Council archive · source document
08/0413 - MCU - Detached House [As Published] · 132008.413
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
Applicant details (coritinued}
Individual/ contact person details
Tite | MIR. | First namo | DAM ons [Lastname L RANKIN
Postal address P-0. Box (42 PEREQIAN BEACH 4572
Contact telephone number O7 S4us aall
Mobile phone number OL.0® S767 S38
Facsimile number om CSuUus 2a
e-mail address d-rankin @ bg pond. net. an.
Owner’s consent and resource entitlement
10. Does the application involve a State-owned resource prescribed by schedule 10 of the Integrated Planning Regulation 1998 (IP Reg) or
any other regulation?
& No oO Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or
entitlement
Table J
Nature of State-owned resource
Nature of evidence réquired
Allocation/entitiement vei Lins i State Govemment « Date of
reference number Name of authorising officer j Position of authorising officer Department Date of issue expiry
fr.
11. Does the application involve tand other than State-owned land (i.e. privately owned land) and require owner’s consent?
oO No by Yes - Complete Table K and submit, with the application, written documentation of all owner's consent
Table K
Owner name/s Street address or lot on plan description Date written consent was obtained
[._ [we PAT 0666 42 leRIKEET DRIVE fEB 2S" 2608
Mandatory attachments and supporting information
12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?
Dascription of attachment or information Title (if applicable) "
(e.g. Part C of Form 1, owner's consent, evidence of {e.g. Generaf Authority. James Street | Date Method of delivery to assessment
resource allocation/entitement, plans, drawings, reports) Traffic Report) ‘ . manager
[1._ |PART O, CHECKLIST, BWAEKS CONST 27/Z/08| HAND CELIVERED .
DRAWN INES . "t
Portable Long Service Leave (PLSL) levy for building and construction work
13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for the
application can be given?
LI No - Complete Q13/a)
13{a) Indicate the reason PLSL is not applicable.
LO The application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder hatvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests); or
LC All costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
3.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0413 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.