Cover Letter
Attached to the e-mail Doonella Stage C - (Email 1 of 7) - Engineering Drawings Part 2 & cover letter - OPW14/0197.
Report) dated 18/09/2005 and Doonella Noosa Stormwater and Water Quality Management Plan Final
Report Addendum dated July, 2012 previously submitted with the Reconfiguration of a Lot application.
» Clearing: All vegetation cleared from the site is proposed to be mulched and respread on disturbed areas as a
means of erosion and sediment control.
» Acid Sulfate Soils: The development has no excavation work below RL5.00m and therefore no further testing
or prevention measures are proposed.
» Flooding: The Flood Investigation and Stormwater Quantity Management Plan prepared by Brown
Consulting (QLD) Pty Ltd (copy attached) details predicted flow levels for this site and recommends minimum
allotment levels to provide flooding immunity in accordance with QUDM and Noosa Shire Council standards.
» Traffic and Construction Management: Prior to a pre-start meeting being held on site, both Construction
Management and Traffic Management Plans will be provided by the successful tenderer for the construction
of the development.
» Revegetation: The enclosed landscape operational works plans show proposed revegetation of all disturbed
areas within the environmental corridor, including plant species proposed for periodic wet areas.
We also advise:
» the Project Superintendent will be Brent Thomas, Brown Consulting (Qld) Pty Ltd with the Superintendent’s
Representative to be nominated at a later date;
» Testing will be in accordance with Brown Consulting (Qld) Pty Ltd Specifications and Council’s Planning
Scheme Policy;
» The Q Leave payment has been made and the receipt is attached.
» Operational Works design is based on standards and requirements forming part of the Noosa Plan.
Should you require any further information please do not hesitate to contact the undersigned.
Yours sincerely
Brown Consulting (QLD) Pty Ltd
Shaun Pilcher
Senior Engineer - Urban Development
ATTACHMENTS
1. IDAS Forms 1 and 6
2. Engineering Drawings as per document transmittal
3. Landscape drawings prepared by AECOM
4. Flood investigation and Stormwater Management Plan prepared by Brown Consulting (Qld) Pty Ltd
5. Stormwater Management Plan (Quantity) Updated management Strategy prepared by Brown Consulting (QLD) Pty Ltd
6. Qleave Receipt
COPIES:
1. Greg Mackney, QM Properties