Skip to the record
Every meeting, every word.

Council archive · source document

OUTSTANDING ISSUES RESPONSE -Structural Engineering Response Letter · MCU25/0020

of 2

Text shows just the words. Original shows the document exactly as it was published.

works. Once the permanent basement walls are constructed, the temporary piles will be made structurally
redundant and will not form part of the permanent building envelope.


Yours faithfully




TOM HARRINGTON – RPEQ 27698
For and on behalf of
SCG CONSULTING ENGINEERS




SCG Consulting Engineers                       Page 2 of 2                              SCG Ref: 0280(L1)

Used in these records

About this file

File size
403 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OUTSTANDING ISSUES RESPONSE -Structural Engineering Response Letter.pdf · 403 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.