Concurrence Agency Response 222 Gympie Terrace Noosaville · OPW11/0301
DERM Permit number: SPCC03617211
CONDITIONS
General
1. All works are to be constructed in accordance with the approved drawings and the specifications as detailed
on these drawings.
2. If acid sulphate soils are found to be present through testing of areas subject to excavation in accordance
with the requirements of State Planning Policy 2/02, then the works must be managed to prevent acid
sulphate soil development as outlined in the current version of the Queensland Acid Sulphate Soils
Technical Manual Soil Management Guidelines.
3. The disturbance to the bed and banks of the waterway is to be kept to a minimum.
4. If as a result of any works, any bank is displaced the permit holder shall restore the bank to its original
condition and take such other action as is necessary to ensure the stability of the bank to the satisfaction of
the chief executive.
Construction
5. All construction works on the jetty are to occur during times which would minimise sediment and
contaminant dispersal.
6. All excavated material shall be transported to an appropriate location outside of the Coastal Management
District.
7. Any material or any debris that falls or is deposited outside of the alignment of the works shown on the
approved plans must be removed within 48 hours following placement of the material.
8. All temporary works associated with the construction of the works are to be removed from the site at the
completion of the works.
9. All wastes shall be collected and disposed of at an appropriate lawful facility.
Water Quality
10. Construction of the works are to be carried out only by means of suitable plant and equipment and
measures are to be taken to limit turbidity in tidal waters as a result of the construction.
11. All reasonable and practicable measures must be taken to prevent pollution of the waterway as a result of
silt run-off, oil and grease spills from machinery, concrete truck washout and alike. Wastewater from
cleaning equipment must not be discharged directly or in-directly to any watercourses.
12. If there are any signs of sediment loss, a filter fence or other erosion device to contain sediment
contaminated water and prevent contamination of tidal waters, is to be installed and maintained until
completion of the works.
Stormwater
13. Stormwater drainage systems are to be constructed to include quality improvement devices (sediment
removal, gross pollutant traps) to ensure that stormwater can be effectively managed and discharged
without causing adverse impact on the wetlands adjoining the subject land.
Demolition
14. All demolition materials that are to be removed shall be transported to an appropriate location outside of the
Coastal Management District or other approved location.
Page 3 of 7 ' 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence Agency Response 222 Gympie Terrace NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.