Original source · versioned page text
Revised Civil Design Plans
Attached to the e-mail Applicants Response to Information Request - MCU20/0159 OPW20/0245 - 11 Vision Court, Noosaville.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EROSION AND SEDIMENT CONTROL PROGRAM EROSION AND SEDIMENT CONTROL NOTES
DISCHARGE QUALITY NOTES
SEDIMENT & EROSION PLAN
·
·
·
·
·
ORDER OF CONSTRUCTION
WARNING
TYPICAL SILT FENCE DETAIL GULLY INLET PROTECTION
HOLD POINT
TEMPORARY CONSTRUCTION
FIELD INLET PROTECTION
ENTRY/EXT SEDIMENT TRAP
Status:
NOTES Client: KAREN & GRAHAM LEONARD Designed: SFD Drawn: TAK Title: Date: DECEMBER 2020 Scale: AS NOTED
Issue Amendment Date Dft 1. This is the property of the engineer, and may not be Sunshine Coast Office Bundaberg Office
A FOR APPROVAL 08.12.20 TAK used, copied, or reproduced wholly, or in part without the
express permission of the engineer. Infringement in any
L2, 13 Norval Court Maroochydore Q 4558
PO Box 102 Mooloolaba Q 4557
66A Barolin Street Bundaberg Q 4670
PO Box 2052 Bundaberg Q 4670
Project: PROPOSED INDUSTRIAL DEVELOPMENT Approved: EROSION AND SEDIMENT CONTROL Job Ref No: Drawing No: Issue:
way may result in legal action. LOT 4 VISION COURT,
2. Figured dimensions take precedence over scaled.
3. Verify all dimensions on site. ACN 112761510 ABN 21112761510
Engineering P: 07 5477 6437
E: [email protected]
P: 07 4154 4894
E: [email protected]
NOOSAVILLE
NOTES AND DETAILS SC-8737 C010 A
GAVIN EVANS / RPEQ: 8054
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.