INTEGRATED DESIGN NOTES FOR CONSTRUCTION RISK MANAGEMENT 7. MANUAL TASKS
COMPONENTS WITHIN THIS DESIGN WITH A MASS IN EXCESS OF 25KG SHOULD BE LIFTED BY TWO OR MORE WORKERS OR BY MECHANICAL
WORK HEALTH & SAFETY ACT 2011 LIFTING DEVICE. WHERE THIS IS NOT PRACTICAL, SUPPLIERS OR FABRICATORS SHOULD BE REQUIRED TO LIMIT THE COMPONENT MASS.
ALL MATERIAL PACKAGING, BUILDING AND MAINTENANCE COMPONENTS SHOULD CLEARLY SHOW THE TOTAL MASS OF PACKAGES AND
THIS FOLLOWING REPORT LISTS THE RECOMMENDED MINIMUM REQUIREMENTS UNDER THE WORK HEALTH AND SAFETY ACT 2011. THIS WHERE PRACTICAL ALL ITEMS SHOULD BE STORED ON SITE IN A WAY WHICH MINIMISES BENDING METHODS IN ALL AREAS WHERE LIFTING
REPORT HAS BEEN PREPARED BASED ON THE DRAFT CODE OF PRACTICE: MANAGING RISKS IN CONSTRUCTION WORK AND DISCUSSING MAY OCCUR. CONSTRUCTION, MAINTENANCE, AND DEMOLITION OF THIS BUILDING WILL REQUIRE THE USE OF PORTABLE TOOLS AND
THE RISKS WHICH THE CODE IDENTIFIES AS COMMON IN THE CONSTRUCTION OF BUILDINGS. THE BUILDER OWNER, CLIENT MUST ENSURE EQUIPMENT. THESE SHOULD BE FULLY MAINTAINED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND NOT USED WHERE
THAT ALL RELEVANT PERSONS ARE MADE AWARE OR F THE REPORT PROVISIONS. FAULTY OR (IN THE CASE OF ELECTRICAL EQUIPMENT) NOT CARRYING A CURRENT ELECTRICAL SAFETY TAG. ALL SAFETY GUARDS OR
THIS REPORT APPLIES NOT ONLY TO THE CONSTRUCTION STAGE BUT ALSO MAINTENANCE, RENOVATION, DEMOLITION AND TO THE DEVICES SHOULD BE REGULARLY CHECKED, AND PERSONAL PROTECTIVE EQUIPMENT SHOULD BE USED IN ACCORDANCE WITH
OPERATION OF THE BUILDING AS A WORKPLACE AND IT IS THE RESPONSIBILITY OF THE OWNER AND CONTRACTOR TO ENSURE THAT THE MANUFACTURER'S SPECIFICATION.
M Design
REPORT IS RETAINED AND DISPLAYED AND KEPT IN PROMINENT LOCATION DURING THE OPERATION OF THE BUILDING. PO Box 290
8. HAZARDOUS SUBSTANCES
POWDERED MATERIAL Peregian Beach QLD 4573
MANY MATERIALS USED IN THE CONSTRUCTION OF THIS BUILDING CAN CAUSE HARM IF INHALED IN POWDERED FORM. PERSONS WORKING QBCC No. 1066058
1. FALLS, SLIPS, TRIPS A)
WORKING AT HEIGHTS DURING CONSTRUCTION ON OR IN THE BUILDING DURING CONSTRUCTION, OPERATIONAL MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD VENTILATION AND Contact: Michael Broeren
WHEREVER POSSIBLE, COMPONENTS FOR THIS BUILDING SHOULD BE PREFABRICATED OFF-SITE OR AT GROUND LEVEL TO MINIMISE THE WEAR PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION WHILE USING POWDERED MATERIAL OR WHEN t. 07 5471 2721
RISK OF WORKERS FALLING MORE THAN TWO METERS. HOWEVER, CONSTRUCTION OF THIS BUILDING WILL REQUIRE WORKERS TO BE SANDING, DRILLING, CUTTING OR OTHERWISE DISTURBING OR CREATING POWDERED MATERIAL. t. 0422 969 645
WORKING AT HEIGHTS WHERE A FALL IN EXCESS OF TWO METERS IS POSSIBLE SHOULD PROVIDE SUITABLE BARRIER WHEREVER A TREATED TIMBER w. www.mdesign.com.au
