Planning Report

of 13

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                         103 Wrigley St (Cnr Sugar Road)
                                                                                                         P O Box 5774
                                                                                                         Maroochydore BC Q 4558
                                                                                                         Phone: 617 5479 5311
                                                                                                         Fax: 617 5479 1289
                                                                                                         Email: [email protected]
                                                                                                         Part of CadCon International Pty Ltd
                                                                                                         ACN 098 201 828




              6.1.7    Landscaping Code

              No performance outcome from this code requires satisfaction by alternative means. The development
              is for a reconfiguration of a lot only and does not involve landscaping works as part of this stage of the
              development.

              6.1.8    Sustainable Building Design Code

              No performance outcome from this code requires satisfaction by alternative means. Compliance with
              applicable requirements of this code can be conditioned in a development approval.

              6.1.9    Transport Code

              Table 9.4.7.3 Criteria for assessable development
               Performance Outcomes             Acceptable Outcomes                           Comment
               PO14                             AO14                                          Performance Solution
               Development is provided with Where not already existing, the                   It is submitted that kerb and
               external works—                  following             infrastructure          channel is not warranted and
               (a) along the full extent of the components are provided at the                would not in fact improve the
                   frontage of the site to an frontage of the site—                           existing                  drainage
                   appropriate         standard (a) full width sealed road;                   circumstances         for      this
                   having regard to the (b) concrete kerb and channel                         subdivision i.e.
                   specified function of the         where appropriate;                       • The lots immediately north
                   road; and                    (c) forming and grading to                         of the subject lot do not
               (b) provided beyond the site’s        footpaths;                                    have kerb and channel;
                   frontage if required         (d) vehicular kerb and footpath               • There is a functional table
                                                     crossings;                                    drain           arrangement
                                                (e) a constructed bikeway;                         operating over part of the
                                                (f) a constructed footpath;                        lot frontage;
                                                (g) a constructed carriageway;                • Construction of kerb and
                                                (h) required       alterations    to               channel and subsequent
                                                     public utility mains, services                concentration               of
                                                     or installations;                             stormwater would require
                                                (i) construction of any required                   discharge construction over
                                                     alterations to public utility                 the steep back and into the
                                                     mains,         services      or               heavily vegetated subject
                                                     installations;                                lot; and
                                                (j) stormwater drainage works;                • The development proposes
                                                     and                                           using the same access
                                                (k) installation of electrical                     point for access to the new
                                                     conduits.                                     lots enabling the existing
                                                                                                   table drain arrangements to
                                                                                                   be utilised albeit with some
                                                                                                   minor alterations at the
                                                                                                   access point itself.

              6.1.10 Water Quality and Drainage Code

              Stormwater management has been addressed as part of Appendix E – Engineering Report & Plans and
              will be further addressed in detail as part of a future operational works application.

CadCon provides boundary, contour & detail and construction surveys, town planning applications, liaison & negotiation with Councils & Government,
coordination and liaison with architects, engineers etc, coordination and management of development projects from start to finish.




              Ref 218806 – Brett Hage                                                                                 Page 11 of 13
Log in to download the original file

Planning Report.pdf · 856 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.