Original source · versioned page text
Archs - 2022-02-09T100137.799
5° 22.
22. 5°
450 450
WA1
3.54° 3.54°
CL-2
DP DPS TRM DP
W2.15
WA1 WA1
FIRST FLOOR
CL1
1 F.F ELEVATION 1
2.6 1 : 100
ALUMINIUM BATTEN
HORIZONTAL SCREENING TO
MATCH SCR2
CL-2
DPS x2
TRM DPS DPS
W2.2 W2.1
WA2 WA2
FIRST FLOOR
2 F.F ELEVATION 2
2.6 1 : 100
0 1 2 3 4m
1:100
ISSUE:PRELIMINARY DESIGN - NOT FOR sheet title:
© COPYRIGHT 2021 - M DESIGN ALTERTIONS & ADDITIONS: CONSTRUCTION
THE IDEAS AND CONCEPTS CONTAINED For: REV DESCRIPTION DATE
ELEVATIONS
WITHIN THIS DOCUMENT AND THE
M Design
DOCUMENT ITSELF REMAIN THE KIRSTY WILSON B FOR QUOTING 09.12.21
PO Box 290 D FOR CERTIFICATION 04.02.22 job no: drawn by:
INTELLECTUAL PROPERTY OF M DESIGN Project Address: JM
Peregian Beach QLD 4573
AND MAY NOT BE COPIED OR
2119
REPRODUCED IN PART OR IN WHOLE date:
QBCC No. 1066058 04.02.22
WITHOUT EXPRESSED WRITTEN 24 THE PENINSULA, NOOSAVILLE,
Contact: Michael Broeren
t. 07 5471 2721 PERMISSION FROM MICHAEL BROEREN QLD, 4567 scale (A3): drawing no:
t. 0422 969 645 OF M DESIGN. 1 : 100 4.3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.