                                  Form 6 - Decision Notice
                                  INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2007/387                          Date of Decision:       4 September 2007

1.     APPLICANT DETAILS

 Name:               Ausmar Homes

 Postal address:     PO Box 418
                     COOROY QLD 4563


 Phone no:           5442 6413              Fax no:      5442 6549

2.     PROPERTY DESCRIPTION

 Street address:     28 Orealla Crescent Sunrise Beach

 Real property       Lot 1 RP 189331
 description:

3.     OWNER DETAILS

 Name:               AGP Corporation Pty Ltd

 Postal address:     3 Myall Street
                     COOROY QLD 4563

4.     REFERRAL AGENCIES

 Referral Agency            Address                                                   Basis
 Nil

5.     APPLICATION TYPE

 Development                     Development Details                        Preliminary         Development
                                                                             Approval              Permit
 Operational Works               Landscaping, Carparking & Access,               No                 Yes
                                 Frontage Works, Stormwater &
                                 Drainage and Fill

6.     DECISION DETAILS

Council decided to approve the application and grant a Development Permit, subject to conditions.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.

8.     SUBMISSIONS

Not Applicable.
Full text of the other 8 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                                  2 of 9

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Nil

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                              Date:          4 September 2007




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     3 of 9




                                       Noosa Council Conditions
                                       INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION



Landscaping

1.     The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
       approved plan of Development. The approved plan is titled Landscaping Layout Plan, Project number –
       2006-SRB-AUH, AO-001, amended May 2007, prepared by Michael Petrascu Designs and dated June
       2007 and may be amended by these conditions.

2.     The landscape construction is to be implemented in accordance with the amended landscape plan,
       planting schedule and horticultural industry best practices.

3.     In order to achieve planting that relates to the size and scale of the proposed development and provides
       appropriate screening vegetation the species indicated in the Planting List shall be replaced with the
       following species and pot sizes as annotated on the Landscaping Plan:-

Nr.            Species to be Replaced               Replacement Species                 Replacement Size

1              Acacia Conferta                      Elaeocarpus reticulatus             As per Planting List

2              Acacia flavescens                    Elaeocarpus reticulatus             As per Planting List

3              Banksia conferta                     Backhousia citriodora               As per Planting List

4              Brachychiton bidwilli                Acmena hemilampra                   As per Planting List

5              Callistemon polandil                 Callistemon salignus                45 Litre

6              Melaleuca elliptica                  Melaleuca “Rev Gold”                45 Litre

7              Syzyglum wilsonil                    Syzygium Australe                   45 Litre

8              Banksia Robur                        Szygium peniculatum                 45 Litre

9              Leptospermum petersonil              Szygium peniculatum                 45 Litre

4.     All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
       be visible at all times to ensure prompt access in case of emergency.

5.     All native plant species located in group plantings shall not be subjected to any hedging maintenance
       regimes.

6.     Two x Banksia integrifolia species of 45 Litre pot size shall be provided as street trees in the road reserve
       at the frontage of the property.

7.     Street trees shall be planted a minimum of 1m from the back of the kerb in the road reserve verge.

8.     All street trees and internal trees 45 litre and greater must be securely tied and staked to assist their
       growth during the establishment period. All street trees shall be provide with hardwood edging surrounds.

9.     The density of planting must achieve the set out requirements as detailed on the approved landscape
       plan.

10.    Soil mounding shall be provided to all the front garden areas to assist plant growth and minimise the bulk
       of the building from the road frontage.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     4 of 9


11.    Prior to commencement of earthworks and removal of trees, all existing trees nominated for retention on
       the approved Council plans must be cordoned off with protective barricade fencing to prevent impact from
       all future construction works.

12.    All target or hazard pruning required on trees to be retained must be carried out by a qualified
       experienced arborist.

13.    All 45 litre trees must be planted with a clean trunk of 1 metre in height to ensure clear vehicle sight lines
       within the carpark.

14.    The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
       service meters within the site.

15.    All trees must be located:

       15.1. a minimum of 1.0 metres from all services to prevent root/service conflict and to provide future
             ease of maintenance requirements

       15.2. a minimum of 2.0 metres from stormwater catchpits

       15.3. a minimum of 4.0 metres from all overhead street lighting.

16.    Internal pavements within the drip zone of existing trees to be retained on the site shall be pervious
       pavement and constructed so as not to damage the tree or their root system in any way. A hard
       landscaping plan detailing the type and extent of pervious pavement shall be approved by Council prior to
       the commencement of construction.

17.    This Development Permit lapses if the development has not happened by 4 September 2009 unless
       application to extend the currency is approved by Council.
Land Development
18.    The development shall be carried out in accordance with Engineering drawings Nos 16115-OW-1C and
       16115-OW-2A by SCG Consulting Engineers dated 25 June 2007 or as modified herein.

19.    Roof and surface runoff connection to Council’s kerb and channel shall be as shown on drawing No.
       16115-OW-1C dated 25 June 2007 by SCG Consulting Engineers. Kerb adaptors shall be used in the
       kerb.

