Council archive · source document
0015E693.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
rm ¥A ke On Seg arm. 41° Tye past kat ee Hi os cies Sint ce SL TS aie nS ps.
BL NE Wt, Sa eapR ee ghia cir nea PT MRR nag ie ESS Po, von teittac, Rae T RR EN et CBRE REE IRE on Seg gens
ee ee AAU AG OU Wal ofeec Ula a 3 ae ne ee 3
a eS sa ee
eo ee Re Oa a
Pescara es
’/ Operational &/or building work
ble against a local t’s planning sch |
aSSsessabie against a iocai governments planning scneme
. _ Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable
; against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
i. " design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time). :
‘ peer econ cetttys tet eet woe ee ee ce ee frm ae ee ee ee ee Eee ee
or SR ee . we ae = ee I a ET MS LANE DOA PY REE seer fair + " .
s Nature of the Works - 1. The apgtcation is seeking approval of (tick one (1) or both if applicable):
The types of work that veerined by ggainst uilding work assessable against a planning scheme - provide details of the aspects of building
#4 planning scheme are determin . rk (e.g. building height greater than 8.5m; buildi igh fandstip risk
* achéine for & paricutar local government and work (e.g. building height greater than uilding work on high fandstip risk area}
To determine the types of work thatare | -_["] Operational work assessable against a planning scheme - provide details of the nature of the
© _ assessable under a particular planning nn operational work (e.g: roadworks; landscaping; Grainage works; stormwater, water infrastructure; sewerage. -
+ Scheme, contact the relevantlocal . __.. Infrastructure; earthworks; clearing vegetation; signage) ~ > Ta aed i
.govemment. , . : at - a . a
“Me inomatoainOisrecessayiog $= f Ld ,
® Statistical and planning purposes. =} 2. Js the application for operational work involving the creation ofnewlots? 9 * es
i 4 “oR o e [ed “Eko -[] YES ~ specify number of new jots to be created below rn ef
Goat Ng wom ay ot ny lg ce wa Rw , we a ed a BB,
Pee om 13. Does J proposal involve the construction of 4 canal that is associated with reconfiguring a lot?*
Pye 2 Looe Coerh, y ” ee Ph ae Pe ene ma Goole et, nae ic woe Ty s ee mT *
soe Pere ee oy & DANO. GIVES. Coos, ae ore Oe OE oO Ea Gate Care
"Nature of the application ” ao, [4.7 This application is for: (tick one (1) or both if applicable), ~~, eo pe RT aa
eos, iF 4 “eS : “ee wet tt £ ee aT po age’ Ss gy UN: ot ae “he Loy .
: A development permit authorises | — op Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
{ development to occur, while a preliminary * ‘infrastructure,etc =. OR pe PR am a
i approval is a step in the approval process: | | $-—— - - SEAEEAEEREEEEEEEEEeEED = a .
{and does otauborse deveopmentto oot} |
Fee ee ge ae SP 7 [EJ Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage 4
be we oe LS OM f+ ay. infrastructure, ete. eB to eo. 2 Be OE
he dee a Pe bb ~ - s
Pee eee Ry .
@ me “Sg 2 2.315) ° Are thé works subsequent to a previous development permit or preliminary approval? eR
woe go Sa le Of INO} 2 EL YES - provie detaiis of at previous approvals’ 7°
& fy Tbe Seay’ . * cook ak RO . . a aa . : : _ : : . . .
PULP om cs ep 7 Ty [Ea List of approval peferencels.: [Date approved Te Date approval iapses.-]
he er Saag ere ee ee Pee aS Oe aE — te: Sage ma eT ag a ee na Se TEE ONT iinet a Soa ERE eT EE PEM NET CORRS ES NE GEER BC
~~~ Portable Long Service Leave levy (i~| 6: 1s pay ent ofa Portable Cong Service teave (PESty levy applicable to the proposal?
applicable) , :* - . Bete ; MR a as ES = complete Q7 . a tee. “i = -. : = - * st : aoe oo . “As
‘Prior to issuing a development permit for the . ome % : ve a em . Poe
, Works, the assessment manager is required ~ | 5: » LINO ~-07, 8&9 do not apply ?~ i fem
j by law to “sight” an approved form, issued by Jo nO Fe Soy Me Bop FA a,
‘ Qleave, which signifies thatthe PLSL levy. 17.2: Has the PLSLlevy been paid?..°- ok
thas been paid, ee a a | DN ESccomobtedaie toe See Bg
{For further inforiation refer to “mde | oe one se ha pe we TE LEE a
‘hitpsiwwwoleavegid.gov.a xe we S|. [-] NO - the applicable levy mist be paid before a development pemnit can be given for the works oF .
ae . ms lee 7 - fest . e a Beg Se * Se TS Zz me . : an ‘ ae
} . Q 7 . . 2 2, . 5 . . ; m= 7 - ; - ee . fa o h ° . ; a mh ‘ Tey
to oe Ph ge |8.+ How much was paid? =. we BR Sg a SL at -
f . Y a ™ a4 . es ee, + ° - oa, a - ee ay T ~ * y ~ ~F _. a " =
= - 7. * 5 "7 19. Whatis'the receipt number of the payment? *. CR RySee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E693.001.pdfRelated documentPublic source context ↗
07/1646 - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.