Attachment 3 -C_ Planning Scheme Assessment
Appendix C
Assessment Against the Planning Scheme – Flood Hazard Overlay Code
Performance Outcomes Acceptable Outcomes Compliance
Avoidance and management of ASS
PO1 AO1
Development provides that for all The finished flood level is not less than the Complies – the FFL of the habitable floor on ground
flood events up to and including minimum design levels specified in Table 8.2.6.4 floor is at 2.7m AHD which provides a 0.3m. above
the DFE : the DFE
(a) the safety of people on the
site is protected; and
(b) the risk of damage to property
on the site is avoided or
minimised as far as
practicable.
PO2 AO2
All lots have sufficient area that is The minimum area above flood level (flood free Not applicable – the development application does
above the DFE flood level or area) for each lot, is in accordance with Table not propose to reconfigure a lot.
where modelling is not available, 8.2.6.5.
the highest recorded flood level,
to safely and
adequately accommodate the
intended use.
PO3 AO3
For reconfiguring a lot or Development areas are not filled to reduce flood Not applicable – the development application does
operational works, development is risk. not propose to reconfigure a lot.
undertaken in a manner that
ensures:
(a) natural hydrological
systems are protected from
erosion, scour or flood
damage on the premises or
other premises;
(b) natural landforms and
drainage lines are
maintained to protect the
hydraulic performance of
waterways and flood plain;
and
(c) development integrates with
the natural landform rather
than modifying the landform
to suit the development as
far as practicable.
PO4 AO4.1
For reconfiguring a lot, Development provides an effective evacuation Not applicable – the development application does
development does not route that remains passable, with sufficient flood not propose to reconfigure a lot.
compromise the safety of people warning time, to enable people to progressively
resulting from the flood risk evacuate to safe areas above the PMF in the
associated with events exceeding face of advancing flood or waters for events that
the DFE. exceed the DFE.
OR
AO4.2
Development provides for an area of sufficient
size and dimensions on site above the PMF that
allows for safe congregation and refuge.
AO4.3
Where the existing roads servicing a
development provide a specific flood immunity
(as determined by the Qld Transport Road and
Drainage Design Manual, Queensland Urban
Drainage Manual and the Australian Rainfall and
Runoff Guide), all lots have access to the flood
free area identified in Table 8.2.6.5 that matches
the road immunity.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.