Town Planning Report
Application for an Other Change

21 Wesley Court, Noosa Heads 4567 QLD

Lot 42 on N21843



TEMPO FAMIGLIA PTY LTD
Log in to download the original file

Change to Jetty OPW18-0150 - Planning Report.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 20 pages

Page 2

Table of Contents

Important Note                                                                      1

1.   Development Intent                                                            2

2.   Background                                                                    3
     2.1 Site Location                                                             3
     2.2 Surrounding Development                                                   5

3.   Proposed Change                                                               8
     3.1 Floating Boat Fenders                                                     8
     3.2 Jet ski Dry Storage Pontoon                                               9
     3.3 Kayak Step                                                                9

4.   Proposed Change to Conditions                                                 10
     4.1 Condition 1                                                               10
     4.2 Proposed Change to Condition 1                                            10
     4.3 Condition 6                                                               10
     4.4 Proposed Change to Condition 6                                            11

5.   Planning Assessment                                                           12
     5.1 State Assessment Referral Agency                                          12
     5.2 Noosa Council Considerations                                              12

6.   Conclusions                                                                   18




List of Figures
Figure 1: Configuration of Approved Jetty                                          3
Figure 2: Site Location                                                            4
Figure 3: Path to Noosa River and Lake Weyba                                       4
Figure 4: 14-18 Wesley Court and 17-21 Mossman Court, Noosa Heads                  5
Figure 5: 52 Mossman Court, Noosa Heads                                            6
Figure 6: 33 Mossman Court, Noosa Heads                                            6
Figure 7: 17 Wesley Court and 61 Witta Circle, Noosa Heads                         7
Figure 8: 43-53 Witta Circle, Noosa Heads                                          7
Figure 9: Proposed Revised Jetty Plan                                              8
Figure 9: Maritime Safety and Development Overlay                                  12




RG Strategic                     Town Planning Report – Other Change Application    a

Page 3

Important Note

Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under
the Copyright Act, no part of this report, its attachments or appendices may be reproduced by any
process without the written consent of RG Strategic. All enquiries should be directed to RG Strategic.

We have prepared this report for the sole purposes of TEMPO FAMIGLIA PTY LTD (“Client”) for the specific
purpose of demonstrating the proposed use as being permitted under the Noosa Plan 2006 (“Purpose”).
This report is strictly limited to the purpose and the facts and matters stated in it and does not apply
directly or indirectly and will not be used for any other application, purpose, use or matter.

In preparing this report we have made certain assumptions. We have assumed that all information and
documents provided to us by the Client or as a result of a specific request or enquiry were complete,
accurate and up to date. Where we have obtained information from a government register or database,
we have assumed that the information is accurate. Where an assumption has been made, we have not
made any independent investigations with respect to the matters the subject of that assumption. We are
not aware of any reason why any of the assumptions are incorrect.

This report is presented without the assumption of a duty of care to any other person (other than the Client)
(“Third Party”). The report may not contain sufficient information for the purposes of a Third Party or for
other uses. Without the prior written consent of RG Strategic;

           •   this report may not be relied on by a Third Party; and

           •   RG Strategic will not be liable to a Third Party for any loss, damage, liability or claim arising
               out of or incidental to a Third Party; and

           •   publishing, using or relying on the facts, content, opinions or subject matter contained in this
               report

If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report with
or without the consent of RG Strategic, RG Strategic disclaims all risk and the Third Party assumes all risk
and releases and indemnifies and agrees to keep indemnified RG Strategic from any loss, damage, claim
or liability arising directly or indirectly from the use of or reliance on this report.

In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits,
damage to property, injury to any person (including death) costs and expenses incurred in taking measures
to prevent, mitigate or rectify any harm, loss of opportunity, legal costs, compensation, interest and any
other direct, indirect, consequential or financial or other loss.




RG Strategic                        Town Planning Report – Other Change Application                     1

Page 4

1.   Development Intent

Darren and Lara Crothers as directors of Tempo Famiglia Pty Ltd (the applicant) are seeking a minor
change to their existing jetty located at 21 Wesley Court, Noosa Heads 4567 QLD (subject site). The
application constitutes an Other Change (as determined by advice from State Assessment Referral
Agency – SARA) and is in response to Noosa Council’s Advisory Letter received 30th March 2020.

This Other Change application encompasses the following elements:

          • Addition of two floating boat fenders,

          • Addition of a jet ski dry storage pontoon and

          • Relocation of kayak access steps to the jetty.

