Delegated Report - Code - Planning MCU22 0017 [As Published] · MCU22/0017
4. ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
7882-S001 C1 Cover Sheet, Drawing Schedule and 12 November 2021
Locality Plan prepared by Black &
More
7882-S002 C1 General Notes – Sheet 1 of 2 12 November 2021
prepared by Black & More
7882-S003 C1 General Notes – Sheet 2 of 2 12 November 2021
prepared by Black & More
7882-S004 C1 Site Plan, Framing Plan and Jetty 12 November 2021
Elevations prepared by Black & More
As annotated by Council
7882-S005 C1 Typical Jetty Details Sheet 1 of 3 12 November 2021
prepared by Black & More
7882-S006 C1 Typical Jetty Details Sheet 2 of 3 12 November 2021
prepared by Black & More
7882-S007 C1 Typical Jetty Details Sheet 3 of 3 12 November 2021
prepared by Black & More
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with by 1 March 2024, unless an application to extend the currency period is
approved by Council.
General Conditions
3. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure(s) must not exceed 2.
4. The use of the jetty must not cause any adverse effects on the amenity of the surrounding
areas including changes to light, views, air quality and noise.
5. Vessels berthed/moored at the jetty must be located a minimum of 1.0m from the
prolongation of the property boundaries.
6. Vessels and boatlifting devices must be connected directly to the jetty, and not located side
by side or in tandem with another vessel.
7. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
8. All structures must have no detrimental effects on stormwater drains and/or easements.
9. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
10. A rigid handrail must be fitted on one side of the walkway.
Page 5 of 8
Document Set ID: 21833243
Version: 4, Version Date: 01/03/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU22 0017 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 282 KB (small file)
- File type
No other editions are linked here.