               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                  Coordinator Engineering, Mark Lewis
                                       Development Assessment



                  APPLICATION DETAILS

                  Application No.                  MCU22/0017 & OPW22/0038

                  Applicant                        Kate Amanda Hay

                  Proposal                         Material Change of Use - Landing – Residential and
                                                   Operational Works - Jetty

                  Properly Made Date               15 February 2022

                  Information Request Date         Not Applicable

                  Information Response Date        Not Applicable

                  Decision Due Date                12 April 2022

                  Report Completed Date            1 March 2022

                  Report Reviewed By               Diogo Carrico


                  PROPERTY DETAILS

                  Property Address                 19 The Peninsula Noosaville Qld 4566

                  RP Description                   Lot 267 RP 856191

                  Land Area                         730.0000 m²

                  Existing Use of Land             Residential


                  STATUTORY DETAILS

                  SEQRP Designation                Urban Footprint

                  Zone                             Low Density Residential

                  Precinct                         Not Applicable

                  Local Plan Area                  Not Applicable

                  Overlays                         Acid sulfate, flooding

                  Assessment Type                  Code




Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022
Full text of the other 7 pages

Page 2

               1.     PROPOSAL
               The application seeks approval for a Material Change of Use - Landing – Residential and
               Operational Works - Jetty
               The locality and proposal plan are included below.




                                                       Figure 1 – Locality




                                                                                           Page 2 of 8

Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022

Page 3

                                                          Figure 2 – Site Plan


               2.     SITE DETAILS
               2.1. Background
               The application is for a jetty within the canal frontage of the subject site. There are no other existing
               structures within the frontage.
               3.     ASSESSMENT
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
                     State Planning Policy;
                     South East Queensland Regional Plan;
                     Planning Regulation 2017; and
                     Noosa Plan 2020.
               3.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
                                                                                                           Page 3 of 8

Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022

Page 4

                      Low Density Residential Zone Code;
                      Noosaville Local Plan Code;
                      Waterways Works Code
               The application has been found to generally comply with all applicable statutory instruments.
               It is noted that the level of the jetty deck indicated on the design plans is 1.2m AHD. Council
               requires the jetty deck to be level with the top the revetment wall which is approximately 1.0m AHD
               in Noosa Waters. Relevant conditions have been included and the approved plans have been
               annotated accordingly.
               4.      CONSULTATION
               4.1. Referral Agencies
               Not Applicable
               4.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
                      Planning
               5.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No MCU22/0017 OPW22/0038 for a Material Change of Use - Landing
               – Residential and Operational Works - Jetty situated at 19 The Peninsula Noosaville Qld 4566 and
               described as Lot 267 RP 856191, it is recommended the application be approved in accordance
               with the following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:              MCU22/0017 & OPW22/038

                   Street address:              19 The Peninsula Noosaville Qld 4566

                   Real property description:   Lot 267 RP 856191

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
                      Development Permit for Material Change of Use - Landing – Residential and
                      Development Permit for Operational Works - Jetty
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




                                                                                                      Page 4 of 8

Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022

Page 5

               4.     ASSESSMENT MANAGER CONDITIONS

                      Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.           Rev.    Plan/Document Name                      Date

                         7882-S001          C1      Cover Sheet, Drawing Schedule and 12 November 2021
                                                    Locality Plan prepared by Black &
                                                    More

                         7882-S002          C1      General Notes – Sheet 1 of 2 12 November 2021
                                                    prepared by Black & More

                         7882-S003          C1      General Notes – Sheet 2 of 2 12 November 2021
                                                    prepared by Black & More

                         7882-S004          C1      Site Plan, Framing Plan and Jetty 12 November 2021
                                                    Elevations prepared by Black & More
                                                    As annotated by Council

                         7882-S005          C1      Typical Jetty Details Sheet 1 of 3 12 November 2021
                                                    prepared by Black & More

                         7882-S006          C1      Typical Jetty Details Sheet 2 of 3 12 November 2021
                                                    prepared by Black & More

                         7882-S007          C1      Typical Jetty Details Sheet 3 of 3 12 November 2021
                                                    prepared by Black & More

                      Currency Period
               2.     The Currency Period for this development approval lapses if all conditions have not been
                      complied with by 1 March 2024, unless an application to extend the currency period is
                      approved by Council.
                      General Conditions
               3.     The maximum number of vessels that may be berthed, moored, attached or stored on the
                      structure(s) must not exceed 2.
               4.     The use of the jetty must not cause any adverse effects on the amenity of the surrounding
                      areas including changes to light, views, air quality and noise.
               5.     Vessels berthed/moored at the jetty must be located a minimum of 1.0m from the
                      prolongation of the property boundaries.
               6.     Vessels and boatlifting devices must be connected directly to the jetty, and not located side
                      by side or in tandem with another vessel.
               7.     All structures must be designed and constructed such that they are free standing within the
                      waterway and are not connected to or behind the revetment wall
               8.     All structures must have no detrimental effects on stormwater drains and/or easements.
               9.     Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
                      revetment wall.
               10.    A rigid handrail must be fitted on one side of the walkway.

                                                                                                      Page 5 of 8

Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022

Page 6

               11.    No posts or vertical supports of the proposed jetty are to extend vertically from the structure
                      unless they provide necessary support for the handrail.
               12.    No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
                      elevating a vessel above the water without Council approval.
               13.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               14.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               15.    Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
                      5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
                      a.      Located clear of this rock protection where applicable, or alternatively
                      b.      Where the scour protection extends beyond 750mm:
                              i.       Prior to driving piles, the rocks are to be removed to expose the geotextile and
                                       the geotextile cut neatly to allow it to be turned back. During pile driving, care is
                                       to be taken to ensure the geotextile is not damaged. At the completion of pile
                                       driving, the fabric is to be turned down around the pile and the rocks replaced
                                       around the piles
               16.    The jetty is to be used for private purposes only with no commercial operations to be
                      undertaken.
               17.    Boat repair activities are not permitted on site.
               18.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               19.    The mooring facility must not be utilised for live-aboard purposes.
               20.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               21.    Certification by a Registered Professional Engineer of Queensland that states that the jetty
                      is constructed in accordance with best practice methods and is structurally sound must be
                      submitted to Council. This certification must be submitted to Council within three (3) months
                      of the completion of the works. A final inspection and approval of the structure by Council’s
                      Inspector is also required. Please contact Council’s Development Assessment Branch on
                      5329 6500 to arrange the inspection.
               22.    This approval lapses where the construction of the jetty has not commenced within two (2)
                      years of the date of issue of the approval, unless application is made and approved by
                      Council for an extension.
               23.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:




                                                                                                               Page 6 of 8

Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022

Page 7

                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     The approval or conditions do not absolve the owner of the land from complying with all the
                      conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
                      statues and/or statutory regulations in the execution and/or performance of said works.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               5.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Aboriginal Cultural Heritage Act 2003
               6.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If

                                                                                                          Page 7 of 8

Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022

Page 8

               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                       Page 8 of 8

Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022

Used in these records

About this file

File size
282 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU22 0017 [As Published].pdf · 282 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.