From: Michael Capper [[email protected]]
Sent: Monday, 14 October 2013 9:36:19 AM
To: Stephen Scotchmer (Balmain)
CC: Alana Curran; Michelle Castro; Mark Lewis; Dionne Coluccio
Subject: RE: Performance of Conditions Bond - BAGS003287
Stephen,
 
Council officers have reviewed the submitted WQ reports (L002374, L002376 and LC002378) and can confirm that the Conditions surrounding Bond BAGS003287 have been met. I will prepare the paper work at my end to facilitate the release of this bond. Let me know if you require more information.
 
Regards,
 
MICHAEL CAPPER | ENVIRONMENT PROGRAM OFFICER 
Hydraulics and Water Quality Unit | Engineering and Environment Assessment Branch
Sunshine Coast Regional Council
(07) 5475 9904 | M 0407 693 591 | (MC11)
[email protected]
Locked Bag 72, Sunshine Coast Mail Centre Q 4560
www.sunshinecoast.qld.gov.au
 
From: Stephen Scotchmer (Balmain) [mailto:[email protected]]
Sent: Tuesday, 24 September 2013 11:57 AM
To: Michael Capper
Cc: Alana Curran; Michelle Castro; Leon Rowlands; Mark Lewis
Subject: Re: Performance of Conditions Bond - BAGS003287
 
Michael
 
We have completed our reviews and discovered that all water quality monitoring has been done - however the reports were never sent to Council.
 
There are 3 files with the reports from 2010 to present. Each are 7Mb files so I will send you an email after this one with a link to download those reports. 
 
I believe that shall satisfy the bond conditions and allow its return. Can you confirm.
 
Thank you again for your assistance.
Kind Regards
Stephen Scotchmer
Balmain Asset Management
 
Email: [email protected]
 
 
 
 
 
On 29/08/2013, at 1:04 PM, Michael Capper <[email protected]> wrote:
Stephen/Alana,
 
Thank you for your enquiry regarding the Bond associated with BAGS003287. It has taken some time but I have successfully uncovered the history behind the bond and outline the details for your information below.
 
On 16 June 2001, Council’s Cherie O’Sullivan sent a Mr Bob Borger email correspondence outlining two options to satisfy outstanding Water Quality compliance issues at the development, email in blue below.
 
It appears Mr Borger selected option 2 and Council subsequently reduced the bond money held to $100,000.00. To date, Council records indicate that no water quality monitoring reports or correspondence demonstrating compliance (or other) with Condition 212 have been received.
 
To facilitate the release of BAGS003287, Council officer will need to receive documentation in accordance with either option 1 or 2. Can you please advise if this documentation is available?
 
 
Regards,
 
MICHAEL CAPPER | ENVIRONMENT PROGRAM OFFICER  
Hydraulics and Water Quality Unit | Engineering and Environment Assessment Branch 
Sunshine Coast Regional Council
(07) 5475 9904 | M 0407 693 591 | (MC11) 
[email protected] 
Locked Bag 72, Sunshine Coast Mail Centre Q 4560 
www.sunshinecoast.qld.gov.au
 
 
From:                    Cherie O'Sullivan [[email protected]]
Sent:                      Thursday, 16 June 2011 18:19
To:                         'Bob Borger'
Cc:                         Tony Doughty
Subject:                 Viridian Water Quality Compliance
 
Hi Bob,
 
As discussed, there are two options for finalising compliance for the water quality at Viridian :
 
Option 1
 
A. Provide MUSIC modelling showing the existing situation (i.e. with GPT's and rainwater tanks but no swales or bioretention basins) to demonstrate that the development has appropriate mitigation required to achieve pollutant reduction targets required by Condition 212  (i.e. 60% and 45% reduction in Total Phosphorous and Total Nitrogen compared to the unmitigated development respectively; plus
 
B. Provide $60,000 (2 separate $30,000) incomplete works bonds from the landowner to cover the remaining 2 years of water quality monitoring.
 
With Option 1, $30,000 will be returned upon the provision of each annual water quality monitoring report.
 
Option 2
Provide $100,000 of incomplete works bonds from the landowner  to cover the remaining 2 years of water quality monitoring plus demonstration of compliance with Condition 212 (as outlined in previous correspondence). These bonds will only be returned once it is demonstrated that the development does not impact on water quality, as predicted in the  Hydrology and Stormwater Management Plan by WBM. This is required to be demonstrated via the provision the two annual monitoring reports which need to demonstrate that by the final three monitoring rounds,  the quality of waters downstream, or released from, the development does not significantly alter from the quality of upstream waters.
 
In the meantime, I understand that you would like to have $900,000 of the current bond returned while you work out which of the above 2 options to proceed with. Please confirm this intent via return email so I can recommend for the $900,000 amount of bond to be released.
 
Kind Regards
 
Cherie O'Sullivan
Environment Officer
Sunshine Coast Regional Council I Central Office
Phone 07 54759928 I Fax 07 5447 1062
Locked Bag 72, Sunshine Coast Mail Centre QLD  4560
[email protected]
www.sunshinecoast.qld.gov.au
 
 __ __
To find out more about the Sunshine Coast Council, visit your local office at Caloundra, Maroochydore, Nambour or Tewantin or visit us online atwww.sunshinecoast.qld.gov.au. If correspondence includes personal information, please refer to Council's Privacy Policy
This email and any attachments are confidential and only for the use of the addressee. If you have received this email in error you are requested to notify the sender by return email or contact council on 07 5475 7272, and are prohibited from forwarding, printing, copying or using it in anyway, in whole or part. Please note that some council staff utilise mobile devices, which may result in information being transmitted overseas prior to delivery of any communication to the device. In sending an email to Council you are agreeing that the content of your email may be transmitted overseas.
Any views expressed in this email are the author's, except where the email makes it clear otherwise. The unauthorised publication of an email and any attachments generated for the official functions of council is strictly prohibited. Please note that council is subject to the Right to Information Act 2009 (Qld) and Information Privacy Act 2009 (Qld).
 
 
This email and any files transmitted with it are intended for the named recipient only. The information contained in this message may be confidential, legally privileged or commercially sensitive. If you are not the intended recipient you must not reproduce or distribute any part of the email, disclose its contents to any other party, or take any action in reliance on it. If you have received this email in error, please contact the sender immediately by return email and delete this message from your computer.
This email and any attachments are confidential. If you are not the intended recipient, you should not use or disclose the information in any way. If you have received this email in error, please contact the sender and delete the email and any attachments. The views or opinions expressed are the author's own and may not reflect the views or opinions of the Balmain Group.

Used in these records

About this file

File size
26 KB (small file)
File type
HTML

No other editions are linked here.

Original file

Log in to download the original file

Approval of Bond Release - BAGS003287.html · 26 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.