2020-10-15 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 OCTOBER 2020
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
1598-DA02 05 Project Summary, prepared by Blackburne Jackson 11-06-20
1598-DA03 07 Floor Plan, - Basement, prepared by Blackburne 11-06-20
Jackson
1598-DA04 08 Floor Plan – Ground/Level, prepared by Blackburne 16-06-20
Jackson
1598-DA05 05 Roof Plan, prepared by Blackburne Jackson 11-06-20
1598-DA06 05 Elevations 1, prepared by Blackburne Jackson 11-06-20
1598-DA07 05 Elevations 2, prepared by Blackburne Jackson 11-06-20
1598-DA08 05 Sections, prepared by Blackburne Jackson 11-06-20
1598-DA09 05 Finishes Palatte, prepared by Blackburne Jackson 11-06-20
1598-DA12 02 Tenancy Plan, prepared by Blackburne Jackson 11-06-20
1598-DA100 02 Landscape Cover Page, prepared by Blackburne 19-03-20
Jackson
1598-DA101 02 Landscape Plan - Basement, prepared by Blackburne 19-03-20
Jackson
1598-DA102 02 Landscape Plan - Ground, prepared by Blackburne 19-03-20
Jackson
C001 C Concept Stormwater Management Plan, prepared by 19/03/2020
Empire Engineering
Job No: SC-
8407
Job No: SC- B Site Based Stormwater Management Plan, prepared by 24/03/2020
8407 Empire Engineering
Amended Plans
3. Amended plans must be submitted to Council prior to the issue of a Development Permit for
Operational Works and must include an amended design consistent with design
requirements within the Cooroy and Lake Macdonald Locality Code and the Heritage Overlay
Code. The amended design must address the following:
a. A roof pitch of no less than 12 degrees and 600mm eaves to at least 75% of the
perimeter of the building;
b. Replacement of skillion roof with roof forms consistent with Figure 13.1 within the
Heritage Overlay Code;
c. Replacement of aluminium windows with timber framed windows;
d. Removal of horizontal battening to window screens;
Page 20 of 27