pot be the owner of the land. | 4: ( MA Z Af OAR Ry TH - .
When signing and jedaing this application 14. Contact number: 16. Facsimile nufber/e-mail address:
information provided is correcl The assessment Sou oO 3% SUG Ge 23 .
manager, any referral agency & the Chief Executive
(where applicab!s) will rely on this Information when 17. Postal address:
tthe aplcantisacompane-a con | PS Box 45.2 Cocgerrile SC_«StE.
lEthe applicantis a company-acontactperson on AALS >
must be shown, 18. Signature: 19. Date:Section 4
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application: 7 OO
Section 3.2.1(3) of the IPA prescribes that'an . .
written consent of the land owner/s, if tie application _ , ° ,
invoWwes: 7 -| (i)
(} a material change of use; wee eee eee ee ee ne eee pb Moo ee eee en ce ene e beeen nee we
(i) “reconfiguration of alot .-. . .
(il) work on land below highwaler mark & not within a (ii) A
"canal as defined under the Coastal Protection and bee reece mene cece e ene ce een ne cnn] aw ee ene eee eee eee ee nen de acne nee eeel
" . Management Act 199508 =~ of ° - . .
(iv) work on rail corridor land defined under the =” (iii) : +
. _ 4 Transport Infrastructure Act 1994. oe dq. pen erence nee ene eee ee ene feo een banca nen en mena cree cnc eeceennnn sewn e ecce eee ence |
Section 3.8.1(2a) of the IPA provides that, -_ noe A
landowner’s consent is pofrequired for a mobile or | °. (iv) i a
" For more inforination refer to Guide 1, 41 Ww
“Resource entitlement (if applicable) ‘21; Does this application involve a State resource prescribed u ndef a regulation other than involving » ;
Section 3.2.1(5) of the IPA requires evidence of. fx". quarry material on State coastal larid under the Coastal Profection and Mariagement Act 1995)? 7? =
" resource entitlement be:given (or applications that... [> ~ Tao sa: an se nt ee ave nies Menegoment Act 19 ) ae Be
involve a prescribed Staje resource." .” yf. LS lO 790 f0 Q24° .. ae ae [YES = go to Q22 Te RE
; Section.3:2.1{40)(a){i) of the IPA prescribes thatan foc, 7 er 5 8 FL Te a RT a
application cout te then tobe properly made” | 22. This application is accompanied by evidence: (tick applicable box)" my ot Se
ny eines othe rescues entitement, Me) C4 (i), of the alloeation of, or entitlement to, the resource ~ attach evidence and goto Q23(v) :
Advice for completing Q21822: i a he OM Shae a ete
“Refer to schedule 10 af the Integrated Planning ...| L_] (ii) the:phfef executive of the department administering the.resource is satisfied the r
_ Regulation 1998 that prescribes the nature ofevidence|- «1. * ‘ mont f Acletant wi awe: . cg ge Source can: f
required by the State in support of the lodging of this | abs Nelopment is consistent with an allocation Of, or entitlement to, the resource ~ ga ;
development application, Te A a * oto - ae Looe .. ° ane :
. ili) the chief executive of the department‘administering the resource is satisfiedthe ~ .,
oo ~ development application may proceed in the absence of an/allocation of, or -
ede . . ,entitlement to, the resource-gotoQ2a:; 7 Me .
Advice for completing 023 ston dena 23. Evidence of the resource entitlement; - a a
The information in {i) - {v} is mandatory # evidence Is | ° py , . . PH ‘ Smrtmanb
requied vider G22 fi Sa ehore " (i). Resource entitlement / authority details _—-.-—_‘{Vii) Official stamp of the depariment
The officia) stamp of the Department of Natural oe administering the FeSOUrce (if - a
Resources, Mines and Water is mandatory where the . = } applicable, :
application involves any water or riverine quarry (ti) Name of delegated officer . . :
Soctn 3.2.1(A) allows theese PO)
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. 023 (vi) must be i iti Ficor . .
. (iv) Signature of delegatéd g¥icer .
(v) Date : : ;
. (vi) _ date’ of evidence a a cs C
Assessment triggers 24. \s the IDAS Assessment Checklist completed and attached to this application? © :
the palcton open aim Boltteromonke kt ‘| [AYES [_] NO ~ the assessment manager may refuse to accept this application on the
must be completed for all other applications. _ grounds that the application has not been properly made
Plans / drawings / reports ' 125. Plans/drawings/reports accompanying this application: ; an eZ
An application should be accompanied by details to . .
Sop he propor & entice sess Plan/Drawing/ Report Number | Title, =| ate
manager, referra! agencies and any person viewing .
notification to understand the scope of the proposal MONON cece SUS. tem oul Fine. Aoail don
the application during public scrutiny or public (i) Sbe .
and any potantia! impact. . 7) Plum l wt Nor, ~Ragl- o ;
. Tom a srr n esse newccecrecewererecceccn ds om] Tarn ee renee caer me aie cen garecaeccacene t
. AO Plt neces Elilkon Sottescheul,.
() Plow Heer _layorta Seddon BP |
. PLEASE NOTE: The assessment manager may refuse to accept an application that, at the ime of lodgement, fails to provide all applicable information required by Part A |
and any other relevant part of Form 1. i
SSS yea SSS Ses oss t
OFFICE USE ONLY {applicable to assessment manager's ,
er = DATE =~ 4 [ RECEIVING OFFICER'S | A ; REFERENCE :
- [FEM vo tyleloy Lanes 1S Snes, | wneve | OT) (oy by |
= uy] “SEISINTEN TNT t= RET E-OGTT RERNTENTAEEDIENEY ak InGaN Coe meee = —
: Notification of Engagement of Private Certifier (Optional formal) ee ON ae |
, To : Council. t have been engaged as the private céttifier for the building work referred to in this application,-*-+"~ |
- : . . o - “ . ee : ; te - “ * ay . r. f ” ae ‘ .
Dateofengagement: / { Accreditation Number : a. Name: OT ___; Signature: cae ore a ;Section 5
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
rm ¥A ke On Seg arm. 41° Tye past kat ee Hi os cies Sint ce SL TS aie nS ps.
