Council archive · source document
Minor Change Report OPW25 0042 02 (As Published) · OPW25/0042.02
Prepared by ALTA
A6769-24-D05 A DRAINAGE CROSS SECTIONS – 27 February
SHEET 3 2025
Prepared by ALTA
A6769-24-D06 AC DRAINAGE CROSS SECTIONS – 27 February
SHEET 4 2025 28
January 2026
Prepared by ALTA
A6769-24-D07 AC DRAINAGE LONG SECTION 27 February
2025 28
Prepared by ALTA
January 2026
A6769-24-D08 AB RAPID INFILTRATION DEVICE SITE 27 February
LAYOUT & CATCHMENT PLAN 2025 28
January 2026
Prepared by ALTA
A6769-24-D09 AB RAPID INFILTRATION CULVERT ‘RIC’ 27 February
LAYOUT 2025 28
January 2026
Prepared by ALTA
A6769-24-D10 A RAPID INFILTRATION CULVERT ‘RIC’ 27 February
SECTION 2025
Prepared by ALTA
A6769-24-WQ01 A WATER QUALITY LAYOUT 27 February
2025
Prepared by ALTA
A6769-24-WQ02 A WATER QUALITY DETAILS 27 February
2025
Prepared by ALTA
A6769-24-CA01 AC EXTERNAL CATCHMENT LAYOUT 27 February
2025 28
Prepared by ALTA
January 2026
A6779/25/SWMP OpW(A) STORMWATER MANAGEMENT PLAN Feb 2025
– Operational Works
Prepared by ALTA
Applicant’s Request
Although not specifically requested by the applicant, the proposed new works require the creation
of a new easement, burdening the subject site and benefitting Council.
The current approval does not include Council’s standard easement conditions or a specific
condition encompassing the diverted stormwater infrastructure.
It is recommended that Council’s standard easement conditions and a specific easement condition
are applied to the development approval.
Assessment of Request
Page 7 of 10
Document Set ID: 24542202
Version: 6, Version Date: 23/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report OPW25 0042 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.