PERSON IS REQUIRED TO WORK IN A SITUATION WHERE FALLING MORE THEN TWO METERS IS A POSSIBILITY. THE DESIGN OF THIS BUILDING INCLUDES PROVISIONS FOR THE INCLUSION OF TREATED TIMBER WITHIN THE STRUCTURE. DUST OR FUMES
DURING OPERATIONS OR MAINTENANCE FROM THIS MATERIAL CAN BE HARMFUL. PERSONS WORKING ON OR IN THE BUILDING DURING CONSTRUCTION, OPERATIONAL © COPYRIGHT 2021 - M DESIGN
CLEANING AND MAINTENANCE OF WINDOWS, WALLS ROOF OR OTHER COMPONENTS OF THIS BUILDING WILL REQUIRE PERSONS TO BE MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD VENTILATION AND WEAR PERSONAL PROTECTIVE EQUIPMENT INCLUDING THE IDEAS AND CONCEPTS CONTAINED
SITUATED WHERE A FALL FROM A HEIGHT IN EXCESS OF TWO METERS IS POSSIBLE. WHERE THIS TYPE OF ACTIVITY IS REQUIRED, PROTECTION AGAINST INHALATION WHILE USING POWDERED DISTURBING OR CREATING POWDERED MATERIAL. WITHIN THIS DOCUMENT AND THE
SCAFFOLDING, LADDERS OR TRESTLES SHOULD BE USED IN ACCORDANCE WITH RELEVANT CODES OF PRACTICE, REGULATIONS OR VOLATILE ORGANIC COMPOUNDS DOCUMENT ITSELF REMAIN THE
LEGISLATION. B. SLIPPERY OR UNEVEN SURFACES. MANY TYPES OF GLUE, SOLVENTS, SPRAY PACKS, PAINTS, VARNISHES AND SOME CLEANING MATERIALS AND DISINFECTANTS HAVE INTELLECTUAL PROPERTY OF
FLOOR FINISHES DANGEROUS EMISSIONS. AREAS WHERE THESE ARE USED SHOULD BE KEPT WELL VENTILATED WHILE THE MATERIAL IS BEING USED AND M DESIGN AND MAY NOT BE COPIED OR
THE OWNER IS RESPONSIBLE FOR THE SELECTION OF THE SURFACE FINISHES IN THE PEDESTRIAN TRAFFICABLE AREAS OF THIS BUILDING. FOR A PERIOD AFTER INSTALLATION. PERSONAL PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE MANUFACTURER'S
REPRODUCED IN PART OR IN WHOLE
SURFACES SHOULD BE SELECTED IN ACCORDANCE WITH AS HB 197:1999 AND AS/NZ 4586:2004 RECOMMENDATIONS FOR USE MUST BE CAREFULLY CONSIDERED AT ALL TIMES.
WITHOUT EXPRESSED WRITTEN
STEPS, LOOSE OBJECTS AND UNEVEN SURFACES SYNTHETIC MINERAL FIBRE
FIBERGLASS, ROCKWOOD, CERAMIC AND OTHER MATERIAL USED FOR THERMAL OR SOUND INSULATION MAY CONTAIN SYNTHETIC PERMISSION FROM MICHAEL BROEREN
WHERE STEPS AND/OR RAMPS ARE INCLUDED IN THE BUILDING WHICH MAY BE A HAZARD TO WORKERS CARRYING OBJECTS OR OF M DESIGN.
OTHERWISE OCCUPIED. STEPS SHOULD BE CLEARLY MARKED WITH BOTH VISUAL TACTILE WARNING DURING CONSTRUCTION, MINERAL FIBRE WHICH MAY BE HARMFUL IF INHALED OR IF IT COMES IN CONTACT WITH THE SKIN, EYES OR OTHER SENSITIVE PARTS OF
MAINTENANCE, DEMOLITION AND AT ALL TIMES WHEN BUILDING OPERATES AS A WORKPLACE. BUILDING OWNERS AND OCCUPIERS SHOULD THE BODY. PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST INHALATION OF HARMFUL MATERIAL SHOULD BE USED
09.12.21
04.02.22
WHEN INSTALLING, REMOVING OR WORKING NEAR BULK INSULATION MATERIAL.
