6.1.7 Landscaping Code
No performance outcome from this code requires satisfaction by alternative means. The development
is for a reconfiguration of a lot only and does not involve landscaping works as part of this stage of the
development.
6.1.8 Sustainable Building Design Code
No performance outcome from this code requires satisfaction by alternative means. Compliance with
applicable requirements of this code can be conditioned in a development approval.
6.1.9 Transport Code
Table 9.4.7.3 Criteria for assessable development
Performance Outcomes Acceptable Outcomes Comment
PO14 AO14 Performance Solution
Development is provided with Where not already existing, the It is submitted that kerb and
external works— following infrastructure channel is not warranted and
(a) along the full extent of the components are provided at the would not in fact improve the
frontage of the site to an frontage of the site— existing drainage
appropriate standard (a) full width sealed road; circumstances for this
having regard to the (b) concrete kerb and channel subdivision i.e.
specified function of the where appropriate; • The lots immediately north
road; and (c) forming and grading to of the subject lot do not
(b) provided beyond the site’s footpaths; have kerb and channel;
frontage if required (d) vehicular kerb and footpath • There is a functional table
crossings; drain arrangement
(e) a constructed bikeway; operating over part of the
(f) a constructed footpath; lot frontage;
(g) a constructed carriageway; • Construction of kerb and
(h) required alterations to channel and subsequent
public utility mains, services concentration of
or installations; stormwater would require
(i) construction of any required discharge construction over
alterations to public utility the steep back and into the
mains, services or heavily vegetated subject
installations; lot; and
(j) stormwater drainage works; • The development proposes
and using the same access
(k) installation of electrical point for access to the new
conduits. lots enabling the existing
table drain arrangements to
be utilised albeit with some
minor alterations at the
access point itself.
6.1.10 Water Quality and Drainage Code
Stormwater management has been addressed as part of Appendix E – Engineering Report & Plans and
will be further addressed in detail as part of a future operational works application.
CadCon provides boundary, contour & detail and construction surveys, town planning applications, liaison & negotiation with Councils & Government,
coordination and liaison with architects, engineers etc, coordination and management of development projects from start to finish.
Ref 218806 – Brett Hage Page 11 of 13