Original source · versioned page text
Appendix H - Code Assessment
Attached to the e-mail Applicant advises of Referral - RAL19/0008.
destinations including— S21.4 Linkages to the Noosa Trail Network
a) the town of Cooroy; are designed and constructed in accordance
b) Lake Macdonald; with—
c) the Botanic Gardens; and a) Australian Standard 2156.1 Walking
d) State forests, conservation parks and other Tracks Part 1: Classification and Signage
recreation facilities in the locality. to a minimum of a Class 4 Standard; and
b) Australian Standard 2156.2 Walking
Tracks Part 2: Infrastructure Design;
S22.1 No solution provided
Pedestrian and bicycle pathways S23.1 Pedestrian and bicycle pathways are Not applicable.
O23 Safe and convenient pedestrian and bicycle provided and retained where indicated in
pathways are provided and retained between and Schedule 5 – Map 2; As there is no new road being established as part of this
around key destinations, including— AND development, the provisions of this element are not
a) between Cooroy and Tewantin; S23.2 Contributions toward a Pathways applicable.
b) between Cooroy and the Noosa Botanical Gardens; Network are provided in accordance with
and PSP20.
c) within and around the town of Cooroy.
Protection of Lake Macdonald water supply S24.1 Within the Lake Macdonald catchment Not applicable.
O24 Development does not adversely impact on the area shown on Natural Resources Overlay
Lake Macdonald water supply. Map OM3.5, buildings and other structures are The proposed development is not located within the Lake
AND not located below 98.5m AHD. Macdonald catchment area as shown on Natural Resources
O25 The number and location of access points to No solution provided. Overlay Map OM3.5.
watercourses is controlled and managed to prevent S25.1 No solution provided
adverse impacts on water quality in Lake Macdonald; S26.1 No solution provided
AND S27.1 No solution provided
O26 Key nodes are established and Advisory note
appropriately managed at the following locations and PSP24 – Effluent Disposal details
include facilities such as parking and picnic requirements for the design and siting of
areas— effluent disposal systems where located
a) the northern part of the lake, in the vicinity of the outside a sewerage service area. Compliance with
water treatment plant, scouts and fish hatchery; PSP24 will be considered as part of Council’s
b) the western part of the lake in conjunction with the assessment of the plumbing and drainage application.
Botanic Gardens and associated picnic areas; and
c) the eastern part of the lake, in the vicinity of the Old
Tinbeerwah School Park.
AND
O27 Treatment and disposal of waste water does not
have any detrimental impact on Noosa’s
major water storage and supply – Lake Macdonald.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.