Council archive · source document
Minor Change request · 51901.3614.03
Friday, 17 December 2021
Our Ref: 19254
NOOSA COUNCIL
PO BOX 141
TEWANTIN QLD 4565
ATTENTION: Wilhelm Koschade
Dear Will
MINOR CHANGE APPLICATION – ‘NETANYA NOOSA’
71 HASTINGS STREET, NOOSA HEADS
In relation to the Development Approvals granted for ‘Netanya Noosa” and most recently changed on
15 October 2020, on behalf of the Body Corporate for Netanya Noosa we hereby make a further
change application pursuant to Section 78 of the Planning Act 2016.
The change relates to approvals:
Ref 51901.3614.01 - TPC1008
Ref 51901.3786.02 - TPC1737
Ref 51992.479.01 - TPC2418
Ref 51994.1249.01 - TPC2678
Ref 51994.1048.01 - TPC2679
MCU13/0081.01
In support of the request we attach:
Change Application Form 5
Amended proposal plans
Traffic engineering advice
PROPOSED CHANGES
The proposed change is largely to facilitate the works to be undertaken in 2 stages. The change also
includes some additional amendments to the proposed works and a change to some conditions of
approval which cannot be achieved due to existing development constraints.
Details of the proposed changes are:
1. Inclusion of the attached proposal plans as approved plans. These plans provide for:
2 stages of development. Stage 1 (which is substantially complete) includes the bulk of
the works, with stage 2 to comprise Lots 3, 4 & 5 commercial tenancies and forecourt area.
The stage 2 works include variations to tenancy awning/roofline and revised landscape
components.
A new pergola to unit 204
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
2. Amendment of conditions:
A minimum of 39 car parking spaces must be provided on the site in accordance with
approved plans; made available and accessible at all times while the use is open for
business.
Due to an existing structural column which runs across one of the proposed new car
spaces it is not possible to provide 39 car parking spaces, with only 38 car parking spaces
achievable. Drawing no 19021 SD20.00 identifies this space and existing column (which
sits between car parks 15 & 37) and now proposes this area become a storage space.
Onsite car parking must comply with AS/NZS2890.1:2004 Parking Facilities- Part 1: Off-
street car parking.
AS/NZS2890.1:2004 did not apply at the time of original approval and development and
the existing car parking does not comply with this standard.
As part of the refurbishment, an additional parking space is provided, with minor
modifications to two existing small car spaces. No additional changes are proposed to the
existing car parking area.
Further commentary on existing and proposed car parking is included in the attached
correspondence from TTM Consulting, together with recommended condition changes.
A certification by a suitably qualified person for the upgraded car parking area is required
upon the completion of works and prior to issuing the Certificate of Classification to
confirm compliance with the conditions of this permit.
Refer attached correspondence from TTM Consulting.
It is requested the conditions be amended as follows:
Approval Reference Condition Amended Condition
51901.3614.01 - TPC1008 2 Change reference of approved plans to include
51901.3786.02 - TPC1737 28 the attached amended plans.
51992.479.01 - TPC2418 18
51994.1249.01 - TPC2678 18
51994.1048.01 - TPC2679 18
MCU13/0081.01 10
51901.3614.01 - TPC1008 15 A minimum of 38 car parking spaces must be
51901.3786.02 - TPC1737 41 provided on the site in accordance with approved
51992.479.01 - TPC2418 31 plans; made available and accessible at all times
51994.1249.01 - TPC2678 28 while the use is open for business.
51994.1048.01 - TPC2679 31
MCU13/0081.01 23
51901.3614.01 - TPC1008 16 The new (or modified) car parking spaces must
51901.3786.02 - TPC1737 42 comply with AS/NZS2890.1:2004 Parking Facilities
51992.479.01 - TPC2418 32 -Part 1: Off-street car parking.
51994.1249.01 - TPC2678 29
51994.1048.01 - TPC2679 32
MCU13/0081.01 24
Page 3
51901.3614.01 - TPC1008 18 A certification by a suitably qualified person for
51901.3786.02 - TPC1737 44 the new (or modified) car parking spaces is
51992.479.01 - TPC2418 34 required upon the completion of works and prior
51994.1249.01 - TPC2678 31 to issuing the Certificate of Classification to
51994.1048.01 - TPC2679 34 confirm compliance with the conditions of this
MCU13/0081.01 26 permit.