DATE
MONITOR THE PEDESTRIAN ACCESS WAYS AND IN PARTICULAR ACCESS TO AREAS WHERE MAINTENANCE IS ROUTINELY CARRIED OUT TO
ENSURE THAT SURFACES HAVE NOT MOVED OR CRACKED SO THAT THEY BECOME UNEVEN AND PRESENT A TRIP HAZARD. SPILLS, LOOSE TIMBER FLOORS
MATERIAL, STRAY OBJECTS OR ANY OTHER MATTER THAT MAY CAUSE A SLIP OR TRIP HAZARD SHOULD BE CLEANED OR REMOVED FROM AREAS WHERE FINISHES ARE APPLIED SHOULD BE KEPT WELL VENTILATED DURING SANDING AND APPLICATION AND FOR A PERIOD AFTER
ACCESS WAYS. CONTRACTORS SHOULD BE REQUIRED TO MAINTAIN TIDY WORK SITE DURING CONSTRUCTION, MAINTENANCE OR INSTALLATION. PERSONAL PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE MANUFACTURER'S RECOMMENDATIONS FOR USE MUST
DEMOLITION TO REDUCE THE RISK OF TRIPS AND FALLS IN THE WORKPLACE. MATERIALS FOR CONSTRUCTION OR MAINTENANCE SHOULD BE CAREFULLY CONSIDERED AT ALL TIMES.
BE STORED IN DESIGNATED AREAS AWAY FROM ACCESS WAYS AND WORK AREAS.
9. CONFINED SPACES
2. FALLING OBJECTS EXCAVATION
LOOSE MATERIALS OR SMALL OBJECTS CONSTRUCTION OF THIS BUILDING AND SOME MAINTENANCE ON THE BUILDING MAY REQUIRE EXCAVATION AND INSTALLATION OF ITEMS
DESCRIPTION
CONSTRUCTION, MAINTENANCE OR DEMOLITION WORK ON OR AROUND THIS BUILDING IS LIKELY TO INVOLVE PERSONS WORKING ABOVE WITHIN EXCAVATIONS. WHERE PRACTICAL, INSTALLATION SHOULD BE CARRIED OUT USING METHODS WHICH DO NOT REQUIRE WORKERS
GROUND LEVEL OR ABOVE FLOOR LEVELS. WHERE THIS OCCURS ONE OR MORE OF THE FOLLOWING MEASURES SHOULD BE TAKEN TO TO ENTER THE EXCAVATION. WHERE THIS IS NOT PRACTICAL, ADEQUATE SUPPORT FOR THE EXCAVATION AREA SHOULD BE PROVIDED TO
AVOID OBJECTS FALLING FROM THE AREA WHERE THE WORK IS BEING CARRIED OUT ONTO PERSONS BELOW. 1. PREVENT OR RESTRICT PREVENT COLLAPSE. WARNING SIGNS AND BARRIERS TO PREVENT ACCIDENTAL OR UNAUTHORIZED ACCESS TO ALL EXCAVATION SHOULD
ACCESS TO SCAFFOLDING OR WORK PLATFORMS WHERE THE WORK IS BEING CARRIED OUT. 2. PROVIDE TOEBOARDS TO SCAFFOLDING OR BE PROVIDED.
FOR CERTIFICATION
WORK PLATFORMS. 3. PROVIDE PROTECTIVE STRUCTURE BELOW THE WORK AREA. 4. ENSURE THAT ALL PERSONS BELOW THE WORK ENCLOSED SPACES
AREA HAVE PERSONAL PROTECTIVE EQUIPMENT. WHERE WORKERS ARE REQUIRED TO ENTER ENCLOSED SPACES, AIR TESTING EQUIPMENT AND PERSONAL PROTECTIVE EQUIPMENT
FOR QUOTING
BUILDING COMPONENTS SHOULD BE PROVIDED.
