Original source · versioned page text
Attachment 3 -C_ Planning Scheme Assessment
Appendix C
Assessment Against the Planning Scheme – Flood Hazard Overlay Code
AO7.2 known well in advance.
Development does not:
a) increase the number of people calculated to Complies – the site is not subject to flash local
be at risk from flooding; flooding to an extent that there is insufficient warning
b) increase the number of people likely to need for such a residential use noting all habitable floor
evacuation; levels are above the peak of the DFE. The
c) shorten flood warning times for other uses contribution that tidal influences may have are
in the floodplain; or known well in advance.
d) impact on the ability of traffic to use
evacuation routes, or unreasonably
increase traffic volumes on evacuation
routes.
AO7.3
Materials stored on site:
a) are readily able to be moved in a flood Complies – the proposed use comprises two
event to a flood free area; or dwellings and it is not expected that hazardous
b) are contained in order to minimise materials will be stored within the site at levels below
movement in times of flood. or above the peak of the DFE
Editor's Note— Businesses should ensure that
necessary emergency and continuity plans are in
place to account for the potential need to
evacuate personnel and to relocate property
prior to a flood event.
Essential network infrastructure
PO8 AO8
Essential network infrastructure Essential network infrastructure that is likely to Complies – the proposal shouuld not result in
maintains effective function during fail to function or may result in contamination additional essential network infrastructure having to
and immediately after flood and when inundated by flood water (e.g. water be installed to service the proposed development
storm tide inundation events. supply pipeline air valves and the like) is located noting that the existing use of the site is for a shop
above the DFE level (or where the DFE has not and associated caretaker’s accommodation
been modelled for the area, above the highest
recorded flood level for the area).
Essential community infrastructure
PO9 AO9.1
Essential community Essential community infrastructure is sited and Complies – the proposal should not result in
infrastructure is able to function constructed to ensure that flood levels comply additional essential community infrastructure having
effectively during and immediately with flood immunity requirements specified in to be installed to service the proposed development
after flood events. Table 8.2.6.4. noting that the existing use of the site is for a shop
and associated caretaker’s accommodation
AO9.2
Essential community infrastructure which is
located below the specified flood immunity
requirements:
1. is designed and constructed to
function effectively during and
immediately after the recommended
flood level event; and
2. has direct access to low hazard
evacuation routes or an emergency
rescue area above the PMF, if it is for
emergency services (including
emergency shelters, police facilities,
hospitals and associated facilities).
Earthworks
PO10 AO10
Excavation and filling for Filling, other than accessways: Can comply – the only filling and excavation will be
operational works only occur associated with the resulting building works.
where they: a) does not extend more than the equivalent of
(a) result in the protection, 3 metres around the main building,
rehabilitation and repair of measured from the outer walls of the
ecologically important building;
areas, watercourses, b) is limited to a maximum of 500m2; and
drainage lines and c) does not impact on the local drainage of
wetlands; adjoining properties.
(b) do not adversely impact on
the overall hydrology,
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.