BL NE Wt, Sa eapR ee ghia cir nea PT MRR nag ie ESS Po, von teittac, Rae T RR EN et CBRE REE IRE on Seg gens
ee ee AAU AG OU Wal ofeec Ula a 3 ae ne ee 3
a eS sa ee
eo ee Re Oa a
Pescara es
’/ Operational &/or building work
ble against a local t’s planning sch |
aSSsessabie against a iocai governments planning scneme
. _ Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
; against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
i. " design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time). :
‘ peer econ cetttys tet eet woe ee ee ce ee frm ae ee ee ee ee Eee ee
or SR ee . we ae = ee I a ET MS LANE DOA PY REE seer fair + " .
s Nature of the Works - 1. The apgtcation is seeking approval of (tick one (1) or both if applicable):
The types of work that veerined by ggainst uilding work assessable against a planning scheme - provide details of the aspects of building
#4 planning scheme are determin . rk (e.g. building height greater than 8.5m; buildi igh fandstip risk
* achéine for & paricutar local government and work (e.g. building height greater than uilding work on high fandstip risk area}
To determine the types of work thatare | -_["] Operational work assessable against a planning scheme - provide details of the nature of the
© _ assessable under a particular planning nn operational work (e.g: roadworks; landscaping; Grainage works; stormwater, water infrastructure; sewerage. -
+ Scheme, contact the relevantlocal . __.. Infrastructure; earthworks; clearing vegetation; signage) ~ > Ta aed i
.govemment. , . : at - a . a
“Me inomatoainOisrecessayiog $= f Ld ,
® Statistical and planning purposes. =} 2. Js the application for operational work involving the creation ofnewlots? 9 * es
i 4 “oR o e [ed “Eko -[] YES ~ specify number of new jots to be created below rn ef
Goat Ng wom ay ot ny lg ce wa Rw , we a ed a BB,
Pee om 13. Does J proposal involve the construction of 4 canal that is associated with reconfiguring a lot?*
Pye 2 Looe Coerh, y ” ee Ph ae Pe ene ma Goole et, nae ic woe Ty s ee mT *
soe Pere ee oy & DANO. GIVES. Coos, ae ore Oe OE oO Ea Gate Care
"Nature of the application ” ao, [4.7 This application is for: (tick one (1) or both if applicable), ~~, eo pe RT aa
eos, iF 4 “eS : “ee wet tt £ ee aT po age’ Ss gy UN: ot ae “he Loy .
: A development permit authorises | — op Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
{ development to occur, while a preliminary * ‘infrastructure,etc =. OR pe PR am a
i approval is a step in the approval process: | | $-—— - - SEAEEAEEREEEEEEEEEeEED = a .
{and does otauborse deveopmentto oot} |
Fee ee ge ae SP 7 [EJ Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage 4
be we oe LS OM f+ ay. infrastructure, ete. eB to eo. 2 Be OE
he dee a Pe bb ~ - s
Pee eee Ry .
@ me “Sg 2 2.315) ° Are thé works subsequent to a previous development permit or preliminary approval? eR
woe go Sa le Of INO} 2 EL YES - provie detaiis of at previous approvals’ 7°
& fy Tbe Seay’ . * cook ak RO . . a aa . : : _ : : . . .
PULP om cs ep 7 Ty [Ea List of approval peferencels.: [Date approved Te Date approval iapses.-]
he er Saag ere ee ee Pee aS Oe aE — te: Sage ma eT ag a ee na Se TEE ONT iinet a Soa ERE eT EE PEM NET CORRS ES NE GEER BC
~~~ Portable Long Service Leave levy (i~| 6: 1s pay ent ofa Portable Cong Service teave (PESty levy applicable to the proposal?
applicable) , :* - . Bete ; MR a as ES = complete Q7 . a tee. “i = -. : = - * st : aoe oo . “As
‘Prior to issuing a development permit for the . ome % : ve a em . Poe
, Works, the assessment manager is required ~ | 5: » LINO ~-07, 8&9 do not apply ?~ i fem
j by law to “sight” an approved form, issued by Jo nO Fe Soy Me Bop FA a,
‘ Qleave, which signifies thatthe PLSL levy. 17.2: Has the PLSLlevy been paid?..°- ok
thas been paid, ee a a | DN ESccomobtedaie toe See Bg
{For further inforiation refer to “mde | oe one se ha pe we TE LEE a
‘hitpsiwwwoleavegid.gov.a xe we S|. [-] NO - the applicable levy mist be paid before a development pemnit can be given for the works oF .
ae . ms lee 7 - fest . e a Beg Se * Se TS Zz me . : an ‘ ae
} . Q 7 . . 2 2, . 5 . . ; m= 7 - ; - ee . fa o h ° . ; a mh ‘ Tey
to oe Ph ge |8.+ How much was paid? =. we BR Sg a SL at -
f . Y a ™ a4 . es ee, + ° - oa, a - ee ay T ~ * y ~ ~F _. a " =
= - 7. * 5 "7 19. Whatis'the receipt number of the payment? *. CR RySection 6
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
a
OFFICE USE ONLY gappiicabie to assessment manager)
| REFERENCE
jparenecened | mene |
* |
(i) 1s a PLSL levy applicable in this instance? - [JNO LI YES - complete (i). |
(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application? : .
- - [JNO oo C YES - provide receipt details _ __ ae
a I EE = rr a aSection 7
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Form 1 Development Application idas
YY Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2, Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an appiication requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4. — Therefore, the comptetion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. _ tis the responsibility of the applicant to accurately complete this checklist.
6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
@ 7, Depending on the nature of the application, an applicabte State entity may be either the assessment manager or an IDAS referral agency for the application.
8. The assessment manager for the application will rely on the information provided in this checklist (as wel! as any material fodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
9. Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the DAS
Assessment Checklist in the [OAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downtoaded free from
www.ipa.qid.gov.au.
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
i : ;
SECTION 1 - STATE ASSESSMENT (completion mandatory)
; Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4. CJ (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
He conteation Tenures ssccnsment bythe Qt, has not been made - complete Part G of Form 1
administering authority?, (] (i) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the (iii) none of the above
apptication, the administering authority is a
@ Concurrence agency for the application in retation
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kz of Form 1
for approval where an allocation under the Water
Act 2000 is required.
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable to assessment manager)
1 The assessment manager is responsibte for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queenstand Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 4Section 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: (tick appiicable box/es)
For more information refer to Guide 3, C1 ()) development on land contiguousé to a State controlled road and for -
Unless you answered ‘none of the above” to Q2, . . .
the application triggers referral to the Department (| (a) material change of use assessable against the planning scheme;
een eee tance Ova tease (J (b) reconfiguring a lot unless -
pen. Oi inather chert ances DMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 of the IP Requlation will assist you to : - . . .
determine where DMR is an advice or Di) operational work (not associated with a material change of use assessable against the
concurrence agency for the epplication. planning scheme or reconfiguring a fot mentioned in (b) above}-
e associated with access to a State-controlled road; or
« for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(_] (ii) development on land not contiguous to a State-controlled road and -
(J (a} material change of use -
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the 1P Regulation and exceeding the thresholds set by
that schedule;
(-) (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the iP regulation
and exceeding the thresholds set by that schedule;
@ LJ (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
, (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. C (i) material change of use —
for etoaicn ros aeeessrenat by fe 03, (a) assessable against the planning scheme;
Beperient of Natural Resources and Wait Resources and Water (b) ona lot containing -
Itan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWis@ « if there is no property map of assessable vegetation for the lot - remnant vegetation;
concurrence agency for the application in ration (c) where the existing use of the land is a rural or environmental use; and
if you ticked Q3{i) or (i), your application requires (a) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of CJ (ii) reconfiguring alot—
whether vegetation clearing is proposed or not. ,
{a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
@ (b} where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
C1 (ili) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a Jot mentioned in (ii) - complete Part J of
Form 1
{iv} none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11. CJ (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
If you ticked {i) - the relevant Port Authority is the Act) - complete Part! of Form 1
assessment manager for the application. : _ . ;
If you ticked (i!) Queensland Transport is a LJ @i) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. TI Act for the strategic port land - complete Part t of Form 1
{iii} none of the above
4 Land contiguous to a State-contolled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-contolled road; or that is part of a future State-
controlled road.
