Minor Change Existing Approval - RAL21 0012 01 (As Published) · RAL21/0012.01
8. Additional line marking and signage must be installed within the road formation across the
frontage of the site and in the areas adjacent to the proposed access driveways. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular line marking and signage:
8.1. to indicate to drivers and pedestrians that the area is shared pedestrian area,
8.2. that is sufficient to ensure a safe outcome for path users, and
8.3. be in accordance with AGRD06A-17, Guide to Road Design Part6A Paths for Walking
and Cycling AGRD Part 6A
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Property Access and Driveways
9. A residential driveway must be constructed to Lots 1, 2 and 3. The driveways must be
constructed prior to the sealing of the survey plan and undertaken in accordance with an
Operational Works approval. The driveway must:
9.1. be located generally in accordance with the approved plans, and
9.2. be generally in accordance with Council’s Standard Drawings
10. Vehicle access to Lots 1, 2 and 3 is limited to the constructed driveway only. A clause must
be included in the contract of sale for Lots 1, 2 and 3 which requires vehicle access to be
from the constructed driveway only, and which prohibits the driveway from being relocated
without Council agreement.
The following property note or similar will be added to Council’s rates records for the lots to
advice Private Certifiers, owners and prospective purchasers of the access requirements:
“To ensure the safety and efficiency of the road network vehicle access to this lot must be
from the constructed driveway only unless otherwise approved by Council (refer to Council
Approval RAL21/0012).”
Stormwater Drainage
11. Stormwater runoff from the development must be discharged to Council kerb and channel in
Hilton Terrace or disposed of on-site without causing scour or damage to the subject site or
any adjoining property. The works must be undertaken in accordance with an Operational
Works approval.
Services
12. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with an approval for Operational Works and the standards and requirements of
the relevant service provider.
13. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
14. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
15. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
16. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
Page 3 of 6
Document Set ID: 24874148
Version: 4, Version Date: 18/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - RAL21 0012 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 153 KB (small file)
- File type
No other editions are linked here.