Original source · versioned page text
Attachment 3 -C_ Planning Scheme Assessment
Appendix C
Assessment Against the Planning Scheme - Tewantin Local Plan Code
amenity, including ensuring
low ambient noise levels;
d) does not increase the overall
scale and intensity of
commercial operations;
e) ensures no net increase in
the gross floor
area of building and
structures;
f) uses materials, natural
finishes and colours that
blend with the surrounding
natural landscape; and
g) reflects the character and
setting of the waterfront
locality (such as timber and tin
construction with a traditional
pitched roof design)
PO19
Commercial development on and No acceptable outcome provided Not applicable
adjacent to Noosa River is not
increased or expanded beyond
existing building footprints and
structures within existing lease
areas.
PO20
The loading and unloading of No acceptable outcome provided Not applicable
passengers and boat docking is
confined to the commercial lease
areas of the respective
commercial operation.
PO21 PO21
Parking of vehicles and boat The loading and unloading of passengers, goods Not applicable
trailers and the loading and and water craft is confined to the commercial
unloading of goods or passengers lease areas of the respective commercial
does not impede on public open operation provided.
space in the vicinity of the river.
PO22
Noosa Marina at Parkyn Court: No acceptable outcome provided Not applicable
a) provides for the continued
operation of the marina
moorings, marine based
businesses and river
transport services
and ancillary business uses
and food and drink outlets;
b) does not provide residential
uses, indoor sport and
recreation, nightclub
entertainment facility; and
c) provides required car
parking on site.
Access & Connectivity Table 7.2.3.3 Criteria for assessable development (part)
Column 1 Column 2 Column 3
Performance Outcomes Acceptable Outcomes Compliance
Access & Connectivity
PO23 AO23.1
Development integrates with and Development on land including or adjoining a Not applicable
extends the existing street and key pedestrian/cycle link shown in Figure 7.2.3.4
pathway networks including but (Tewantin Framework and Character
not limited to those identified plan) facilitates these connections.
on Figure 7.2.3.4 (Tewantin
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.