The above elements are all attached to the existing approved jetty and are currently fitted to the jetty.
No further works to the canal/sea floor are required.

It is intended that the jetty will be ordinarily utilised to:

     •   Moor two (2) jet skis, and

     •   Moor one (1) vessel.

This report should be read in conjunction with the accompanying covering letter, DA Forms and
attachments including:

          • Appendix A – Existing Approved Plans, and

          • Appendix B- Proposed Plans prepared by Long View Consulting Engineers.




RG Strategic                        Town Planning Report – Other Change Application              2

Page 5

2.    Background

On 30th July 2018 Noosa Council issued a Decision Notice approving a jetty at the subject site. The matter
was referred to SARA, and conditions of the approval imposed as part of the Decision Notice OPW18/0150.
Figure 1 below is an extract from the existing approved plans of the configuration of the jetty.

The jetty as approved is to be 12 meters long by 8 meters wide and located adjacent to the existing private
boat ramp. A kayak access step to the internal side of the jetty was approved as part of the jetty.




Figure 1: Configuration of Approved Jetty
Source: Approved Plans OPW18/0150



2.1   Site Location

The subject site is located at 21 Wesley Court, Noosa Heads 4567 QLD and is apart of the Noosa Sound
canal estate (Figure 2). As illustrated in the below aerial photograph, the site is located at the entrance of
a canal cul-de-sac. Vessels and watercraft navigating pass the jetty would ordinarily be those that are
moored/stored at the residences located within the cul-de-sac. Vessels and watercraft exploring the
Noosa River and estuaries would typically take alternative routes and not utilise the canal which is
bordered by private residences.




RG Strategic                      Town Planning Report – Other Change Application                     3

Page 6

                                                    Subject Site




Figure 2: Site Location
Source: NearMaps
The proposed change to the jetty does not impact upon vessels and craft travelling within the Noosa River.
Watercraft travelling to and from Lake Weyba and surrounds generally utilise the primary path and
entrance located adjacent to Noosa River Campground (Path 1), as represented in Figure 3 below. A
secondary path to access the upper estuaries of Lake Weyba is via Noosa Sound/Hasting Street entrance
(Path 2).




                   Primary path (1)                          Secondary path (2)               Alternative path (3)

Figure 3: Path to Noosa River and Lake Weyba
Source: NearMaps
An alternative and less direct route for vessels is via the canals (Path 3). Vessels and craft utilising this path
are travelling at very low speed as to minimise wash and disturbance to the waterfront properties. Whilst
the speed is limited to 6 knots within the canal, there are at times instances where a considerable wash is


RG Strategic                          Town Planning Report – Other Change Application                     4

Page 7

generated, particularly from heavier vessels. The proposed floating boat fenders assist in minimising the
impact of the wash against the moored vessel to the jetty by allowing the vessel to heave, pitch and roll
with the wash.

As demonstrated in Figure 3 above, the modification to the approved jetty does not interfere with the
vessels or watercraft operating within the Noosa River and its estuaries.



2.2 Surrounding Development

A number of private jetties of various configurations exist within close proximity to the subject site as
demonstrated in Figures 4-8. These jetties identified are of a similar, if not larger, configuration than the
proposed change to the existing jetty at the subject site. The following aerial photographs demonstrate
that the proposed change to the existing approved jetty is in consistent with the amenity and character
of the development within the canal estate.




Figure 4: 14-18 Wesley Court and 17-21 Mossman Court, Noosa Heads
Source: NearMaps




RG Strategic                     Town Planning Report – Other Change Application                     5

Page 8

As evidenced in Figures 5, 6, 7 and 8, a number of the private jetties in the surrounding canal estate have
been designed to accommodate numerous vessels and watercraft.




Figure 5: 52 Mossman Court, Noosa Heads
Source: NearMaps




Figure 6: 33 Mossman Court, Noosa Heads
Source: NearMaps




RG Strategic                    Town Planning Report – Other Change Application                    6

Page 9

Figure 7: 17 Wesley Court and 61 Witta Circle, Noosa Heads
Source: NearMaps




Figure 8: 43-53 Witta Circle, Noosa Heads
Source: NearMaps




RG Strategic                     Town Planning Report – Other Change Application   7

Page 10

3. Proposed Change

The proposed redesign of the jetty will allow the storage of two jet skis and two vessels, and consists of
the following minor improvements to the approved existing jetty:

          • Addition of two floating boat fenders,

          • Addition of jet ski dry storage pontoon and

          • Relocation of the kayak access steps to the jetty.