Page 2Section 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Acid sulfate soils 5. The application involves development on land situated in an identified> local government area
For more information refer to Guide 10. and where the surface of the land is: (tick appiicable box)
Unless you answered “none of the above" to QS, C1 (i) below 20m AHD® and the development will involve the excavation of 1000m? or more of
the application requires assessment by i di below 5m AHD
Department of Natural Resources and Water soil or sediment at or below Sm , OF
(NRW). C1) (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
If an agency other than NRW is the assessment of material
manager for the application, NRW is an advice .
agency for the application in relation to this O {ii) none of the above
matter,
Major hazard facilities or possible {6 Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities major razard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 47. NO
If you answered “YES" to Q6, the application
requires assessment by the Department of J YES - complete Part L of Form 1
Emergency Services (DES).
If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
ielation to this matter.
Water related development under the |7. The application involves:
Water Act 2000 C1 (i) operational work, for taking or interfering with water under the Wafer Act 2000, that is:
For mare information about items (a) - (f}, reter (ck applicable box/es)
to Guide 15, For more information about item . : oo. ; .
(g), refer to Guide 14 Does my application ] (a) in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
@ involve assessment of a refergble dam? dam) - complete Part Kz, Ks, Ke, Ke, or Ke of Form 1 whichever is applicable;
Untess you answered “none of the above" to C7, (7) (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
the application requires assessment by the ;
Department of Natural Resources _and Water Ky of Form f,
(NRW). (1) (c) for a subartesian bore, in declared subartesian area’, or in a certain area
If an agency other than NRW is the assessment covered by a water resource plan, for use for purposes other than stock and/or
manager for the application, NRWis a domestic use fate Part Ky of Form 1°
concurrence agency for the application in ~ complete . t ° orm,
relation to this matter. (J (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
(2 (e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1,
(-] (f} for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form {
CJ (g) for constructing a referable dam® or works that will increase the storage capacity
oh of a referable dam by more than 10% - complete Part Ks of Form 1; or
{ii)_ none of the above.
Removal of quarry material froma |8. Does the application involve development for the removal of quarry material from a watercourse?
watercourse requjafig an allocation notice under the Water Act 2000?
For more information refer to Guide 16. NO
If you answered “YES” to Q8, the application
requires assessment by the Department of 1 YES - complete Parts Kr and G of Form 1
@ Natural Resources_and Water (NRW}.
Hf an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in
Telation to this matter.
Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardweil, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vaie, Mornington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday,
6 Australian Height Datum (AHD).
7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA. ,
Page 3Section 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work thatis tidal work or 19. The application involves operational! work that is: ( tick the applicable boxes)
work in coastal management dist (qi) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed Hdl tidal workin Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
local government tidal areas refer to Guide 24 (J (i) tidal work that is prescribed tidal work" other than in a canal'? -complete Part P of Form 1:
Unless you answered ‘none of the above” to 09, or
the application requires assessment by the . . a oe
Environmental Protection Agsney (EPA). (1) (ii) carried out within a coastal management district under the Coastal Act and for - compiete
if an agency other than EPA is the assessment Part M of Form 1 if any box/es (a) to () below are ticked.
See ee oecate application in C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
relation to this matter. other than those works in tidal water) where the development has been determined not
Local govemment is the assessment manager to be assessable against the Water Act 2000 ;
for ail prescribed tidal work. [J (b) constructing a canal intended to be connected to tidal waters;
[1 (c}_ constructing an artificial waterway:
(1 (d) reclaiming land under tidal water;
LJ (e) disposing of dredge spoil or other solid waste material in tidal water;
C1 (f)__ interfering with quarry material on State coastal land above high-water mark;
L(g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
LJ (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
© (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{iv} none of the above.
Operational work below high water 10. The application involves operational work that is: ( tick the applicable boxes)
mar stonation refer to Guide 18. For (1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local goverment tidal areas refer to Guide 24, (CJ (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
Uniess you answered “none of the above” to vee . ve ye
ato, the application triggers referral to ( (iii) carried out within a coastal management district's under the Coastal Act and for -
Queensland Transport (QT) (Maritime Safety i. i i i jal in ti _
Cid) as a concurrence agency. He uspoeng of dredge spoil or other solid waste material in tidal water - complete Part
0
Local goverment is the assessment manager '
for all prescribed tidal work. [J (b) reclaiming land under tidal water ~ complete Part M of Form 1; Or
(c) constructing a canal, if the canal is associated with reconfiguring a lot — complete
Part M of Farm 7,
(iv) none of the above.
Coastal management 11. The application involves: (fick the applicable box/es)
For more information refer to Guide 18. (}{i) a material change of use assessable under a planning scheme involving operational
Olt the colcchon tenes ssveccment y the work carried out completely or partly in a coastal management district
© Environmental Protection Agency (EPA). C1 (ii) a material change of use assessable under a planning scheme involving building
‘ it an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is —
EE ne ape y for be apakcaton i « the construction of a new premises with a GFA'® of at least 1000m?
relation to this matter, « the enlargement of the GFA of existing premises by more than 1000m2
g gp y
(] (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
(1 (iv), reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
h the construction of a canal - complete Pat MofForm1
(v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulatian 2003 and includes certain tidal works completely or partly within a local government tidal area.
45 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 44 of the IPA to mean the gross floor area. For a definition of haw to cakulated GFA, go to the planning scheme against which the application is being assessed.
17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4Section 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Development within the limits ofa | 12. Does the application involve development below high water mark'® and within the limits of a port
port undeyshe Transport infrastructure Act 1994?
For mora information refer to Guide 18. For 0
information about prescribed tidal work refer to
Guide 24. _] YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
If you answered "YES" to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is —
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or s poil
grounds;
¢ within 1000m of a planned port facility
identified in aland use plan approved under
the Transport Infrastructure Act 1994.
tn afl other situation the Port Authority is an
advice agency.
Marinas 13. Does the epplication involve operational work that is tidal work for a marina‘? with more than 6
For more information refer to Guide 48. For vesseMerths?
information about whether a marina is prescribed 0
tidal work refer to Guide 24. The focal N
goverment is the assessment manager for al (17 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
prescribed tidal work.
If you answered “YES" to Q13, the application
@ triggers referral to Queensland Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal| 14. Doesfe application involve tidal works within a strategic port land tidal area20?
areas LANO
For more information refer to Guide 18. Oo YES - complete Part M of Form 1
Unless you answered “NO” to Q14, the retevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage 15. Does the. application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. QueerStland Heritage Act 1992?
If you answered "YES" to Q15, the application NO
triggers referral to the Queensland Heritage
Coungil as concurrence agency for the L_] YES - complete Part C of Form 4
application.