20.    The access driveway shown on drawing number 16115-OW-1C dated 25 June 2007 by SCG Consulting
       Engineers shall be amended to be a maximum of 5.0 metres wide within Orealla Crescent between the
       kerb and channel and the property boundary. In this regard a revised drawing indicating the
       abovementioned changes shall be submitted to Council for approval prior to the pre-start meeting.

21.    The footpath sections of the access driveway shall be constructed to have a maximum crossfall of 2.5%
       sloping towards Orealla Crescent.

22.    The excavation of the site and the construction of the proposed works shall not have any adverse affects
       on the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
       Registered Professional Engineer Queensland shall supervise the excavation of the site and the
       construction of the new works to determine whether any additional measures are required to protect the
       stability of adjoining buildings and/or structures and/or services and/or lands.

23.    Certification of the completed works must be provided to Council by the supervising engineer. The
       certification shall state that the completed works conform with all aspects of the design and that the
       completed works, including on site infiltration systems, will not have any adverse affects on the stability of
       adjoining buildings and/or structures and/or services and/or lands.

24.    A footpath 1.5 metres wide shall be constructed across the full frontage of the development. The footpath
       shall have a slip resistant surface. The alignment, of which, shall be determined on site with Council’s
       Construction Technical Officer. The expansion joints in any bikeway/footpath shall be “sawcut” not trowel
       jointed.

25.    Install suitable root barrier where proposed trees are adjacent to paths, pavement etc in accordance with
       Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     5 of 9


26.    Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
       first existing external downstream stormwater structure.
       These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
       These devices are to remain in place during the civil works and construction phases of the development.
       The location and type of device to be installed shall be established at the “pre start” meeting with
       Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
27.    Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
       intention to commence works to arrange a “pre start” meeting regarding the civil works.

28.    The principal contractor must have all the appropriate insurance and public liability documentation to carry
       out the works. The principal contractor is also responsible to ensure that any sub contractors also have
       the appropriate insurance and public liability documentation.

29.    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
       signed approved drawings and conditions by the applicant.

30.    The Consulting Engineers for the project shall be currently Registered Professional Engineers of
       Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
       Council’s Construction Technical Officer or nominated staff.

31.    Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
       (This person will be the contact for the project).

32.    Council standards shall apply to these works unless otherwise modified herein.

33.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the engineering works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.

       If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
       Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the
       satisfaction of the Manager Land Development.

       All rectification works are to be completed prior to the commencement of the use or, alternatively, the
       Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
       being paid by the Applicant to the Council prior to the commencement of the use.

       In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
       Applicant, such cost being paid prior to the commencement of the use.

34.    The development of the site shall be carried out in such a manner as to prevent dust and/or sand
       nuisance to residents and/or tenants in the vicinity of the development.

35.    Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
       pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Manager-Land Development or his nominee.

36.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Traffic Infrastructure (Roads) Act.

37.    Safe pedestrian access on Orealla Crescent shall be maintained at all times. Should footpath / road
       closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410
       512 505) must be notified prior to the proposed closure.

38.    Sediment and erosion control measures must be in place prior to works commencing. If such measures
       are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
       sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
       natural waterways. Although the sediment and erosion control measures have been approved on drawing
       No 16115-OW-1C dated 25 June 2007 by SCG Consulting Engineers, Council’s Manager – Land
       Development may request further controls to be installed should approved measures be inefficient.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                                6 of 9


39.    The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps in
       accordance with the manufacturers specifications.

40.    The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on a
       weekly basis and after each storm event.

       The owners of the subject property shall enter into an ongoing maintenance contract with a Registered
       Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a regular three
       monthly cycle and on a “On Call” basis in the case of an emergency.

       The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be included in
       the Community Management Scheme for the completed development.

41.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
       on construction works during the maintenance period, which is a minimum period of 12 months duration.
       Such bond must be lodged by, and shall only be accepted from the Developer for the works.

42.    These works are also to be in compliance with the relevant conditions of Development Permit No.
       2004/5045.

43.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations from Council's standards exist, then Council standards shall apply




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                              7 of 9



                                    Local Laws, Policies & State
                                    Regulation Requirements
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL
1.      Should any changes or modifications to the approved plans be required as a result of construction
        constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be
        made. Amended plans clearly indicating the changes must be lodged with this application along with the
        appropriate fees.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           8 of 9



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to
                                                                          against the part of the approval that represents the
   development applications
                                                                          concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-
   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;
                                                                             (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
       (2) The appeal must be started within 20 business                  approval resulted from a development application
                                                                          (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day
                                                                          if it were an application under a superseded planning
   the decision notice or negotiated decision notice is
                                                                          scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the
                                                                          mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the
                                                                          against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact
                                                                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for
                                                                          the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                       9 of 9

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@78032cf4\@[email protected]

Used in these records

About this file

File size
36 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00000387.001 [As Published].pdf · 36 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.