Minor Change Existing Approval - RAL21 0012 01 (As Published) · RAL21/0012.01

of 6

Text shows just the words. Original shows the document exactly as it was published.

               8.     Additional line marking and signage must be installed within the road formation across the
                      frontage of the site and in the areas adjacent to the proposed access driveways. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular line marking and signage:
                      8.1. to indicate to drivers and pedestrians that the area is shared pedestrian area,
                      8.2. that is sufficient to ensure a safe outcome for path users, and
                      8.3. be in accordance with AGRD06A-17, Guide to Road Design Part6A Paths for Walking
                           and Cycling AGRD Part 6A
                      This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Property Access and Driveways
               9.     A residential driveway must be constructed to Lots 1, 2 and 3. The driveways must be
                      constructed prior to the sealing of the survey plan and undertaken in accordance with an
                      Operational Works approval. The driveway must:
                      9.1. be located generally in accordance with the approved plans, and
                      9.2. be generally in accordance with Council’s Standard Drawings
               10.    Vehicle access to Lots 1, 2 and 3 is limited to the constructed driveway only. A clause must
                      be included in the contract of sale for Lots 1, 2 and 3 which requires vehicle access to be
                      from the constructed driveway only, and which prohibits the driveway from being relocated
                      without Council agreement.
                      The following property note or similar will be added to Council’s rates records for the lots to
                      advice Private Certifiers, owners and prospective purchasers of the access requirements:
                      “To ensure the safety and efficiency of the road network vehicle access to this lot must be
                      from the constructed driveway only unless otherwise approved by Council (refer to Council
                      Approval RAL21/0012).”
                      Stormwater Drainage
               11.    Stormwater runoff from the development must be discharged to Council kerb and channel in
                      Hilton Terrace or disposed of on-site without causing scour or damage to the subject site or
                      any adjoining property. The works must be undertaken in accordance with an Operational
                      Works approval.
                      Services
               12.    Reticulated electricity and telecommunication services must be provided to each lot in
                      accordance with an approval for Operational Works and the standards and requirements of
                      the relevant service provider.
               13.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               14.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               15.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               16.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.


                                                                                                        Page 3 of 6
Document Set ID: 24874148
Version: 4, Version Date: 18/06/2026

Used in these records

About this file

File size
153 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - RAL21 0012 01 (As Published).pdf · 153 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.