These minor additions are illustrated in extract of the Proposed Plans below.




Figure 9: Proposed Revised Jetty Plan
Source: Long View Consulting Engineers (Appendix B)



3.1   Floating Boat Fenders

Two boat fenders are proposed along the southern and western face of the existing jetty. Both fenders
are five (5) meters long and 0.65 meters wide. The boat fenders have been installed to moor vessels safely
and securely to the jetty. The fenders are attached to the existing fixed piers (jetty) and float up and down
with the tide.

Without the floating boat fenders, vessels moored to the jetty would have to be done in a way which
enables them to float with the tide. This requires longer mooring rope which permits the boats to drift
further from the private jetty and potentially into the canal’s navigation corridor.

Through the installation of a floating boat fender, vessels can be tied securely using shorter ropes and thus
eliminating the risk of the vessels encroaching into the navigation corridor. With or without the fenders, no
more than two large vessels can be moored at any one time. The fenders protect the vessel from the jetty


RG Strategic                      Town Planning Report – Other Change Application                    8

Page 11

and improve access to and from a moored vessel.

The proposed change to the existing approved jetty is negligible in the sense that the floating fender
which adjoins the southern face of the jetty is 650mm wide. With an approved length of 12 meters, the
addition of 650mm represents an increase of 5.4% increase. The design of the fenders allows for sufficient
area to accommodate the mooring of a vessel against the fender whilst still maintaining safe and clear
access to the navigator corridor of the canal.

3.2 Jet ski Dry Storage Pontoon

A jet ski dry storage pontoon is proposed to the inside of the jetty. The pontoon is 3.5 metres square and
accommodates two jet skis. The location of the jet ski pontoon permits the safe storage of watercraft as
to not encroach upon the canal’s navigation corridor.

3.3 Kayak Step

A kayak step is proposed to the western side of the jetty, forward of the boat fender. Steps to the eastern
side (internal) of the jetty were included in the approved plans. These have been relocated to the external
side to assist in accessing the water from the jetty. The proposed relocated steps are the same width as
the floating boat fender and therefore do not intrude upon the canal or the operation of adjoining
properties.




RG Strategic                    Town Planning Report – Other Change Application                    9

Page 12

4.    Proposed Change to Conditions

It is proposed that the following changes to the conditions contained within the Development Approval
OPW18/0150 are made to enable the modification of the existing private jetty as proposed in the enclosed
proposed plans (Appendix B). The Conditions which are affected by the proposed jetty redesign are
Conditions 1 and 6.

4.1 Condition 1

Condition 1 within the Decision Notice reads as:

1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are listed in the following table unless
         otherwise amended by these conditions.


                   Plan Title                Revision        Dated                    Prepared by

                                                                            Jetty Plan and Details prepared by
       28136-J1                              B            23 July 2018
                                                                            SCG Consulting Engineers
                                                                            Jetty Plan and Details prepared by
       28136-J2                                           April 2018
                                                                            SCG Consulting Engineers



4.2 Proposed Change to Condition 1

Change Condition 1 to read:

1.   Development undertaken in accordance with this approval must generally comply with the approved
     plans of development. The approved plans are listed in the following table unless otherwise amended
     by these conditions.

                   Plan Title                Revision        Dated                    Prepared by

       Drawing Schedule & Transmittal        C2           12/6/2020         Long View Consulting Engineering
       Structural Notes Sheet                C2           12/6/2020         Long View Consulting Engineering
       Site Plan, Framing Plan, Elevations   C2           12/6/2020         Long View Consulting Engineering
       Jetty Framing Details                 C2           12/6/2020         Long View Consulting Engineering



4.3 Condition 6

Condition 6 within the Decision Notice reads as:

6.        No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
          elevating a vessel above the water without Council approval.




RG Strategic                     Town Planning Report – Other Change Application                      10

Page 13

4.4 Proposed Change to Condition 6

It is proposed that Condition 6 be deleted. Condition 1 specifies that the jetty must be built in accordance
with the approved (revised) plans, including the proposed jet ski dry storage pontoon. As such, any
additional structures fitted to the jetty would not comply with the approval. Therefore, the requirement of
Condition 6 is not necessary.

It must be noted that the proposed floating boat fenders are not boat lifting devices. The fenders do not
change the height of the vessel on the water, nor do they enable additional water craft of vessels to be
moored at the same time.