. . 15(b)The application involves: (tick applicable boxes)
Unless you answered “none of the above" to O : ‘al ch f bk ‘ he ol , h d
Q15(b), the application involves referral to the (i) | amaterial change o use assessable against t e planning scheme an the lot shares a
Environmental Protection Agency as an advice ; common boundary with a protected area or registered place under the Queensland
agency for the application Heritage Act 1992:
| =) fii) reconfiguring a lot if the tot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
@ (ii) none of the above.
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the involves: (tick the applicable box/es)
declared catchment areas within Queensland, . es « . oo
refer to Guide 13, _ [11 (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Unless you answered "none of the above” to [J (ii) development assessable against the planning scheme involving the establishment or
Q16, the application requires assessment by the xpansion of a waste water disposal system, other than a disposal system for carrying
Department of Natural Resources and Water : oa : ,
(NRW). out an environmentally relevant activity under the Environmental Protection Act 1994;
If an agency other than NRW is the assessment {iii) none of the above
manager for the application, NRWis a
concurrence agency for the application in
relation to this matter.
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regutation 1995,
20 Strategic port !and tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5Section 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Contaminated land 17. The application invofves: (tick the applicable box/es)
Soa unre aine change ie [1] {i) reconfiguring a lot for which all of part of the premises are —
referral. 4 ayes (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
For more information refer to Guide 5, + item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above” to + item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the + item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). If an activity: or
agency other than EPA is the assessment : ¥; . . .
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
Concurrence agency for the application in ordnance - complete Part N of Form 1
relation to this matter. . .
_} (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 4
; if) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable boxes)
Formate Information refer to schedule 2of the [P (J {i) reconfiguring a lot where any part of the lot is ~
Ouse won answered "none of the above" to subject to an easement in favour of a distribution entity or transmission entity under the
aig, he application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is granted in that Act; or
@ favour of as advice agency. + situated within 100m of a substation site;
(1) (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
e any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
¢ any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
C (iii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
(-] (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
+ any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
+ the work is located wholly or partly within 10m of a substation site;
(v}_ none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure designated for community infrastructure?
© designated for community infrastructure may (i) intended to be supplied by a public sector entity; and
Applications involving development on iand mG A ; Fa ye
trigger this referral. (ii) on land not owned by or on behalf of the State; and
Fi informati hedule 2 of the ve
For more information efer fo schedule 20 (iii) other than development -
If you answered “YES" to Qt9, the application (a) Aor the designated purpose; or
requires assessment by the chief executive of ; :
the de nl administering the Act authorising carried out by, or on behalf of, the designator.
the development for the designated purpose. NO
assessment manager for the appitcation, the O YES
If an agency other than the designator is the
Gesignating agency will be a concurrence
agency for the application in relation to this
matter.
Page 6Section 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
SEQ Regional Plan 20. The application involves (tick appicable boxes) -
Fw more srformabon refer (o schedule 2 of the [1 (i) a material change of use of premises -
P equigttan. . : : -
Refer to Chapter 2, part SA and schedule 10 of {a} ina Major Development Area in the Urban Footprint for -
the Integrated Planning Act 1997, and schedule C1 (i) anurban activity -
2 othe Regulatory Provisions for relevant (1 inan area included in a structure plan where the IPA, section 3.1.6
Unless you answered "none of the above” to applies;
(20, the application requires assessment by the {_]_ in an area not included in a structure plan where -
2 nage ment (OUM) « the IPA, section 3.1.6 applies to the application for the material change
of use; or
¢ the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
[] (ii) intensive animal husbandry, or
CJ (ii) residential development involving a rural residential purpose
{b) in the Regional Landscape and Rural Production Area for -
[) (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
@ (d) in the Investigation Area for -
{] (i) an urban activity and not specified in section 2.10(2);
(] (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
C1 (iii) intensive animal husbandry
C1 (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
JL. (b) not specified in section 3.1(2).
(iii) none of the above
Fisheries matters 21, The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the IP _]{i) an assessable material change of use for aquaculture - complete Part 0; of Form 1:
Requlation, 1 “ . . ae :
Unless you answered “none of the above" to C1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
021, the application requires assessment by the complete Part Os of Form 1;
(patient of Prima Insts and Fisheries [| (iii) assessable operational work completely or partly within a declared fish habitat area-
If an agency other than DPI&F is the assessment complete Part Or of Form 1;
manager for the application, DPI&F is a (“] (iv) assessable operational work that is the removal, destruction or damage of a marine
@ concurrence agency for the application in pl ant - complete Part Oz of Form 1;
relation to items (f) ~ (iv) and an advice agency ' .
in retation to item (¥). [J (v) evelopment assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
(vi) none of the above.
Page 7Section 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Integration of land use and public 22. The application involves: (tick the applicable box/es)—
rns POT non refer to Guide 23, schedule C (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the IP Regulation, mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule.
application triggers referval to QT as a
concurrence agency. (C1 (ii) reconfiguring a lot—
(J (a) _ on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
(J {b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
{_] (c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m:? or greater;
(1 (d) for aresidential purpose within the 25 ANEF contour for an airport;
CJ (e) for a residential purpose resulting in 100 or more allotments.
J (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on Jand that—
[J (a) is completely or partly within a public transport corridor or a future public
transport corridor,
(J (b) will result in work that encroaches into an airport's operational airspace.
@ rh me of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)-—
For more information refer to Guide 23, schedule i) a material change of use assessable against the planning scheme for a purpose
BA ofthe IPA & schedule 2 ofthe IP Regulation. 4 mentioned in schedule 13D of the IP Regulation ond exceeding the thresholds set by that
Unless you answered “none of the above’, the
application triggers referral to QT as a schedule.
concurrence agency. (J (ii) reconfiguring a lot—
[J (a) oniand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[_](b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
CJ (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
[1] (@) . on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(1) (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1 (f} for a residential purpose resulting in 100 or more allotments.
(J (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
@ above, involving extracting, excavating or filling greater than 50m, on land that—
C1 (a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(J (b) is completely or partly within future railway land, or a railway tunne! easement;
(J (c) abuts rail corridor land, commercial corridor land or future railway land, and
ho. the work is within 25m of the railway boundary.
(iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: {fick the applicable box/es}—
ene d*none ofthe above’, the _) (i) a material change of use assessable against the planning scheme and not associated
application triggers refera to the holder of with reconfiguring a lot, and any structure or work will be located wholly or partly in the
pipeline licence No 1 issued under t he Petroleum easement.
Act 1923, currently Santos QNT Pty Utd, for TD (ii) reconfiguring a lot
aance. (] (iii) operational work assessable against the planning scheme, that is filling, excavation,
i work is located wholly or partly in the easement.
Compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
{iv) none of the above.
Page 8Section 15
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 20, 2 April 2007
Koala habitat area 25. The application involves: (tick the applicable box/es)—
oe onan. eter ee and C (i) a material change of use of premises in a koala conservation area or koala
Unless you answered ‘none of the above", the sustainability area made assessable under a planning scheme, that is not for a domestic
application requires referral to the Environmental activity and will result in -
Protection Agency as @ concurrence agency. C1 (a) clearing of native vegetation over an area greater than 2500m?;
[-] (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
(J (c)_ an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;
(J (d) extracting gravel, rock or sand from an area greater than 5000m2;
(J (e) excavating or filling an area greater than 5000m?;
(1 (f) additional traffic in a koata conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
1 (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -
(J (a) an increased number of lots;
(] (b) clearing of native vegetation over an area greater than 2500m?.
