Referral Agency Response - Planning RAP21 0025

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Officer: 	Wilhelm Koschade
Direct Telephone: 	07 53296540
Our Reference:	RAP21/0025
Your Reference:	20219589
02 December 2021
Pure Building Approvals
PO Box 1632
BUDERIM  QLD  4556

[email protected]
Dear Sir
Referral Agency Response
Planning Act 2016
I refer to your application and advise that Council, as a concurrence agency for the application, completed its assessment of the application on 23 November 2021. You are advised that Council requires conditions to be attached to any development approval. The conditions are listed below.
application details
Application No:	RAP21/0025
Street address:	2 Kestrel Cres Peregian Beach Qld 4573
Real property description:	Lot 38 P 93125
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
type of development
The applicant seeks the following type of referral agency response:
Concurrence Agency Response for Dwelling House
concurrence agency conditions
PLANNING
When Conditions must be complied with
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.

Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
3/12	B	Site Plan, prepared by Reitsma	08/09/2021
9/12	B	Ground Floor, prepared by Reitsma	08/09/2021
10/12	B	First Floor, prepared by Reitsma	08/09/2021
12/12	B	Elevation 1, prepared by Reitsma	08/09/2021
13/12	B	Elevation 2, prepared by Reitsma	08/09/2021
14/12	B	Elevation 3, prepared by Reitsma	08/09/2021
15/12	B	Elevation 4, prepared by Reitsma	08/09/2021
Building Height
The maximum height of the development must not exceed 8.0 metres above the finished ground level and the natural ground surface.
Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice.
Currency Period
This development approval lapses if the use has not happened by 23 November 2023, unless an application to extend the currency period is approved by Council.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping
A minimum of 20% of the site must be retained as soft landscaping.
ENGINEERING
Site Access and Driveways
A sealed access driveway must be provided from Lorilet Street to all parking areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular:
a driveway crossover generally in accordance with Council’s Standard Drawings RS-049 and RS-050 together with any associated addendum
the kerbing section of the new driveway must be on the same alignment as the existing kerb in Lorilet Street frontage of the subject site
transitions to the existing formation and driveway to the south of the site
shaping of the verge areas to direct runoff from the road formation to the existing kerb and channel
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge.  The works must be undertaken generally in accordance with the Stormwater Management Plan, Reference No:S21-041 prepared by Westera Partners dated 21 October 2021
Earthworks and Retaining Walls
All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level.
All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
reasons for inclusion of conditions
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the referral agency conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
Development Compliance Inspection
Prior to the commencement of the use, please contact Council's Development Assessment Branch to arrange a Development Compliance Inspection.
Infrastructure Charges
All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue.
ENGINEERING
Building and Construction Industry (Portable Long Service Leave) Levy
The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid.
Co-ordination of Operational Works Assessment
Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following:
Construction traffic management
appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD)
Provision for safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased.
rEPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE
The applicant may make representations to Council about this referral agency response at any time before the application is decided pursuant to section 30 of the Development Assessment Rules.

Yours faithfully,

Wilhelm Koschade
Development Planner

Enc:	Approved Plans

[word/footer2.xml]
Page 4 of 4

[word/footer3.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 4

[word/header1.xml]
3
Log in to download the original file

Referral Agency Response - Planning RAP21 0025.docx · 75 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.