RG Strategic                     Town Planning Report – Other Change Application                    11

Page 14

5. Planning Assessment

5.1 State Assessment Referral Agency

Informal advice from a SARA officer has confirmed that this Other Change application is required to be
referred to SARA in relation to tidal works or works in a coastal management district overlay. They jetty is
assessable under Schedule 10, Part 17 – Table 2 Assessable development under s28 in tidal waters of the
Planning Regulation 2017.

Whilst the subject site is affected by the Navigation Corridor overlay as illustrated in Figure 9, the change
to the existing jetty still permits safe mooring of a vessel to the jetty whilst remaining clear of the overlay.
Importantly, if a vessel was to protrude into the corridor, the protrusion would:

          • A) be negligible in that the protrusion would be less than a metre,

          • B) not affect vessels of watercraft utilising the canal as an alternative access to the Noosa
               River (refer to Figure 3). The only vessels figuratively impacted upon are those that are moored
               or stored in the cul-de-sac, and

          • C) Council and SARA have approved jetties with moored vessel which encroach the
               navigation corridor as indicated in Figure 9 of 33 Mossman Court, Noosa Heads (also refer to
               Figure 5).




Figure 10: Maritime Safety and Development Overlay
Source: Development Assessment Mapping System (DAMS)


5.2 Noosa Council Considerations

The subject site is zoned as Detached Housing within the Noosa Heads Locality as prescribed within the
Noosa Plan 2006. In accordance with the Noosa Heads Locality Code, the proposal is to be assessed


RG Strategic                       Town Planning Report – Other Change Application                     12

Page 15

against the assessment benchmarks within the Noosa Heads Locality Code and Table 14.64 of the
Watercourses Works Code.

The Noosa Plan 2006 is a performance-based planning scheme. Development Use and Overlay Codes
contain both Specific Outcomes and Probable Solutions. Specific Outcomes are considered to be
overarching guidelines for development.

A Probable Solution for a Specific Outcome provides a guide for achieving that outcome in whole or in
part. They are not exhaustive and alternative solutions that achieve the outcomes and purpose of the
applicable codes may be proposed by applicants.

A development complies with a Specific Outcomes if:

          • the Probable Solution to the Specific Outcome is complied with; or

          • sufficient information is provided to demonstrate the criterion has been met in another way.

The following assessment addresses the requirements of the application codes against the proposed jetty
redesign. Where an alternative outcome has been proposed by the Applicant, sufficient information will
be provided.




Noosa Heads Locality Code
A review of the Noosa Heads Locality Code has identified no Specific Outcomes relevant to the proposed
jetty redesign. Therefore, assessment against the Code’s benchmarks is not warranted.




Watercourses Works Code
An assessment of the proposed jetty against the assessment benchmarks contained within the
Watercourses Work Code has been undertaken. The development is relevant only to the Specific
Outcomes and Probable Solutions contained within Table 14-64 Prescribed Tidal Works (waters outside
Noosa Waters canal).


Table 14-64 Prescribed Tidal Works

          Specific Outcomes                       Probable Solutions                Applicant’s Response

  14.163 Siting
   O1 The construction of new           No solution provided.                      Complies
   jetties, wharves and boardwalks                                                 The proposal is a minor
   on freehold land in largely                                                     alteration to the existing
   undeveloped sections of a                                                       approved jetty.
   watercourse is avoided.
   O2 The construction of new           No solution provided.                      Not applicable
   jetties and wharves on public                                                   The proposal is on private
   lands is avoided unless there is a                                              land.
   clear demonstrated public
   benefit and public support.


RG Strategic                     Town Planning Report – Other Change Application                       13

