Council archive · source document
Attachment D - Stormwater site retention · MCU18/0013
Attached to the e-mail Response to info request part 2 - MCU18/0013.
BRISBANE No. Date Issue Scale:
SITE RETENTION SECTIONS
AS SHOWN
Level 3 Limestore, 33 Longland St, Newstead
T 07 3852 4333 F 07 3852 4777
P1 MAR. 2018 SITE RETENTION ISSUE Designed: P.J.I
Sheet: S18-003 2.1
E [email protected]
Drafted: A.J.I
Job No. Sheet No.
Date: MAR. 2018
GOLD COAST Project: PROPOSED RESIDENCE
PARTNERS Level 3, 17 Welch St, Southport PAGE SIZE: A3
T 07 5571 1599 F 07 5571 1330
USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE PROJECT Location: 24 ARAKOON CRESCENT, SUNSHINE BEACH
E [email protected] ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE DRAWINGS P1
NORTHERN NSW
10 Shipstern St, Kingscliff
(A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM THEM IS VESTED IN
WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS STRICTLY PROHIBITED! Client: BRAD & SAM HOPPER
IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE CARRIED OUT WITH DUE CARE AND
www.westerapartners.com.au ABN 52 097 417 975
T 02 6674 8047 F 02 6674 8049
E [email protected]
DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. Consultant: SHAUN LOCKYER Revision
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater site retention.PDFRelated documentApplication case desk ↗
About this file
- File size
- 122 KB (small file)
- File type
No other editions are linked here.