(] (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.
@ CJ (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
. mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -
CJ {a) clearing of native vegetation over an area greater than 2500m?;
[J (b) extracting gravel, rock or sand from an area greater than 5000m?;
U, [1] (c) excavating or filling an area greater than 5000m2.
(v) none of the above.
Wild river area 26. Does the application involve development in a wild river area declared under the Wild Rivers Act
For more information, refer to Guide 27 2005,
If you answered YE §$ fo 26, you must also NO
complete section 2 of this checklist. This will
enable you to determine if your application can C1 YES
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area,
Note: Development can be “prohibited” in a wild
fiver area because the application cannot be
accepted by the assessment manager.
Preliminary Approval 27. Does the application involve a development for which preliminary approval is sought under
@ Ifyou answered YES to Q27, the application Sectioet 3.1.6 of the integrated Planning Act 1997?
triggers referrat to the Department of Local
Government, Pianning, Sport and Recreation as NO
an advice agency, oO YES
Wetlands 28. The application involves: (tick the applicable boxes) -
comestic atv the construct (1 (i) amaterial change of use, other than for a domestic activity, assessable against the
mestic activity means the construction or use . we wae .
of a single residence on alot and any reasonably ____ Planning scheme that is in or within 100m of a wetland;
associated building or structure. Examples of a C) (ii) reconfiguring a lot -
bung 0 strvhire that could be reasonab y or within 100m of a wetland that will result in
asso with a singie residence include: ‘ 1
caretakers residence, granny flat, buitding or L (a) more than 10 lots being created; or
structure used for a home business. O (b) lots less than 5 hectares;
(iii} none of the above
Note: Wetland is defined in the Integrated
Planning Regulation 1998.
Unless you answered “none of the above” to
Q28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
Page 9Section 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 20, 2 April 2007
Conservation Estate 29. The application involves: (tick the applicable box/es)—
Urban purposes is defined in the Integrated CI (i) a material change of use for urban purposes that is in or within 100m of any of the
Planning Act 1997 as “purposes for which land is following -
vsedin Sco pic aibri A ales CJ (a) aprotected area, forest reserve, critical habitat or area of major interest under
purposes, but not cluding environmental, the Nature Conservation Act 1992:;
conservation, rural, natural or wildemess area [_] (b) a State forest or timber reserve under the Forestry Act 1959;
purposes". (1 (c) amarine park under the Marine Parks Act 2004;
Unless you answered “none of the above" to [_] (d) arecreation area under the Recreation Area Management Act 1988;
en A ee ee ae vice CJ (e) aworld heritage area listed under the World Heritage Convention;
agency for the application. (J (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
(1) (ii) reconfiguring a lot if -
] (a) any part of the lot is situated in, or within 100m of, any of-the following -
C1 (i) — aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
(J (ii} a State forest or timber reserve under the Forestry Act 1959;
C1 fii) a marine park under the Marine Parks Act 2004;
["] (iv) arecreation area under the Recreation Area Management Act 1988;
[J (v) aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
["] (b) the reconfiguration involves more than 10 lots being created, or any lot
@ A resulting from the reconfiguring is less than Sha;
{ili} none of the above.
Page 10
|Section 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
(completion mandatory if the proposed development is located in a wild river area)
a a nS 2 OU SRS ODORS E
Wild River Area 1, Which wild river area is the development proposed in?
it the responsibility of the applicant to
determine if the development Is proposed in NIA
a wild river area.
Information about wild river areas including the The proposed development is to be located in: (tick the applicable boxes)
geographical location and position of . . .
management areas in retation to properties, can {] i) ahigh preservation area (HPA);
be accessed by contacting the Department of os . .
Natural Resources and Water (NRW), accessing [_] ii) a preservation area (PA) ;
contacting the department by email on: O . ) id n er oo P g ( )
the department's website www.nrw.ald.cov.au oF iii) a wild river floodplain management area (FMA);
wild rivers@now al6.aov.au (J iv) a wild river nominated waterway;
Note on Referrals [_] v) a designated urban area (DUA).
Referrals for development in a wild river area
(other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For information regarding development in a wild
river area, see the relevant wild river declaration
and Guida 27. The relevant wild river
@ declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.
Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration, .
Environmentally relevant activities |2. Does the proposed development only involve any of the following environmentally relevant
(ERAs) in a designated urban area activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
If you answered YES, your application for an : :
ERA is exempt from any wild river requirements i) An ERA 28 or ERA 14; or
and provided there are no other aspects of this ii) A )ével 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
development that require assessment against
wild rivers, you do not need to complete the NO C] YES (ensure you have completed Part G of Form 1}
} remaining questions in Section 2.
If you answered NO to Q2, please complete the
remaining questions in Section 2.
Clearing native vegetation 3. Is the-4pplication operational work for clearing native vegetation in a HPA?
for which an application to clear nafive NO C] YES (ensure you have completed Part J of Form 1)
If YES, there are a limited number of purposes
vegetation may be accepted in a HPA. See
Guide 27 fora list of relevant purposes for | 4 if YES, is the clearing?
which an application may be made in a HPA. . . . . . .
ifYES and you ticked 4 box I the application [1] i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
may be made and is assessable agains! the Wild area of agriculture in a HPA (see Guide 27); or
Rivers Code. !f YES and you ticked Q4 box fi sey ' . .
the application will not be accepted. [] ii) in a HPA outside a registered area of agriculture?
Note: If clearing native vegetation is ina PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
aoply, do not complete the remaining questions
in Section 2.
Page 11Section 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Works in tidal areas, coastal 5. 1s the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-_
management districts and fish habitat utenen in a wild river area)
areas
If you answered YES to Q5, and ticked any NO OC YES
boxes in Q6}, your application is required to be ooo, .
assessed against and must comply with the Wild | 6. The application is for one or more of the following:
Rivers Code. . . co . oy
if you answered YES to QS and ticked box 7) in Cc i) Operational works that is tidal works or works in a coastal management district (ensure you
Q6, your application is required to be referred to have completed Part M and/or Part P of Form 1); OF
the EPA. vs . : .
Note: If specifed works are roposed in aca (J ii) Operatio rks for the removal, destruction o1 9g plants (ensure you have
i rational works f |, destruction or damage of marine plants
government area, it is prescribed tidal work — the completed Part O2 of Form 1); Of
relevant local government will be the sem ae q . :
seeccsrent evager with the EPA as 2 {_] iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
concurrence agency
If you answered YES to Q5, and ticked box ji) or
iti) in Q6, your application requizes referral to
OPIF.
{f you answered NO to Q5 and ticked box i} in
Q6, the application will not be accepted.
If you answered NO to Q5, ticked box fi) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or ff a
required permit is hetd, the application must be
assessed against and must comply with tha Wild
Rivers Code. Applications for purposes other
@ than specified works or as described above will
not be accepted.
