Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2022-11-14 GC Agenda - Item 5 - Attachment 1 - Annual Report 2021-22

of 157

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Noosa Shire Council



     • The
       	   shade sail for the Sunshine Beach skate park was erected and the new vert ramp is in the
       final stages of construction and delivery.
     •	The Kin Kin Recreation Hall has been successfully refurbished and handed back to the
        community for their use.
     •	The Rufous Street Community Centre has been completed and the planning for the delivery
        of the upgrades to the old community centre as an extension of the Digital Hub is well
        underway.
     • Infrastructure
       	             Services have delivery in excess of $35 million worth of capital projects – the
       most ever in a 12 month cycle.
     • The
       	  civil operations team continued to support the public by delivering numerous road reseals
       and upgrades as well as the re-sheeting of Council’s large lengths of unsealed roads during
       the unprecedented wet season.
     • Council
       	      has been rebuilding a number of hinterland bridges over the period and has completed
       stage 1 of 3 for the reconstruction works of Noosa Parade (due for overall completion in
       October 2022). The Noosa Parade upgrade will deliver on the intent of the walking and cycling
       strategy by providing pedestrian and bike lanes into Noosa Heads.
     • 	Council was struck by the devastating flood events in February and March of 2022 and have
       managed the initial disaster management response ensuring no loss of life for our community.
     •	The ongoing repair of infrastructure (potentially $40-50 million worth of reconstruction) and the
        rebuilding of the social fabric that Noosa is renowned for will continue to be a long process.
     •	The Transport Strategy continues to be developed and various initiatives activated such as the
        12 month trail for free weekend buses to compliment the free “Go Noosa” holiday program
     •	Works on Trail 5 have continued to further enhance Noosa’s reputation for providing superior
        natural assets.
     • 	The development of the Asset Management Plans across all categories has continued to be
       delivered and will support the ongoing financial prosperity of the Council and community.
     •	The 2032 Brisbane Olympic Games were awarded to Queensland and the many opportunities
        and benefits are yet to be explored and realised over the coming years.




46

Noosa Shire Council

          ¢  The shade sail for the Sunshine Beach skate park was erected and the new vert ramp is in the
             final stages of construction and delivery.
          ¢  The Kin Kin Recreation Hall has been successfully refurbished and handed back to the
             community for their use.
          ¢  The Rufous Street Community Centre has been completed and the planning for the delivery
             of the upgrades to the old community centre as an extension of the Digital Hub is well
             underway.
          ¢  Infrastructure Services have delivery in excess of $35 million worth of capital projects — the
             most ever in a 12 month cycle.
          ¢  The civil operations team continued to support the public by delivering numerous road reseals
             and upgrades as well as the re-sheeting of Council’s large lengths of unsealed roads during
             the unprecedented wet season.
          ¢  Council has been rebuilding a number of hinterland bridges over the period and has completed
             stage 1 of 3 for the reconstruction works of Noosa Parade (due for overall completion in
             October 2022). The Noosa Parade upgrade will deliver on the intent of the walking and cycling
             strategy by providing pedestrian and bike lanes into Noosa Heads.
          *  Council was struck by the devastating flood events in February and March of 2022 and have
             managed the initial disaster management response ensuring no loss of life for our community.
          *  The ongoing repair of infrastructure (potentially $40-50 million worth of reconstruction) and the
             rebuilding of the social fabric that Noosa is renowned for will continue to be a long process.
          ¢  The Transport Strategy continues to be developed and various initiatives activated such as the
             12 month trail for free weekend buses to compliment the free “Go Noosa” holiday program
          ¢  Works on Trail 5 have continued to further enhance Noosa’s reputation for providing superior
             natural assets.
          ¢« The development of the Asset Management Plans across all categories has continued to be
             delivered and will support the ongoing financial prosperity of the Council and community.
          ¢  The 2032 Brisbane Olympic Games were awarded to Queensland and the many opportunities
             and benefits are yet to be explored and realised over the coming years.

Be Ve i *\ stl TERA  pee Rete Loa 1.9 i:         DS     RG           1?
 pea                          ae NES       ¥ Jere                   'Y
OSPR   Pin fel J ier Retin ORR, Nr A Poe aN ah |  -                      oe         ‘      2  pen SS
PRE     iy greene Es Sate 9 FP    ry   tans SS         .               Me :       Fa    Oe? Zhe
 rN om     < Seee |     ie    WS           eee    eh      tse                 ee  A        ee         ee ak
         a                                ~              |    ea)           ——            Ree BD Pe aie           Jee
      »         =               TO        A            ll                 Amada      (ie)       0/ 18
        ,       Do      et         of Ve                 v                 | CAT    Y:      i            ae
               ay  iN           —t        Uh      =                       eo               AR   tater oe
         eG                oh      ae              yO              Ps      =                Mote Se     eee?
   f € oP  -  tio”         7% \ a os    =| ye    eS    ee   =       _  Ss P Se             Eo   Eee a Bete fe
  '     .     ny”      AN         ,   re y. bh     rs      ~ i>            Ee        ss   il bee = =o 2
    “    x    a            Ve  ' =    | §     _    ye                =        ae Sb    a    y; ~ AS h.) toe z Peak
 a             ee               ae V7            u            Pia              Bo              Slag
     ae    Se       4 BS        ——— A    ed     €      :      po}  |     Wha      NS  ee     a      iis,
   te  ay S           el      § Ee 4    oz     wey = ee      sy    iS y                  3 = Ne Toms) = oe
:    = Ne '         eal    \ im  _—    i       ail   ¥         ;      {  S     4               a    R  —   aes :
               ’                                 me                .                        ie

          }        eee |              @      See                     of
    46  Y       ee                    Nee                           Qe               re                eS
                :       — ee eee ee                                  ee eS
   A                        a eae I                                                        ER
Log in to download the original file

2022-11-14 GC Agenda - Item 5 - Attachment 1 - Annual Report 2021-22(PDF, 14MB).pdf · 15.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.