Original source · versioned page text
SUPERSEDED Decision Notice - Other Change - 132004 4029 01 & RAL22 0010 [As Published]
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with
the requirements of the National Construction Code - Building Code of Australia (Volume
1) as they relate to people with disabilities. Your attention is also directed to the fact
that in addition to the requirements of the National Construction Code as they relate to
people with disabilities, one or more of the following may impact on the proposed
building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development
Assessment Branch to arrange a Development Compliance Inspection.
Resubmission of Amended Plans Required
4. The conditions of this Decision Notice require resubmission of plan/s to Council with
amendments. Please address the amended plan/s to Council’s Development
Assessment Branch with the Reference No. 132004.4029.01 separate to any
Operational Works application. To avoid delays and assessment issues with the
Operational Works application, it is recommended the plan/s be resubmitted prior to
lodgement of any Operational Works application. However, should the plan/s not be
submitted, the applicant is advised that a Preliminary Approval may be issued in lieu of
a Development Permit.
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid.
Co-ordination of Operational Works Assessment
6. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Qualified Person
7. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
8. has a degree in civil engineering or engineering geology; and
9. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Infrastructure Charges
10. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Page 11 of 20
Document Set ID: 22435165
Version: 5, Version Date: 23/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original