If you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located [email protected] more information about specified works refer
to Guide 27
Residential, commercial or industrial |7. _|s the application for residential, commercial or industrial development in a designated urban
development area
not subject to wild river requirements. Provided NO CJ YES
If you answered YES to Q7, your application is
there are no other aspects of this development
that require assessment against the relevant wild) 8° |f NO@oes the application for residential, commercial or industrial development involve:
river declaration or Wikd Rivers Code, you do not ‘ ; PP , e ; P ;
need to complete the remaining questions in i) a material change of use made assessable in a local government planning scheme
Section 2 (ensure you have completed Part D of Form 1); or
If you answered NO to Q7 and ticked either box . . . . .
i} oF ii} in Q8, the assessing agency is the [_] i) operational works associated with reconfiguring a lot (ensure you have completed Part F
relevant local goverment. The application must f F 1)
ofrorm 1).
be assessed against and must comply with the
Wild Rivers Code.
@ Animal husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as defined
Ifyou answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?
wires assessment against and must comply
vith the Wild Rivars Code. C] NO | YES (ensure you have completed Part R of Form 1)
The assessing agency is NRW.
Note: Applications for animal husband ry
activities will not be accepted if proposed in a
HPA, For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
If you answered YES to Q10, your application oh
requires assessment against and must comply
with the Wild Rivers Cale. NO [_] YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW. . —
Note: Applications for agricultural activities wil | 11. If YES is the application for:
not be accepted if proposed in a HPA, For more ' : .
details and a definition of agricultural activities O i) a material change of use; or
see the Wild Rivers Act 2005 and refer to Guide C] il) operational works
2. .
Tha production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
Page 12Section 19
° .
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Works that take overland flow water | 12. tno. application involve works that take overland flow water in a HPA or an FMA?
The relevant wild river declaration will state
works that take overland flow water are either NO [_} YES (ensure you have completed Part Ke of Form 1)
self assessable of assessable, or are exempt
from wild river requirements. 13. If YES, is the application for works stated in the relevant wild river declaration to be?
If you ticked Q13 i}, your application must be .
assessed by NRW against the Wiki Rivers Code [J i) assessable works
and must comply with the code. (J ii) self-assessable works
If you ticked Q13 fi) an application is not required ee
to be made however the works must comply with [J iti) exempt works
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 ili} your application is not
subject to wild river requirements,
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted. t
Works that interfere with overland =| 14. wen application involve works that interfere with overland flow water in a FMA?
flow water NO YES feted Part Kio of Form 1
The relevant wild river declaration will state [1] YES (ensure you nave completed Part Kw of Form 1)
works that interfere with overland flow water that : oo . oo .
are either self assessable, assessable or exempt} 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
@} from wild river requirements. oO . bl rk
If you ticked Q15 i), your application must be i) assessable works
assessed by NRW against the Wild Rivers Code {1} ii) self-assessable works
and must comply with the code. .
ff you ficked Q15 ii) an application is not required L iit) exempt works
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable davelopment for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q15 iil) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated tp be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works 16. Does the application involve building or raising waterway barrier works in a PA?
Applications for building or raising waterway [Ac
barier works in a HPA will aot be accepted. NO [_] YES (ensure you have completed Part Os of Form 1)
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
® Aquaculture (non ERA) 17. Does je application involve aquaculture in a PA?
ee for aquaculture in a HPA will not be NO [] YES (ensure you have completed Part O; of Form 1)
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code,
Works that interfere with waterina | 18. Does the application involve operational works that interfere with water in a watercourse that is in
watercourse a nomjaated waterway in a PA?
Note: if the development is proposed in a HPA,
applications for all works that interfere with water 0 [-] Yes (ensure you have completed the relevant Part K of Form 1)
in a watercourse (including dams or weirs,
stream realignment or stream diversion) willnot | 49° If YES
be accepted. | oo, ; ;
in aPA, appications for instream dams and [_} i) The application is for an instream dam or weir; or
weirs may be accepted in nominated waterways. +. eg ‘ ' . . '
ff you ticked box i) in Q48, your application wil Cr) it) The application is for operational works that interfere with water in a watercourse, and is
nat be accepted. for development other than a dam or weir.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department’s website
www.orw.gld dov.au or contacting the
department by email on:
wild. [email protected] aov.au.
Page 13Section 20
° .
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Environmentally relevant activities 120. Does jHé application involve an ERA?
be accepted, Applications which may be made NO Cj YES (ensure you have completed Part G of Formt)
Most applications for an ERA in a HPA will not
require referral io the EPA, The assessment of
some ERAs is assessed by NRW, othershave 121. Is theapplication for an ERA 20 instream?
been devolved to DPIF, NRW or delegated
local goverment (see EPA website for more NO [_] YES
information on devolv ed ERAs}
If you answered NO to 20 you do notneedto | 22. |s a quafry allocation notice held for the proposed ERA 20 instream?
complete Qs 21-24.
tf you answered YES to Q20 and the 0 LJ Yes
development is in a PA, your application must be
assessed by the administering authority2* ination | cnn i 9
against the Wild Rivers Code and must comply 23. Does the application involve any of the following in a HPA?
with the code, untess the proposal is for i) a level 2 ERA 11, (and is for specified works or a residential complex}
development where an application will not be “ .
accepted, or is exempt from wild river ii) an ERA 19 (dredging)
Serna fay conection ail not be accept d iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
for the development by answering Q21 ~ 024. the Wild Rivers Act 2005, and Environmental Protection Act 1994)
If you answered NO to Q21, you do not need to iv) an 22 (out of stream)
complete Q22. If you answered YES to Q21 you
are required to completa Q22. NO C) YES
if you answered NO to Q22, the application will
not be accepted. If you answered YES toQ22, 124 ts the proposed development for ERA 20 (out of stream) and;
the application must be assessed by NRW ina FMA: and
against the Wid Rivers Code and must comply — ina : an
@ with the code. ~ notlow impact; and
If ‘ed NO to Q23 and the devel t ‘ : : :
is proposed in the HPA the application wit ot be — npttor a residential complex in the area, or for specified works.
application must be assessed by the EPA or NO L YES
accepted. {f you answered YES to 023, the
NRW (as prescribed in schedule 8A of the IPA} :
against the Wild Rivers Code and must comply
with the code.
If you answered YES to Q24 the application will
not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the coda,
Exempt ERAs in a designated urban
area
If the development is proposed in a designated
urban area there may be no wild river
requirements. See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other han exempt ERAs in a
designated urban area).
Documentation _ 25. Has documentation been included with the application describing how the applicant proposes to
if you answered NO to Q28, your application comply with the mandatory requirements, required outcomes, and/ or performance requirements
may be subject to an information request and : f the Wild Ri Code?
processing of the application may be delayed. as set out in the relevant part/s of the Wild Rivers Code?
@ NO Lives
2) The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14Section 21
.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007
SECTION 3 — BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the DAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go fo schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
schedule 2A of the IP Reaulation. (IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia.
deemed refusal.
Fire safety for budget accommodation {2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more inkormation go to schedule 2 of the iP the subject of the application requires the installation of a fire safety system for a budget accommodation
Beculaton building.
Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves a workplace incorporating spray painting.
Regulation
Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedule 2 of the {P retail meat premises.
Regulation
Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a private health facility.
Regulation
@ Workplace area less than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR} as an advice agency if the
For more information go to schedule 2 of the (P application involves a work place area less that 2.3m?,
Reguiation
Land contiguous to a State-controlled |7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
toad agency if the application involves tand contiguous to a State-controlled road.
For more information go to schedule 2 of the IP
Regulation
Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the [P if the application involves pastoral workers accommodation.
Regulation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the IP application involves a childcare centre.
Reaulation
Coastal development 10. An apptication may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line.
Regulation
Heritage 14. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a heritage registered place.
Regulation
Fisheries matters 12. An application may trigger referral to ihe Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the [P concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Reaulagen as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.
e Integration of land use and public 13. An application may trigger referral to Queensiand Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace?3.
For more information go to schedule 2 of the |P
Regulation
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
For more information go to schedule 2 of the {P involves future railway land.
Regulation
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :
. particular building work for single e for asingle detached class 1 building or class 10 structure; and
detached class 1 building or class 10 e the focal government has declared by resolution the following:
building or structure — the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedule 2 table 1 of the the locality; and
PRepulabon. — the appearance of the building or structure would be in extreme conflict with the character of the
Assessmant period 15 days. No response is a locality
deemed approval. .
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
3 Operational airspace is as defined in State Planning Policy 102 "Development in the Vicinity of Certain Akports and Aviation Facilities”.
Page 15Section 22
° ‘
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Whether particular buildings may be |16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go t schedule 2 table 7 of the
IP Regulation.
Assessment period 15 days. No response is a
deemed refusal.
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
IP Regulation. 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.
1P Requitation.
Assessment period 15 days. No response is 4
deemed refusal.
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the ¢ — complies with the performance criteria of the Queensland Develapment code part 15; and
{P Regulation and the QDC part 15. e the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. No response is a
© deemed refusal.
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
(P Requlatign and the QOC part 20. referral to the local government as the concurrence agency.
Assessment period 15 days. No response is a
deemed refusal.
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For mora information go to schedule 2 table 1 of the
IP Requlation.
Assessment period § days. No response is a
deemed refusal.
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
designated rainwater tank area building work or structure complies with the relevant performance criteria if -
For more information go to schedule 2 table 1 of the « Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
IP Requlaton and the QDC part 25. building work, in a designated rainwater tank area; and
Assessment period 15 days. No response is a e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
deemed refusal. solution for a relevant performance criteria.
Page 16Section 23
INTEGRATED PLANNING ACT 1997 Pari D, Version 2.0, 4 October 2004
“Bo B.A” Catm 4-Davalanment Annlicai weafhedre! Ly RSE a Ey et diners
a) Ea See elsnr eve DL=y i=) eyossle ie eV ye) 6 -1\(0)e epee me te er ent eee Ot
Ae Ror ARERR ar i A RE ey De beeg cte acheie eS SEES Sg oe ae Eg Pe,
L. — a
yy Materialchangeofuse &S
ma RE: Tai ‘an ae ! ! i jem Ce Ne
ae : 5 z ess ES
ees epee |= ESS
@ assessable against a local government's planning scheme = g Le
. Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.
Nature of the application 11. This appkéation is for: (tick 1 or both if applicable) , a _ _
seep eaon aie ssinary | ~ (Preliminary approval for a material change of use of premises including conceptual
approval sa step in the approval process - design for any associated works that require approval under the planning scheme fie,
and does not authorise development to occur. . consideration ofthe proposal concept)
@ oo: 4 7" |} Development permit for a material chiatige of use of premises including conceptual a
i eae ce design for any associated works that require approval under the planning scheme.
The subjectland ~° * -._. [2,.. How thé subject land is identified in the planning scheme (name the zone, precinct etc) ©
the planning scheme against which the 5} -/ LL SN NO —— : :
application wil be assessed/ foe : ee oe me
| oe LA, Ae eg any exsing easements onthe land? a Oo
ae uel fo EMO Co
oS ge home 1" (7) YES ~ attach plans of the location and details of the purpose of the easement Se
Material change of use details. :. |5.-.. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
Pe vacant land to industry (tyre manufacturing) etc.) - a oo
Qtr aie fa, Ste cover Co a
applicable) a, pe ie ats — —_— ob tty mo
For the definition of “site cover’, “gross floor > fi . Oe TO
area” and “storey” go to the planning scheme 9. Gross floor area: .. SSine : - Loos ,
against which the application will be “os . Ee -
assessed, ae _. |10, Number of on-site car parking spaces: .
11. Number of storeys / maximum height above natural ground:
| Hours and dg the use wiloperte [J
Associated operational works details |14, Details of associated operational works (eg. landscaping, cut and fil, drainage, road works ele.)
4
a
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
I
OFFICE US E ONLY (applicable fo assessment manager)
EG EE ae ReDas yh act aie * 2a P| ERE RENCE =a
+t TE: enh itty atte ee ta ant tetSection 24
F622
2t— 2000
aan
il Hee Mien
jo-2}
272) /
|
aia 6006
Db'|b
Ib
19%
TSIT
Ree RES NG Gliese 20%
a nn PROPOSED EXTENSIONS
90 PERSIMMON DRIVE
PEREGIAN BEACH Q 4573
WS [09°38 CASSIDY RESIDENCE
6000 AGENTI ARCHITECTS
S PTYL
2/20 NAIRANA REST
(LAYOUT NOOSA HEADS Q 4567
PH: (07) 5447 2989
MOB: 0412 379 557
EGrivish) eens Ar g 2007
DAY \BY DWG NO: 0753-WDI
OAgenti Architects P/LSection 25
“<p
oll as Bore es CxXSWVO <p PROPOSED EXTENSIONS
PERS
PEREGIAN DRIVE Q 4573
CASSIDY RESIDENCE
00 Ss AGENTI ARCHITECTS
NOOSA HEADS Q 4567
coe blat al [% (07) 54472989
MOB: 0412 379 557
Acco ! “7 ? Fy DATE; APRIL 2007
a rH fa IM | (0% bwo No: 0758- Wp
ater rer rr at
A er |
COSC nN
Tt | A 1 heed (172) A? CONE Ooo iteots P/L
[Pool ee BOP Ni zt Se eee oe ne 9 OF
Areca oS
eres Set
ZOO SE840028R: ====
A
a (fon) Gucnne)
a ARTE
Hee HA by et 2400
a ECE ia
Pt ie
“wd of tt ee Qo
| 7H be “/570
| to . Ley
fn Ps
a as |
| | as]
me
| Pt ed pé Ag ae
Co
—+ ee oly US sti" fire
BpOX ||| "eee IE oe oan al — AIL re) far”
W
CO [KSIUPY,
| zl q is (zx)
het,
sa Os Ky ) KY BV Walle 7p. N
DS i Ss Li 7 SS q
ih beqm 0 Y A yl Hp HED ie ofedh ALG
oy IS ot
— ree 2 rAa0OX ZOO bepress foe
= 7 Por
7
— ma
| | —_!: aT SS 7 deh A iH = =2y |
Ae
ae ITN. UU,
CBS,
We soe Oe
tee mi x i/
via LaF
beam over |. A ROO Ja be LR NAL
AV
Lyre oh
REAL IK... ose a TO £00 AS)
Wall | & mer ESE
1
are Yer# boos
COD CAT:
— eh
OOR fi Bp
LAYOULSection 26
J
lahing
i a a ee
—_——— ee te Pp
CEILING ashing
fe. renolered ne Te! O0CO
UW
Cay) _ Fi ™ in|
[YU J
FLOOR jp Al pepe een ee nd ot oo OT ooo poe ern) fe} ee
al sheen cm en =<
~~ CEILING >. |} —_____-_—_- : rh fO218 EET Ne |
|
aia X |_| SAF I ]00
er.
