ORDINARY MEETING AGENDA 15 OCTOBER 2020
ENVIRONMENTAL HEALTH
Waste Management
38. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”. The facilities must include an external impervious area correctly sized
for all refuse and recycling containers and suitably screened from public places and
neighbouring properties. A bin wash area is required with a cold-water tap, hose and drain
outlet connected to sewer, via a bucket trap. The drain outlet must be designed to prevent
storm water entry to the sewerage system. This can be achieved with a nib wall 50mm high
and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed,
or any other design approved by Council.
39. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
Acoustic
40. The development must comply with noise limits and noise control measures detailed within
the Environmental Noise Level Impact Assessment for Proposed Medical Centre, 45 Maple
Street Cooroy, prepared by David Moore and Associates Pty Ltd (Report No:
2018/D3464/Rev.0 dated 9 March 2020).
41. A Noise Management Plan, which must include a complaint management process and
periodic noise monitoring, must be provided to Council prior to the commencement of the
use.
42. Certification must be submitted to Council, which certifies that operational noise from any
fixed plant and equipment complies with the requirements of this Decision Notice.
RECONFIGURING A LOT
When Conditions Must Be Complied With
43. Unless otherwise stated, all works required by the conditions of this Decision Notice must be
completed prior to submission of the subdivision plan to Council.
Approved Plans
44. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
19399.01A A Proposed Subdivision Of Lots 1 & 2 On RP99323 & Lots 15 & 22-06-20
18 on C5605, prepared by Project Urban
45. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Easements
46. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property and in accordance with the requirement of the public service
provider.
47. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
Page 25 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.