Council archive · source document
0015E693.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work thatis tidal work or 19. The application involves operational! work that is: ( tick the applicable boxes)
work in coastal management dist (qi) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed Hdl tidal workin Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
local government tidal areas refer to Guide 24 (J (i) tidal work that is prescribed tidal work" other than in a canal'? -complete Part P of Form 1:
Unless you answered ‘none of the above” to 09, or
the application requires assessment by the . . a oe
Environmental Protection Agsney (EPA). (1) (ii) carried out within a coastal management district under the Coastal Act and for - compiete
if an agency other than EPA is the assessment Part M of Form 1 if any box/es (a) to () below are ticked.
See ee oecate application in C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
relation to this matter. other than those works in tidal water) where the development has been determined not
Local govemment is the assessment manager to be assessable against the Water Act 2000 ;
for ail prescribed tidal work. [J (b) constructing a canal intended to be connected to tidal waters;
[1 (c}_ constructing an artificial waterway:
(1 (d) reclaiming land under tidal water;
LJ (e) disposing of dredge spoil or other solid waste material in tidal water;
C1 (f)__ interfering with quarry material on State coastal land above high-water mark;
L(g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
LJ (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
© (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{iv} none of the above.
Operational work below high water 10. The application involves operational work that is: ( tick the applicable boxes)
mar stonation refer to Guide 18. For (1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
local goverment tidal areas refer to Guide 24, (CJ (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
Uniess you answered “none of the above” to vee . ve ye
ato, the application triggers referral to ( (iii) carried out within a coastal management district's under the Coastal Act and for -
Queensland Transport (QT) (Maritime Safety i. i i i jal in ti _
Cid) as a concurrence agency. He uspoeng of dredge spoil or other solid waste material in tidal water - complete Part
0
Local goverment is the assessment manager '
for all prescribed tidal work. [J (b) reclaiming land under tidal water ~ complete Part M of Form 1; Or
(c) constructing a canal, if the canal is associated with reconfiguring a lot — complete
Part M of Farm 7,
(iv) none of the above.
Coastal management 11. The application involves: (fick the applicable box/es)
For more information refer to Guide 18. (}{i) a material change of use assessable under a planning scheme involving operational
Olt the colcchon tenes ssveccment y the work carried out completely or partly in a coastal management district
© Environmental Protection Agency (EPA). C1 (ii) a material change of use assessable under a planning scheme involving building
‘ it an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is —
EE ne ape y for be apakcaton i « the construction of a new premises with a GFA'® of at least 1000m?
relation to this matter, « the enlargement of the GFA of existing premises by more than 1000m2
g gp y
(] (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
(1 (iv), reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
h the construction of a canal - complete Pat MofForm1
(v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulatian 2003 and includes certain tidal works completely or partly within a local government tidal area.
45 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 44 of the IPA to mean the gross floor area. For a definition of haw to cakulated GFA, go to the planning scheme against which the application is being assessed.
17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E693.001.pdfRelated documentPublic source context ↗
07/1646 - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.