Original source · versioned page text
On-Site Effluent Disposal Report
Revision Description Date
. . .
. . .
. . .
Surface
Drainage Good.
Vegetation Grasses &
Scattered Trees
BH 2
Borehole location.
ABN11 147 854 439
Slope Title: SITE PLAN - On-Site Effluent Disposal
measured as a percentage gradient from
AUSTRALIAN
high ground to low ground. SOIL INVESTIGATIONS Project R. Magee, 15 Jirrima Crescent
Cooroibah
Rev.
DO NOT DIMENSION OFF THIS DIAGRAM. Date: May 2021 Drg No.210264-ABS .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.