Skip to the record
Accept no imitations.

Council archive · source document

0015E693.001

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                          IDAS Assessment Checklist, Version 20, 2 April 2007
                   State-controlled road matters           2.   The application involves: (tick appiicable box/es)
                   For more information refer to Guide 3,       C1 ())  development on land contiguousé to a State controlled road and for -
                   Unless you answered ‘none of the above” to Q2,                     .                                    .             .
                   the application triggers referral to the Department  (| (a) material change of use assessable against the planning scheme;
                   een     eee tance Ova tease                          (J (b) reconfiguring a lot unless -
                    pen. Oi inather chert ances DMR will                       « the total number of lots is not increased; and
                   be a concurrence agency.                                    « the total number of lots abutting the State-controlled road is not increased;
                   Schedule 2 of the IP Requlation will assist you to                   :                     -      .         .                               .
                   determine where DMR is an advice or                   Di) operational work (not associated with a material change of use assessable against the
                   concurrence agency for the epplication.                      planning scheme or reconfiguring a fot mentioned in (b) above}-
                                                                                e associated with access to a State-controlled road; or
                                                                                « for filling or excavation; or
                                                                                + involving the redirection or intensification of site stormwater from the land, through a
                                                                                  pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                                  State-controlled road.
                                                                (_] (ii) development on land not contiguous to a State-controlled road and -
                                                                         (J (a} material change of use -
                                                                               * assessable against the local government's planning scheme; and
                                                                               * mentioned in schedule 5 of the 1P Regulation and exceeding the thresholds set by
                                                                                  that schedule;
                                                                         (-) (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the iP regulation
                                                                                 and exceeding the thresholds set by that schedule;
      @                                                                  LJ (c) operational work (not associated with a material change of use assessable against the
                                                                                 planning scheme or reconfiguring a lot mentioned in (b) above)—
                                                                               « assessable against the local government's planning scheme; and
                                                                               « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                                  that schedule.
,                                                                   (iii) none of the above
                   Clearing vegetation                     3.   The application involves: (tick applicable box/es)
                   For more information refer to Guide 12.      C (i) material change of use —
                  for etoaicn ros aeeessrenat by fe 03,                   (a)  assessable against the planning scheme;
                   Beperient of Natural Resources and Wait Resources and Water (b) ona lot containing -
                   Itan agency other than NRW is the assessment                * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
                   manager for the application, NRWis@                         «  if there is no property map of assessable vegetation for the lot - remnant vegetation;
                  concurrence agency for the application in ration        (c)  where the existing use of the land is a rural or environmental use; and
                   if you ticked Q3{i) or (i), your application requires  (a) where the size of the land is 2 hectares or larger - complete Part J of Form 1
                   referral to NRW for assessment regardless of CJ (ii)  reconfiguring alot—
                  whether vegetation clearing is proposed or not.                              ,
                                                                         {a)   ona lot containing a category 1, 2 or 3 area shown on a property map of
                                                                               assessable vegetation or, if there is no property map of assessable vegetation for
                                                                               the lot, remnant vegetation;
      @                                                                   (b}  where the size of the lot before the reconfiguration is 2 hectares or larger;
                                                                          (c)  where 2 or more lots are created; and
                                                                          {d)  where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                                                C1 (ili)  operational work -
                                                                          (a)  for the clearing of native vegetation where the vegetation clearing is made
                                                                               assessable under Schedule 8 of the IPA; and
                                                                          (b)  not associated with a material change of use assessable against the planning
                                                                               scheme mentioned in (i) or reconfiguring a Jot mentioned in (ii) - complete Part J of
                                                                               Form 1
                                                                    {iv}  none of the above.
                   Strategic port land                     4.   The application involves:
                   For more information refer to Guide 11.       CJ (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
                   If you ticked {i) - the relevant Port Authority is the Act) - complete Part! of Form 1
                   assessment manager for the application.                       :                       _          .       ;
                   If you ticked (i!) Queensland Transport is a  LJ @i) a material change of use that is inconsistent with the land use plan approved under the
                   concurrence agency for the application.              TI Act for the strategic port land - complete Part t of Form 1
                                                                    {iii} none of the above

                   4  Land contiguous to a State-contolled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-contolled road; or that is part of a future State-
                      controlled road.
                                                                                               Page 2

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E693.001.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.