Page 16

   O3 Prescribed tidal works are      No solution provided.                        Not applicable
   not located on the southern                                                     The proposal is located in
   bank of the Noosa River and                                                     the Noosa Sound estate
   tributaries between the Noosa                                                   and is a minor
   Heads Lions Park and Weyba                                                      modification of an
   Bridge (Refer Figure 14-28).                                                    existing approved jetty.
   O4 Prescribed tidal work does      No solution provided.                        Not applicable
   not include extensions of on-site                                               The jetty modification
   recreational areas unless there is                                              does not include an
   a clear demonstrated public                                                     extension of on-site
   benefit and public support.                                                     recreation area.
  14.164 Character and Amenity
                                         S5.1 For lots with frontages greater      Complies
                                         than 15m or greater in width, jetties     The modification of the
                                         and pontoons are setback a minimum        existing approved jetty
   O5 Prescribed tidal works are
                                         of 3m from the prolongation of the        will result in a minor
   designed and sited to ensure—
                                         boundaries, except as allowed for in      increase of the width
   a) they are contained within the
                                         S5.2 and S5.3; (Refer Figure 14-29);      (650mm) and depth
   prolongation of boundaries of
                                         OR                                        (650mm). The
   the lot; b) that when a vessel is
                                                                                   modification still remains
   berthed it does not encroach
                                                                                   within the setbacks
   over the prolongation of
                                                                                   prescribed.
   boundaries of the lot; c) a high
   level of visual amenity is
                                         S5.2 For lots less than 15m in width     Not applicable
   maintained when viewed from
                                         (including lots located in canal bends
   the watercourse and adjoining
                                         or on lots located in the head of the
   lands;
                                         canal)— a) a joint application is made
   d) they avoid conflicts with uses
                                         with the adjoining owner; or b) where
   in the water and on the
                                         a joint application is not possible,
   foreshore and adjoining lands;
                                         jetties and pontoons— i) are setback
   e) cluttering of watercourses is
                                         a minimum of 1m from the
   avoided;
                                         prolongation of the boundaries; ii) are
   f) excessive traffic volumes within
                                         not more than 1.2m in width; and iii)
   foreshore areas and adjoining
                                         have no head and are located such
   lands are avoided;
                                         that when a vessel is berthed, it does
   g) materials blend with the
                                         not encroach over the prolongation of
   natural surrounds; and
                                         a boundary (Refer Figure 14-30);
   h) they reflect the character and
                                         AND
   setting of the immediate
                                         S5.3 For lots that adjoin those          Not applicable
   surrounds or the locality.
                                         described in S5.2, a jetty or pontoon is
                                         located well away from the common
                                         boundary.
   O6 Jetties and wharves are not        S6.1 No solution provided.               Complies
   roofed.                                                                        No roof is proposed.
                                         S7.1 No solution provided                Complies
                                                                                  No boat lifting devices
   O7 Boat lifting devices (including                                             are proposed. A jet ski
   boat storage devices) are only                                                 dry storage pontoon is
   located on Noosa North Shore                                                   proposed. This pontoon
                                                                                  will not be used and is
                                                                                  not designed to lift boats.




RG Strategic                     Town Planning Report – Other Change Application                       14

Page 17

   O8 Large jetties, pontoons and       S8.1 No solution provided                   Not applicable
   wharves that are capable of                                                      The proposal relates to a
   serving other uses, such as for                                                  minor modification to a
   private recreational purposes,                                                   private jetty.
   are not permitted.
  14.165 Design, Construction and Safety – Jetties, Wharves and Pontoons
                                        S9.1 The maximum width of a jetty,          Complies
                                        jetty head or associated walkway is         No alteration to the
                                        1.5m, except for at Noosa North             existing approved jetty
                                        Shore;                                      structure is proposed. The
                                        AND                                         walkway wide will remain
                                                                                    as existing.

                                        S9.2 For jetties on the Noosa North         Not applicable
                                        Shore, the maximum width of the jetty
                                        head is 2m; AND
                                        S9.3 The maximum length of a jetty
                                        head is not more than 7m;
                                        AND
                                        S9.4 A pontoon head has a maximum           Complies
                                        width of 3m and a maximum length of         No alteration to the
                                        5m; (Refer Figure 14-31)                    existing approved jetty
                                                                                    structure is proposed.
   O9 Prescribed tidal works are
                                                                                    Two small floating jetty
   designed and constructed for
                                                                                    fenders are proposed
   the sole purpose of providing
                                                                                    and attached to the
   access to vessels and are sited
                                                                                    existing jetty. These
   and designed to avoid—
                                                                                    fenders are to enable the
   a) cluttering of watercourses;
                                                                                    safe and secure mooring
   b) excessive traffic volumes
                                                                                    and access to a
   within foreshore areas and
                                                                                    vessel/watercraft.
   adjoining lands; c) conflicts with
   uses on the foreshore and
                                        S9.5 For “Y” and “T” shaped jetty           Complies
   adjoining lands; and
                                        heads— a) a maximum area 10.5m2             The area of the existing
   d) unacceptable risks to
                                        excluding any walkway is provided;          jetty will not be altered as
   personal and public safety
                                        and b) a walkway with a minimum             a result of the proposed
                                        length of 3m is provided (Refer Figure      floating fenders and dry
                                        14-32);                                     storage pontoon.

