Original source · versioned page text
Bushfire Hazard Assessment
Very large file: it may take a few minutes
The original of this document is very large (32.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Bushfire Hazard Assessment 14 Serenity Close, Noosa Heads 8 SUMMARY The Bushfire Hazard Assessment (BHA) has been prepared by Litoria Consulting on behalf of Calile Malouf Investments for land described as 14 Serenity Close, Noosa Heads Qld (Lots 10 and 11 on SP 195871). The purpose of the BHA was to: i. Identify and measure site-specific factors which contribute to bushfire hazard, ii. Assess the extent of bushfire prone areas (post-development) and calculate: a. Potential fire intensity (PFI, kW/m), b. Radiant heat flux (kW/m2). c. For development within areas of potential fireline intensity or the potential impact buffer (100m), assess Bushfire Attack Level (BAL) in accordance with Australian Standard 3959:2018 Construction of buildings in bushfire- prone areas (AS 3959:2018). iii. Where applicable, identify management measures to achieve compliance with the hazard and risk outcomes sought by: a. State Planning Policy (SPP), b. Noosa Plan (2020). Bushfire hazard for the study area was modelled according to the methods described in Bushfire Resilient Communities (Queensland Fire and Emergency Services 2019) and Leonard et al. (2014), including the creation of a quantitative model of potential bushfire fireline intensity (PFI, kW/m). The fire behaviour modelling was carried out via GIS spatial modelling using rasterised inputs described by Leonard et al. (2014): i. Fuel load based on site-specific assessment of vegetation hazard class; ii. Maximum landscape slope; and, iii. Fire weather severity/FFDI. As the proposed development involves changes to the configuration of vegetation within the site assessment area, a post-development map of VHCs was necessary. The post- development map incorporated: i. the proposed development footprint, ii. vegetation retention outcomes proposed as part of the development of the land, iii. other differences between VHCs observed from a combination site-based survey and desktop methods. Modelling results based on the AEP 5% FFDI indicated that: ● the subject land did not contain areas of potential fireline intensity, 24 | 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.