Water Quality Objectives

The State Planning Policy for 2014 states the following water quality objectives are to be
achieved for applicable developments in Queensland.

Table B: Post construction phase—stormwater management design objectives

Application

(a) Applies to western Queensland and Cape York/ Far North Queensland, for population centres greater than 25,000 persons, and
(b) For all other climatic regions with population centres greater than 3000 persons.

 

Climatic Design objectives
eal] UT imeem LLL Ue TET Cer Ce Cd
east) unmitigated development (%) Application
itr)
Mapp
System)
South East 8 = Development for urban purposes within population
Queensland ” 45 9° centres greater than 3000 persons.
Central
Queensland 85 60 45 9a As above.
(south)
Central As above.
Queensland 75 60 40* ga * Mackay Regional Council has adopted a 35%
(north) reduction for TN.
As above.
Dry Tropics 80 60 * 40 90 * Townsville City Council has adopted a 65%
reduction for TP.
Wet Tropics 80 60 40 90 As above.
Development for urban purposes within
Cape York/ENQ | 80 bo ae oe population centres greater than 25,000 persons.
Western
Queensland 85 60 45 90 As above.
Excludes development that is less than 25%
impervious.

N/A N/A N/A N/A In lieu of modelling, the default bio-retention
treatment area to comply with load reduction
targets for all Queensland regions is 1.5% of
the contributing catchment area.

> All ¢ i L i

Catchments contributing to un-lined receiving
Waterway stability management waterway. Local government may not require

* Limit the peak 2-year ARI event discharge within Compliance if the waterway is degraded.

the receiving waterway to the pre-development For peak flow for the 1-year ARI event, use
peak 1-year ARI event discharge. co-located storages to attenuate site discharge
rate of stormwater.

Figure 4 - SPP 2014 Water Quality Objectives

Specifically for South East Queensland (SEQ), the water quality objectives are (from the table
above):

¢ 80% reduction in Total Suspended Solids (TSS)
© 60% reduction in Total Phosphorous (TP)

e 45% reduction in Total Nitrogen (TN)

e 90% reduction in Gross Pollutants (GP)

Page | 7

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Jellyfish Compliance with SEQ MUSIC Modelling Guidelines.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.