Original source · versioned page text
Bushfire Hazard Assessment
Very large file (32.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Bushfire Hazard Assessment 14 Serenity Close, Noosa Heads Performance outcomes Acceptable outcomes Compliance OR AO3.2 Where there is no available reticulated water supply, the premises has: an accessible dam, swimming pool or water tank available for fire fighting purposes with an onsite water volume of not less than 5,000 litres; and a water supply outlet pipe 50 millimetres in diameter fitted with a standard fire brigade fitting connected to the water supply (other than where the water supply is in a swimming pool or dam). Editor’s Note—Water supply capacity for fire fighting purposes is in addition to water supply capacity for other uses and activities on the premises. Essential Community Infrastructure PO4 AO4.1 Not applicable. Essential community infrastructure Development involving essential is able to function effectively during community infrastructure is not located and immediately after bushfire within a medium or high bushfire hazard events. area. OR AO4.2 Where located in a medium or high bushfire hazard area, development involving essential community infrastructure is designed to function effectively during and after a bushfire event in accordance with a Bushfire Hazard Management Plan. Editor’s Note— PSP8 Natural Hazards provides guidance for assessing bushfire hazard risk and preparing a bushfire hazard management plan. Hazardous Materials PO5 AO5 Not applicable. Public safety and the environment Hazardous materials are not are not adversely affected by the 36 | 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.