MINOR CHANGE CRITERIA
Planning Act 2016 defines a minor change as:
A minor change, for a development approval, is a change to the approval that —
i. would not result in a substantially different development; and
The DA Rules state:
In determining whether the proposed change would result in substantially different
development, the assessment manager or referral agency must consider the individual
circumstances of the development, in the context of the change proposed.
Description / Provisions Comment / Response
A change may be considered to result in a substantially different development if the proposed
change:
Involves a new use; or No new land use is proposed.
Results in the application applying to a No new land is included as part of the
new parcel of land; or application.
Dramatically changes the built form in The proposed changes do not dramatically
terms of scale, bulk and appearance; or change the built form in terms of scale, bulk
and appearance.
Changes the ability of the proposed No changes are made to the proposed
development to operate as intended (for development to impede its operations.
example, reducing the size of a retail
complex may reduce the capacity of the
complex to service the intended
catchment); or
Removes a component that is integral to The proposed changes do not involve
the operation of the development; or removal of a component that is integral to
the operational of the development.
Significantly impacts on traffic flow and The proposed changes do not result in
the transport network, such as increasing significant impacts on traffic flow and the
traffic to the site; or transport network, such as increasing traffic
to the site.
Introduces new impacts or increases the The proposed change does not introduce
severity of known impacts; or any new impacts, nor will it increase the
severity of known impacts.
Page 4
Removes an incentive or offset component No incentive or offset components
that would have balanced the negative incorporated.
impact of the development; or
Impacts on infrastructure provisions. The proposed development does not impact
upon infrastructure provisions.
ii. if a development application for the development, including the change, were made
when the change application is made would not cause—
Description / Provisions Comment / Response
A. the inclusion of prohibited No prohibited development proposed.
development in the application; or
B. referral to a referral agency, other than The original application did not trigger
to the chief executive, if there were no referral. No additional referrals are required.
referral agencies for the development
application; or
C. referral to extra referral agencies, other No extra referrals are required.
than to the chief executive; or
D. a referral agency to assess the No additional referral assessment
application against, or have regard to, triggers/aspects are required.
matters prescribed by regulation under
section 55(2), other than matters the
referral agency must have assessed the
application against, or have had regard
to, when the application was made; or
E. public notification if public notification The original application required public
was not required for the development notification.
application.
Accordingly, the subject change is a minor change.
ASSESSMENT
Pursuant to Clause 81 (4) & (5) the responsible entity must consider the statutory instrument, or
other document, as in effect when the development application for the development approval
was properly made.
Comment: The proposed changes are minor and do not offend the assessment criteria that
applied when the development application was made or is now in effect.
However, the responsible entity may give the weight the responsible entity considers is
appropriate, in the circumstances, to—
(a) the statutory instrument or other document as in effect when the change application
was made; or
(b) if the statutory instrument or other document is amended or replaced after the
change application is made but before it is decided—the amended or replacement
instrument or document; or
(c) another statutory instrument—
Page 5
(i) that comes into effect after the change application is made but before it is
decided; and
(ii) that the responsible entity would have been required to consider if the
instrument had been in effect when the development application for the
development approval was properly made.
Comment: The proposed changes are minor and do not offend the assessment criteria that
applied when the development application was made or is now in effect.
CONCLUSION
The proposed changes remain largely consistent with the current approval and the development form
for the site. The proposed changes will not compromise the current planning scheme intent.
Approval of the minor change is warranted.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
Page 6
SUNSHINE COAST PO Box 6380 Maroochydore BC Qld 4558 P 07 5443 2844 E _ [email protected] PROJECTURBAN.COM.AU PROJECT URBAN PTY LTD ACN 608 895 923 ABN 97 608 895 923 erat iquor Licensing Water Connections WATER & SEWERAGE CERTIFIERS
Used in these records
Minor Change request.pdfRelated documentApplication case desk ↗
Minor Change request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 257 KB (small file)
- File type
No other editions are linked here.