DURING CONSTRUCTION, RENOVATION OR DEMOLITION OF THIS BUILDING, PARTS OF THE STRUCTURE INCLUDING FABRICATED SMALL SPACES
STEELWORK, HEAVY PANELS AND MANY OTHER COMPONENTS WILL REMAIN STANDING PRIOR TO OR AFTER SUPPORTING PARTS ARE IN WHERE SMALL SPACES WITHIN THIS BUILDING REQUIRE ACCESS BY CONSTRUCTION OR MAINTENANCE WORKERS PROVIDE WARNING
PLACE. CONTRACTORS SHOULD ENSURE THAT TEMPORARY BRACING OR OTHER REQUIRED SUPPORT IS IN PLACE AT ALL TIMES WHEN SIGNS AND BARRIERS TO UNAUTHORISED ACCESS. THESE SHOULD BE MAINTAINED THROUGHOUT THE LIFE OF THE BUILDING. WHERE
COLLAPSE WHICH MAY INJURE PERSONS IN THE AREA IS A POSSIBILITY. MECHANICAL LIFTING OF MATERIALS AND COMPONENTS DURING WORKERS ARE REQUIRED TO ENTER SMALL SPACES SHOULD BE SCHEDULED SO THAT ACCESS IS FOR SHORT PERIODS. MANUAL LIFTING
CONSTRUCTIONS, MAINTENANCE OR DEMOLITION PRESENTS A RISK OF FALLING OBJECTS. CONTRACTORS SHOULD ENSURE THAT AND OTHER MANUAL ACTIVITY SHOULD BE RESTRICTED IN SMALL SPACES.
REV
APPROPRIATE LIFTING DEVICES ARE USED, THAT LOADS ARE PROPERLY SECURED AND THAT ACCESS TO AREAS BELOW THE LOAD IS
D
B
PREVENTED OR RESTRICTED. 10. PUBLIC ACCESS
PUBLIC ACCESS TO CONSTRUCTION AND DEMOLITION SITES AND TO AREAS UNDER MAINTENANCE CAUSES RISK TO WORKERS AND
3. TRAFFIC MANAGEMENT PUBLIC. WARNING SIGNS AND SECURE BARRIERS TO UNAUTHORIZED ACCESS SHOULD BE PROVIDED. THE PERIMETER FENCE MUST BE
(FOR BUILDINGS ON A MAJOR ROAD, NARROW ROAD OR STEEPLY SLOPING ROAD) ADEQUATE AND BE OF A SUITABLE HEIGHT TO DETER ENTRY, E.G., 1800 HIGH AND BE CONSTRUCTED FROM DEDICATED MATERIALS AND BE
PARKING OF VEHICLES OR LOADING/UNLOADING OF VEHICLES ON THIS ROADWAY MAY CAUSE A TRAFFIC HAZARD. DURING CONSTRUCTION, DIFFICULT TO CLIMB. * BE DIFFICULT TO GAIN ACCESS UNDERNEATH AND GATES AND JOINTS IN THE FENCE SHOULD BE SECURE AND NOT
PRESENT A WEAK POINT FOR ENTRY. IN CASE OF EMERGENCY, BUILDERS MUST ENSURE SIGNS ARE CLEARLY VISIBLE FROM OUTSIDE THE
24 THE PENINSULA, NOOSAVILLE,
MAINTENANCE OR DEMOLITION OF THIS BUILDING DESIGNATED PARKING FOR WORKERS AND LOADING AREAS SHOULD BE PROVIDED.
TRAINED TRAFFIC MANAGEMENT PERSONNEL SHOULD BE RESPONSIBLE FOR THE SUPERVISION OF THESE AREAS. SITE, STATING THE NAMES AND CONTACT TELEPHONE NUMBERS OF THE PERSON WITH CONTROL OF THE BUILDING WORK. WHERE
(FOR BUILDINGS WHERE ON-SITE LOADING/UNLOADING IS RESTRICTED) ELECTRICAL INSTALLATIONS, EXCAVATIONS, PLANT, OR LOOSE MATERIALS ARE PRESENT THEY SHOULD BE SECURED WHEN NOT FULLY
CONSTRUCTION TO THIS BUILDING WILL REQUIRE LOADING AND UNLOADING OF MATERIALS ON THE ROADWAY. DELIVERIES SHOULD BE SUPERVISED.
