Skip to the record
The gold standard in government transparency.

Original source · versioned page text

SUPERSEDED - Decision Notice - OPW23 0084 [As Published]

of 12

Page text shows just the words. Original shows the document exactly as it was published.

                        Plan No.             Rev.       Plan/Document Name                       Date

                        S23-036-C02          A          Site Plan                                19 May 2023
                                                        Prepared by Westera Partners

                        S23-036-C03          A          Civil Works Plan 01 of 02                19 May 2023
                                                        Prepared by Westera Partners

                        S23-036-C04          A          Civil Works Plan 02 of 02                19 May 2023
                                                        Prepared by Westera Partners

                        S23-036-W02          A          Water Works Site Plan                    19 May 2023
                                                        Prepared by Westera Partners

                        22-079A (1)          A1         Electricity Reticulation                 4 August 2023
                                                        Prepared by Jeannotte Engineering

                        22-079A (2)          A1         Electricity Reticulation                 4 August 2023
                                                        Prepared by Jeannotte Engineering

                        PR0704               0          Fauna Management Plan                    28 July 2023
                                                        Prepared by Biodiverse Environmental

                        PR0704               0          Rehabilitation Management Plan           28 July 2023
                                                        Prepared by Biodiverse Environmental

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 5 September 2025, unless an application to extend the currency
                      period is approved by Council.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               3.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               4.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Arboreal works;
                      c.      Fauna management works;
                      d.      Rehabilitation works; and
                      e.      Other relevant parties.
               5.     A preliminary Construction Management Plan must be submitted to Council prior to the pre-
                      start meeting and must specifically address the following:
                      a.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD); and



                                                                                                    Page 2 of 12
Document Set ID: 22571595
Version: 3, Version Date: 06/09/2023
Log in to download the original file

SUPERSEDED - Decision Notice - OPW23 0084 [As Published].pdf · 169 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.