                                        S9.6 Gangways and walkways serving Complies
                                        jetties and pontoons have at least     No alteration to the rail is
                                        one rigid handrail fitted and meet the proposed.
                                        following—
                                        a) For detached houses – a minimum
                                        width of 750mm and a maximum
                                        width of 1.5m;
                                        b) For other residential uses –
                                        i. the gangway for single berth
                                        pontoons has a minimum width of
                                        900mm;
                                        ii. the gangway for multiple berth
                                        pontoons has a minimum width of



RG Strategic                      Town Planning Report – Other Change Application                       15

Page 18

                                       1.2m if fitted with one handrail and
                                       900mm if fitted with a handrail on
                                       each side;
                                       iii. the primary walkway to multiple
                                       berth pontoons has a maximum width
                                       of 1.5m; and
                                       iv. The maximum width of the
                                       gangway is 1.5m;
                                       AND
                                       S9.7 In Noosa Sound, where quay lines      Complies
                                       are set, a jetty or pontoon does not       The proposed
                                       extend into the watercourses beyond        modification includes
                                       the quay line;                             attaching two floating
                                       OR                                         fenders to the existing
                                       S9.8 Where no quay lines are set, the      approved jetty. The width
                                       maximum distance a jetty or pontoon        of both fenders are
                                       extends into the watercourse is 10m,       650mm and represent a
                                       unless it can be demonstrated that a       minor addition to the
                                       distance in excess of 10m is essential     fixed jetty.
                                       to safely access the jetty;
                                       AND
                                       S9.9 All attachments to jetties,           Complies
                                       including but not limited to boat lifts,   The proposed fenders,
                                       jet ski dradles, floating berths and       dry storage pontoon and
                                       floating pontoons must be located          steps are attached to the
                                       within the quay line; AND                  existing approved jetty.

                                       S9.10 Pontoons must be structurally        Complies
                                       capable of sitting on the sand bed.        The pontoon has been
                                       Rollers and bracing must account for       suitably designed.
                                       this situation; AND
                                       S9.11 Jetties and pontoons must be         Not applicable
                                       free standing and not rely on              The proposal does not
                                       connecting to any Council revetment        change the structure of
                                       wall or other structure.                   the approved jetty.
  14.166 Design, Construction and Safety – Boat Ramps
                                       S10.1 Where there is an existing           Not applicable
   O10 Boat ramps are designed
                                       revetment wall—                            A boat ramp is not
   and constructed to—
                                       a) the levels of a boat ramp surface       proposed.
   a) allow access by a wheeled
                                       at the revetment wall is no more than
   boat trailer;
                                       150mm above the top of the wall, not
   b) ensure that unacceptable
                                       more than 500mm below the top of
   risks to personal and public
                                       the wall and not more than 200mm
   safety are unlikely to be caused;
                                       above the existing beach; and
   c) avoid cluttering of the
                                       b) The ramp extends into the
   watercourse;
                                       watercourse no more than 9m from a
   d) avoid excessive traffic
                                       revetment wall; AND
   volumes within foreshore areas
                                       S10.2 The ramp is constructed at a
   and adjoining lands; and
                                       uniform grade and no steeper than 1
   e) ensure that visual amenity of
                                       in 5 (20%);
   the foreshore is maintained.
                                       AND




RG Strategic                    Town Planning Report – Other Change Application                        16

Page 19

                     S10.3 The outer end of the ramp is no
                     more than 100mm above the level of
                     the beach;
                     AND
                     S10.4 No part of the ramp is to extend
                     closer than 1m to the prolongation of
                     the boundaries. (Refer Figure 14-33)
                     AND
                     S10.5 The boat ramp surface profile
                     shall be concave to allow
                     concentration of water to the centre
                     of the ramp.




RG Strategic   Town Planning Report – Other Change Application   17

Page 20

6.   Conclusions

The proposed redesign of the existing approved jetty at 21 Wesley Court, Noosa Heads 4567 QLD
represents a minor change to the existing approved jetty. The proposed Other Change is consistent with
the intent of the original approval (OPW18/0150). The changes to the jetty represent minor alterations to
the existing structure and provide for safe and secure vessel mooring.

The proposed floating boat fenders assist in minimising the impact of the wash against the moored vessel
to the jetty by allowing the vessel to heave, pitch and roll with the wash.

The additions of the floating boat fenders add an additional 650mm to the length and width of the existing
jetty. These additions are negligible and do not interfere with the navigation corridor or restrict/impeded
the movements of other vessel and watercraft.

The proposed is Approval of the Other Change is recommended.




RG Strategic                     Town Planning Report – Other Change Application                   18

Page 21

a

G

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.