Council archive · source document
OUTSTANDING ISSUES RESPONSE -Structural Engineering Response Letter · MCU25/0020
works. Once the permanent basement walls are constructed, the temporary piles will be made structurally redundant and will not form part of the permanent building envelope. Yours faithfully TOM HARRINGTON – RPEQ 27698 For and on behalf of SCG CONSULTING ENGINEERS SCG Consulting Engineers Page 2 of 2 SCG Ref: 0280(L1)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OUTSTANDING ISSUES RESPONSE -Structural Engineering Response Letter.pdfRelated documentApplication case desk ↗
About this file
- File size
- 403 KB (small file)
- File type
No other editions are linked here.