WELL PLANNED TO AVOID CONGESTION OF LOADING AREAS AND TRAINED TRAFFIC MANAGEMENT PERSONNEL SHOULD BE USED TO
ALTERATIONS & ADDITIONS
SUPERVISE LOADING/UNLOADING AREAS. 11. OPERATIONAL USE OF BUILDINGS
(FOR ALL BUILDINGS) (FOR RESIDENTIAL BUILDINGS)
BUSY CONSTRUCTION OR DEMOLITION SITES PRESENT A RISK OF COLLISION WHERE DELIVERIES AND OTHER TRAFFIC ARE MOVING WITHIN THIS BUILDING HAS BEEN DESIGNED AS A RESIDENTIAL BUILDING. IF IT, AT A LATER DATE, IS USED OR INTENDED TO BE USED AS A
THE SITE. A TRAFFIC MANAGEMENT PLAN SUPERVISED BY TRAINED TRAFFIC MANAGEMENT PERSONNEL SHOULD BE ADOPTED FOR THE WORKPLACE, THE PROVISIONS OF THE WORK HEALTH AND SAFETY ACT. 2011 OR SUBSEQUENT REPLACEMENT ACT SHOULD BE APPLIED
WORK SITE. TO THE NEW USE.
4. SERVICES 12. OTHER HIGH-RISK ACTIVITY
PRELIMINARY DESIGN - NOT FOR CONSTRUCTION
RUPTURE OF SERVICES DURING EXCAVATION OR OTHER ACTIVITY CREATES A VARIETY OF RISKS INCLUDING RELEASE OF HAZARDOUS ALL ELECTRICAL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE MANAGING RISKS OF PLANT AT THE
MATERIAL. EXISTING SERVICES ARE LOCATED ON OR AROUND THIS SITE. WHERE KNOWN, THESE ARE IDENTIFIED ON THE PLANS BUT THE WORKPLACE. ALL WORK SHOULD BE CARRIED OUT IN ACCORDANCE WITH CODE OF PRACTICE: MANAGING NOISE AND PREVENTING
KIRSTY WILSON
EXACT LOCATION AND EXTENT OF SERVICES MAY VARY FROM THAT INDICATED. HEARING LOSS AT WORK. DUE TO THE HISTORY OF SERIOUS INCIDENTS, IT IS RECOMMENDED THAT PARTICULAR CARE BE EXERCISED
IN LOCATION WITH UNDERGROUND POWER POWER WHEN UNDERTAKING WORK INVOLVING STEEL CONSTRUCTION AND CONCRETE PLACEMENT. ALL ABOVE APPLIES.
LINES MUST BE DISCONNECTED, OR CAREFULLY LOCATED AND ADEQUATE WARNING SIGNS USED PRIOR TO ANY CONSTRUCTION,
MAINTENANCE OR DEMOLITION COMMENCING. SERVICES SHOULD BE LOCATED USING AN APPROPRIATE SERVICE (SUCH AS DIAL BEFORE SUSTAINABLE BUILDINGS
Project Address:
QLD, 4567
YOU DIG), APPROPRIATE EXCAVATION PRACTICE SHOULD BE USED AND, WHERE NECESSARY, SPECIALIST CONTRACTORS SHOULD BE USED.
WHERE OVERHEAD POWER LINES ARE NEAR OR ON THIS SITE – QDC MP4.1 - 13 APRIL 2010
THEY POSE A RISK OF ELECTROCUTION IF STRUCK OR APPROACHED BY LIFTING DEVICES OR OTHER PLANT AND PERSONS WORKING ABOVE ACCEPTABLE SOLUTIONS FOR ENERGY EFFICIENCY
GROUND LEVEL. WHERE THERE IS A DANGER OF THIS OCCURRING, POWER LINES SHOULD BE, WHERE PRACTICAL, DISCONNECTED OR - P1 TO COMPLY WITH PERFORMANCE REQUIREMENT P2.6.1 ANDP2.6.2 OF THE BUILDING CODE OF AUSTRALIA. - A1 VERIFICATION METHOD
RELOCATED. WHERE THIS IS NOT PRACTICAL ADEQUATE WARNING IN THE FORM OF BRIGHT COLOURED TAPE OR SIGNAGE SHOULD BE TO INDICATE ACHIEVEMENT OF AN ENERGY EQUIVALENT RATING OF NOT LESS THAN 6- STARS
USED OR A PROTECTIVE BARRIER PROVIDED.
