Original source · versioned page text
Delegated Report - Code - Planning OPW17 0600
Author Monkeith Kadhum Development Engineer APPLICATION DETAILS Application No. OPW17/0600 Applicant Melvin Russell Skilton Proposal Operational Works - Vehicle Crossover Properly Made Date 27 December 2017 Decision Due Date 21 Feb 18 Report Completed Date 15 Jan 18 Number of Submissions Not Applicable PROPERTY DETAILS Property Address 176 Eumundi Noosa Rd Noosaville Qld 4566 RP Description Lot 26 SP 151406 No related Land Land Area 16640 Square Metres Existing Use of Land Vacant Site (Light Industry/Commercial) PROPOSAL The application seeks approval for a Development Permit for Operational Works - Vehicle Crossover. site details Background This site has recently given a frontage to new road (Vision Court) as a result of a recent (Light Industry) subdivision on an adjoining land. assessment Instruments for Statutory Assessment This application is assessed against: The Noosa Plan. The following codes from the Noosa Plan are applicable to this development: Engineering Works Codes. The application has been found to generally comply with all applicable statutory instruments and engineering standards. The pertinent issues arising out of the assessment are discussed below: General Comment The applicant has not provided details for future development on the site as such the exact location and detailed engineering design of the proposed driveway have not been supplied. The applicant has indicated that he wishes to obtain an approval for a driveway to ensure that the site can have an access via the new frontage to the site to Vision Court which was created due to a recent adjacent subdivision. There is no critical issues arising from the proposal and it is considered that the proposed access crossover can constructed in compliance with the relevant standards and standard drawing/s. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. RECOMMENDATION With regard to Application No OPW17/0600 for an Operational Works - Vehicle Crossover situated at 176 Eumundi Noosa Rd Noosaville Qld 4566 and described as Lot 26 SP 151406 No related Land, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW17/0600 Street address: 176 Eumundi Noosa Road, Noosaville Qld 4566 Real property description: Lot 26 SP 151406 Planning Scheme: The Noosa Plan (3 July 2017) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Vehicle Crossover CURRENCY PERIOD of approval The currency period for this development approval is 2 years starting the day that this development approval takes effect. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval shall generally comply with the approved plans of development. The approved plans are listed in the following table and as amended by the conditions of this permit. Plan No. Rev. Plan Description Date - - driveway & Allotment Plan As Annotated By Council in Red Undated SITE SPECIFIC CONDITIONS This permit approval is for a vehicular crossing over the road grassed verge of Vision Court and not related to the extension of the driveway into the subject site.* * Refer to Advisory Notes 1 and 2 The driveway design and construction including the kerb tapers must match the existing levels of the Kerb & Channel and the grassed verge without creating fall and/or trip hazards. The driveway must be located so that it and its kerb tapers will not project onto the frontage of any adjoining property. The driveway must be located so that its kerb tapers will have a minimum clearance of 500mm for the lentil of any existing Council stormwater pit and/or kerb inlet. The road grassed verge must be reinstated to smoothly match the levels of the new driveway and any existing services (eg stormwater pit, sewer manhole, Telstra pit) to minimise potential of trip and fall hazard. Any necessary adjustments to the levels of existing services, if required, must be referred to and approved by the relevant service providers with all cost be met by the applicant/owners. Upon completion of the work and prior to the final inspection a certificate must be issued by a Registered Professional Engineer Queensland (RPEQ) certifying that the proposed driveway have been constructed in accordance with the conditions of this permit and to grades that prevent standard vehicle from scraping pavement (of the driveway and/or the road) or bottoming down. PRIOR TO COMMENCEMENT OF WORKS Engineering A condition report including photographs of the frontage of the site must be completed for future reference and made available to Council at the prestart meeting. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The prestart meeting must include the relevant parties for the following aspects of the works: Civil engineering works. A traffic management measures must be implemented and discussed with Council’s inspector at the prestart meeting and must specifically address the following: Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) to provide warning to drivers and road users of any safety hazard or changes to traffic conditions due to the proposed works. Fencing to the work site during the construction phase as may be necessary to ensure the safety of the public and the road users. Provision for safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Providing safe parking arrangements for all machinery, appliances and cars during construction phase without adversely impacting on the traffic flows, traffic safety and the availability of parking spaces along the local streets. DURING CONSTRUCTION General The developer must meet any costs to repair any damage caused to Council and/or public assets including existing services and streetscape during carrying out the works, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions of this permit approval. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Driveways Driveway crossovers must be constructed generally in accordance with the approved plans and as directed by the supervising/certifying RPEQ and in compliance with the relevant requirements of AS 2890.1 and IPWEA Standard Drawings RS-051, and must : Have surface consists of either an approved hot mixed asphaltic concrete or plain concrete. Have a slip resistant surface. Be constructed so as not to concentrate stormwater runoff, increase flows or cause ponding onto neighbouring properties and road verge. Have a minimum clearance of 500mm from any Unitywater/Telstra asset, unless a written approval is obtained from Unitywater/ Telstra and submitted to Council. The property access must be located a minimum of 1m clear of any existing power poles, streetlights and/or street signage. Any existing unnecessary or redundant property access and/or driveway laybacks to this frontage of the site must be removed, and the kerb, footpath and verge area reinstated in a manner to match the footpath, kerb and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and should be generally certified by an RPEQ. Stormwater Drainage Any stormwater kerb outlet in a close proximity to the edge of the new driveway must be provided with an approved durable kerb adaptor. Any proposed surface stormwater grated channel or pit must be located wholly within private property. Environment (Erosion and Sediment Control) Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site, particular attention must be given to prevent sediment from entering into Council’s street stormwater drainage system. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). FOLLOWING CONSTRUCTION Certification and Final Inspection Following the certification of the works by the supervising RPEQ, a final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Prior to constructing the proposed crossover, it is recommended that a design or concept for the future development on the site be prepared so the access point be located appropriately to correspond with design of the development. It should be noted that access driveway will likely to require significant earthworks (excavation) within the site to achieve grades compliant with Council requirement and the applicable engineering standards Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the drawings has not been undertaken. The applicant/developer bears responsibility for all aspects of the design. It is recommended that a professional advice or design by a Registered Professional Engineer Queensland (RPEQ) is obtained prior to construction. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with any applicable fees. Prestart, Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights. If Council officers are required to undertake additional inspections of the same works, re-inspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Environmental Advisory notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. property notes Not applicable. VARIATION approval Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 6 of 6 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Delegated Report - Code - Planning OPW17 0600.docx)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.