33. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
Damage to Services and Assets
34. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY
Bonds
35. Bonds must:
a. Meet the requirements of the relevant Council Planning Scheme Policy for performance
and uncompleted works;
b. Be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. Be requested for release by writing to Council, when relevant approval requirements
have been met.
36. Performance Bonds must be lodged for:
a. Rehabilitation.
On Maintenance
37. Maintenance periods* must be:
a. 36 months for Rehabilitation or subject to meeting final performance criteria.
*(Refer to Advisory Note)
38. Prior to requesting an On Maintenance inspection, the following information package
(prepared by respective qualified persons* and certifying compliance with approvals) must
be submitted to Council:
a. All required bonds;
b. Landscaping certification;
c. Pest Plant certification; and
d. Bushfire management certification.
Off Maintenance
39. Prior to requesting an Off Maintenance inspection the following must be provided:
a. Written request of bond release; and
b. Rehabilitation certification confirming all works have been met all performance
outcomes in accordance with conditions of approval.
Page 7 of 12
Document Set ID: 22571595
Version: 3, Version Date: 06/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original