Notes to the Financial Statements
for the year ended 30 June 2022
Note 15. Property, Plant and Equipment (continued)
Index applied
Last (change in index Other interim
Valuation comprehensive Key assumptions and estimates recognised this revaluation
Asset Class and Fair Value Hierarchy approach valuation date Valuer engaged (related data sources) year) adjustment
Bridges (Level 3) Current 31/03/2018 AssetVal Pty Ltd Unit rates are developed according to ABS Producer Nil
2022: $80.2m replacement cost varying material types used for Price Index: 3101
2021: $72.0m construction, as well as deck area, size Road and bridge
and length. construction,
Construction estimates were based on Queensland
actual contract prices for recently Most Recent
completed projects or supply quotes for Index Applied:
similar assets. 10.1% equivalent
Significant bridges were separately to 2 years (2022)
assessed by the valuer.
Storm water (Level 3) Current 30/06/2020 Jones Lang LaSalle Unit rates determined using market costs ABS Producer Nil
2022: $158.3m replacement cost for supply and installation of similar Price Index: 3101
2021: $143.7m assets or their modern equivalent taking Road and bridge
into consideration variables such as construction,
asset size, depth, location and soil type. Queensland
The first principles approach to deriving Most Recent
unit rates also consists of breaking down Index Applied:
each asset into its construction elements 10.1% equivalent
including demolition, reinstatement, to 2 years (2022)
excavation, construction, delivery and
installation. Stormwater assets are
componentised into the significant
components which may provide different
function, economic benefit life. i.e.
pipework, valves, culverts, manholes,
headwalls, bio-retention basins.
Investment Property (Level 2) Market value 30/06/2022 AEC Group Two calculation methodologies underpin Not Applicable Nil
2022: $3.3 million the market based valuation approach: Valuations
2021: $2.9 million - Capitalisation rate valuation approach completed
- Discounted cashflow valuation annually
approach
Page 31 of 62
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.