AY
ro? DL | 24 BI INES oop
[FLeO _—— ethnerennamnl
4 |
fPshing
Lf ity
4
os
20. ij
CRILUING outers
i Hi A hoe 4 Oo feshing 3600
ett LS
| [064% Fe igole
rad Ali FL CTE TON Ka ef 7
OU h | SS or
SS JO PO ——— =
oe a sl ee .
ES . ir Ss Bacar
4 C) oy} exist
2 CAIHTUC! Rae
BS Be
DOL Lv (oN Be tH) K/L ee
ACY)
EEE Oe
ROUND
S
ORTH a CIN PROPOSED EXTENSIONS
€ 90 PERSIMMON
PEREGIAN DRIVE Q 4573
CASSIDY RESIDENCE
AGENTI ARCHITECTS
PTY LTD
2/20 NAIRANA REST
NOOSA HEADS Q 4567
PH: (07) 5447 2989
MOB: 0412 379 557
aie re 2007
wo NO: SEB np b
{ha
Agenti Architects P/LSection 27
flusnvg
CMT
|_| fC CA STEICA PAG CO:
CRIUNGS {it red ie
hocd Q\n4A- 2\%00 re
r A/L. tA4 |
DEST
| OO) pe SSS es Ps
Ob0b i Be, sw
Alt
St NE yn een ene ne ance tnenenpaenen
Nal FACU
Es eel
ml ERE 266 |
QUTH 2469 ESE FO
WEST
flashing
Porton
CEILING [OCHA ~AnNnine
0 CKO
rg TBE
2000 . ee ee 4. Te ||
Q i
| [Bir ll || 2428 FG Aa Shere
| COK ht se ed
CEIURE tt phe eee : af ab X20
ren
le C ATA
uctine SOUTH cs re DAA. IAC >| > cafes syeremehamtarasnesmamanal
Ore)
EY a ne a
= PIRND
PROPOSED EXTENSIONS
90 PERSIMMON DRIVE
PEREGIAN BEACH Q 4573
CASSIDY RESIDENCE
AGENTI ARCHITECTS
PTY
220 NAIRANA REST I
NOOSA HEADS Q 4567
(07) 5447 2989
EGEIVED OB: 0412 379 $57
Ae ATOO 2007
DWON NO: O72 WD
@Agenti Architects P/LSection 28
LODO 6000 SO, 7510
PH fou
EIS
Pen iB oiler
VIN, Lea hee utter
ge FRX|E0 (2) CHIEt | W
a all
pt
yt
||
a'S,
PNA I
ra outer
£00 | 5 Lora] gg nn
@,00 | Lured
hee hood
(A)
HV VoIb ”
Fl IS
— —_——" re ee
PROPOSED EXTENSIONS
PERSIMMON DRIVE
PEREGIAN BEACH Q 4573
CASSIDY RESIDENCE
AGENTI ARCHITECTS
Ser NOOSA HEADS Q 4567
PH: (07) 5447 2989
MOB: 0412 379 557
SCA mea oO
RIVER lowoll.b725- 3
FLOOR 2 m=
Agenil Architects P/L
LAYOUTSection 29
Bee ar
}
=. Ef Ww een tenses
a
Her:
_ |
BOX, evr map DS PATS | UNE _
SSS SS
= 1a ‘i |BeO te i
=F
et to FLOOR, -————
RAVES
Aim DE dt
Te
LLexteindg
HH aA OT La \ PPaiz _ nat CEILING
p-Joo
4 WA NY oe
pee? i
ptt
—
~ SECTION “exstiel Epis a slid sy Lae
rT ery oH] AS
OENFvV
CRAG
meee eres: ee Ly ] Ce] Q | ent en chee at ee
CRILING VV INEIAL Pu ns
ase
Ot vi Se {\ ——. 2000 |
—- te [any NI
| | PACA IC KLIPLOK ____t
KO HA} CY
Adhawel
FLOOR YT Tn tg Sie
tag re er Pom
es a) ae ee ee engl es oe” 2 —_——
Ee | (
ST
to fT) i
CEILING ir al Loe
TOS
\
Deo
\ cone [4 | AA es cco see me ree va
EXISTING CH q]
ee a S| x! RSL 6, 4
nan
SECTION
BB PROPOSED EXTENSIONS
90 PERSIMMON DRIVE
PEREGIAN BEACH Q 4573
CASSIDY RESIDENCE
AGENTI ARCHITECTS
2/20 NAIRANA REST
NOOSA HEADS Q 4567
PH: (07) 5447 2989
rebS
Gey MOB: 0412 379 557
BL BY DATE: aria L 2007
DWG NO: | eR-W6
SCALE:
© Agenti Architects P/LSection 30
: NOOSA COUNCIL
. _. REQUESTFOR DEBTORS INVOICE — |
_| Accounts Receivable Use Only .
DEBTOR HO:
DEBTOR NAME: GMA Cort fg bro Grew.
_| DEBTOR ADDRESS: fo fame Oly? | |
| NOOSA AEE Bc Lk Slate - .
: .
DETAILS TO APPEAR ON THE INVOICE: Yee to tan, Prt chunng . .
Apir.io to, — Go Persinuen Or here. ye Beaches
Nu be (7/201 oe |
AMOUNT(Excluding GST) \fean, 7 $ 650 .
Cana. ya
| GST AMOUNT i pranee ke $ .
TOTAL AMOUNT (Including GST) | be fp Pte $ b6JO |
, nn AMeJ ’ |
J r Sub Activity
REVENUE GENERAL LEDGER NUMBER: /L2c2 [y23 | v3 |
: . ! |
Work Order Number Task Activity
AUTHORISING OFFICER'S SIGNATURE: [- > Krenn . |
| AUTHORISING OFFICER’S NAME: (Please Print) ’s OEM J
DATE: tte op CONTACTHO: =Slkeyas2g?
POST INVOICE | | OR RETURN TO
| Please Note! All of the sections above MUST be completed.
Office Use Only ‘ ; - . . |
Revenue Account Name: .
_ | Revenue Type: | a :
GST: YES | | NO | | Processed [ | |
ARe: \prod\word\forms\requestdebtorsinvoice.doc 27/2/2007Used in these records
0015E693.001.pdfRelated documentPublic source context ↗
07/1646 - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.