For:
ENERGY EFFICIENT FIXTURES
5. MANUAL TASKS -A2 CLASS 1 AND CLASS 2 BUILDINGS AND AN ENCLOSED CLASS 10A BUILDING ATTACHED TO A CLASS 1 OR CLASS 2 BUILDING HAVE
COMPONENTS WITHIN THIS DESIGN WITH A MASS IN EXCESS OF 25KG SHOULD BE LIFTED BY TWO OR MORE WORKERS OR BY MECHANICAL ENERGY: - EFFICIENT LIGHTING FOR A MINIMUM OF 80 PER CENT OF THE TOTAL FIXED INTERNAL LIGHTING A3 IN CLASS 1 AND CLASS 2
LIFTING DEVICE. WHERE THIS IS NOT PRACTICAL, SUPPLIERS OR FABRICATORS SHOULD BE REQUIRED TO LIMIT THE COMPONENT MASS. ALL BUILDINGS, NEW AND REPLACEMENT AIR-CONDITIONERS HAVE AN EER OF AT LEAST 2.9. sheet title:
MATERIAL PACKAGING, BUILDING AND MAINTENANCE COMPONENTS SHOULD CLEARLY SHOW THE TOTAL MASS OF PACKAGES AND WHERE
PRACTICAL ALL ITEMS SHOULD BE STORED ON SITE IN A WAY WHICH MINIMISES BENDING METHODS IN ALL AREAS WHERE LIFTING MAY QDC MP4.1 - 13 APRIL 2010 GENERAL
OCCUR. CONSTRUCTION, MAINTENANCE, AND DEMOLITION OF THIS BUILDING WILL REQUIRE THE USE OF PORTABLE TOOLS AND EQUIPMENT. ACCEPTABLE SOLUTIONS FOR WATER CONSERVATION
THESE SHOULD BE FULLY MAINTAINED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS AND NOT USED WHERE FAULTY OR (IN THE - A4 SHOWER ROSES HAVE A MINIMUM 3-STAR WATER EFFICIENCY LABELLING AND STANDARDS RATING. -A5 TOILET CISTERNS (A) HAVE A NOTES
CASE OF ELECTRICAL EQUIPMENT) NOT CARRYING A CURRENT ELECTRICAL SAFETY TAG. ALL SAFETY GUARDS OR DEVICES SHOULD BE DUAL FLUSH FUNCTION AND HAVE A MINIMUM 4-STAR WATER EFFICIENCY LABELLING AND STANDARDS RATING; (B) ARE COMPATIBLE WITH
REGULARLY CHECKED, AND PERSONAL PROTECTIVE EQUIPMENT SHOULD BE USED IN ACCORDANCE WITH MANUFACTURER'S THE SIZE OF THE TOILET BOWL TO ALLOW FOR A PROPER FUNCTIONING OF THE TOILET. -A6 TAP WARE HAS A MINIMUM 3-STAR WATER job no: drawn by:
SPECIFICATION. EFFICIENCY LABELLING AND STANDARDS RATING FOR TAPS SERVING: (A) LAUNDRY TUBS, AND (B) KITCHEN SINKS, AND; (C) BASINS. 2119 JM
QLD PLUMBING & WASTEWATER CODE
ACCEPTABLE SOLUTIONS FOR HOT WATER SYSTEMS date: 04.02.22
- A1 A HEAT PUMP OR A SOLAR HOT WATER SYSTEM THAT IS ELIGIBLE TO RECEIVE AT LEAST 22 RENEWABLE ENERGY CERTIFICATES IN
BUILDING WITH 3 OR MORE BEDROOMS OR AT LEAST 14 RENEWABLE ENERGY CERTIFICATES IN A BUILDING WITH LESS THAN 3 BEDROOMS
OR A HAS HOT WATER SYSTEM WITH AN ENERGY RATING OF AT LEAST 5-STARS. -A4 HOT WATER SYSTEMS ARE INSTALLED AS CLOSE AS scale (A3): drawing no:
PRACTICAL TO THE BUILDING'S COMMON BATHROOM. 1 : 100 0.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.