ORDINARY MEETING AGENDA                                                     21 SEPTEMBER 2017


          e.   the Tree Protection Plan is to outline the specific tree procedures (i.e.
               dimensional data, species and methods for protection and minimization of
               detrimental effects) to be compliant with AS 4970-2009. The document should
               contain the methodology for pile installation, grouting and capping processes.
    6.    The proposed deck and terrace area is to be constructed of light weight building
          elements including a timber decking system, 1m high balustrading with stainless steel
          wire infill, supported on a suspended steel structure, with the retaining walls being
          stone cladded, in accordance with the approved plans of development.
    7.    The 1m setback area and the area beneath the deck, shall be densely landscaped to
          screen the deck from view off site. The development is to be landscaped generally in
          accordance with Drawing No. MB_12PR_40 – Landscape Plan Lower Ground Level
          and Drawing No. MB_12PR_41 – Lower Ground Level Planting Plan. The applicant is
          required to obtain a development permit for operation works (landscaping) prior to the
          removal of any vegetation from the site area affected by the development.
    8.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
          must be submitted to Council, to secure performance of all conditions of this approval,
          prior to the issue of a development permit for operational work (landscaping). The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of this
          permit. Council reserves the right to call upon the bond or guaranteed sum to effect
          compliance with conditions.
    9.    The works must comply with the terms of Easements A & B on RP 177551 located
          within the subject land and 9A Allambi Rise, Noosa Heads.
    10.   All construction access is to be obtained from Allambi Rise via the existing easement
          subject to the following exceptions:
          a.   a crane may be used for delivering prefabricated materials and the pier digging
               machine to the site. The use of the crane in Park Road is to occur on two (2)
               separate days only, first for the delivery of the pier digging machine and any
               prefabricated materials, the second to retrieve the pier digging machine and
               provide any further prefabricated materials as required;
          b.   traffic control is to be provided for the use of the crane in Park Road, in
               accordance with the Appellant’s Traffic Management Plan, prepared by Evolution
               Traffic Control, Drawing No. 142510, Revision 00, dated 16 March 2017;
          c.   access from Park Road to the site is permitted for the purpose of a concrete
               pumping pipe to be located at the base of the rock retaining wall on the boundary
               of 10 Park Road, laid upon a composted wood chip mulch 600mm wide and
               150mm thick. Any mulch contaminated by concrete or wastes shall be removed
               from the site. Any remaining clean mulch may be left in situ and spread to 50mm
               thickness; and
          d.   the Appellant is able to use the driveway at 10 Park Road for the removal of
               waste material from the site. All waste from the site is to be loaded into the vehicle
               parked in the driveway from within 10 Park Road and not by using the road
               reserve.
    11.   The works must be carried out in accordance with an approved Construction
          Management Plan for the development. The Construction Management Plan dated 14th
          August 2017 is to be amended to address the conditions of approval to the reasonable
          satisfaction of the Council. The Appellant shall submit an amended Construction
          Management Plan for approval with the development application for operational works
          (landscaping).



                                                                                     Page 13 of 22
Log in to download the original file

2017-09-21 Ordinary Meeting Agenda(PDF, 577KB).pdf · 591 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.