Original source · versioned page text
Attachment 1.pdf
Attachment 1 – Concept Stormwater Management Plan Material Change of Use for Multiple Dwellings (8 Dwellings) 25 & 27 Toolar Street, TEWANTIN QLD 4656 Lots 1 & 2 on RP73072 Concept Planning and Development Consultants ABN 99 789 542 467 26 Seafarer Drive, River Heads QLD 4655 : 0418531673 : [email protected] [OCR of page images] SMOLIN Attachment 1 — Concept Stormwater Management Plan Material Change of Use for Multiple Dwellings (8 Dwellings) 25 & 27 Toolar Street, TEWANTIN QLD 4656 Lots 1 & 2 on RP73072 Concept Planning and Development Consultants ABN 99 789 542 467 26 Seafarer Drive, River Heads QLD 4655 @: 0418531673 D4: [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 1.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
PROPOSED TOWNHOUSE DEVELOPMENT
LOT 1 & 2 ON RP 73072,
25-27 TOOLAR STREET, TEWANTIN.
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
PROPOSED TOWNHOUSE DEVELOPMENT
LOT 1 & 2 ON RP 73072,
25-27 TOOLAR STREET, TEWANTIN.
LOCALITY PLAN
www.dialbeforeyoudig.com.au
DIAL1100
BEFORE YOU DIG
HEIGHT DATUM
Lot 1 & 2 on RP 73072
Level Datum AHD
Level Origin PM 18416, RL 9.967m
Survey information provided by Max
Watterson & Associates
SHEET LIST
51050-CS
51050-C1.1
050-C2.1
0350-C3..1
0350-C3..2
050-C4.1
|
|
|
|
|
10350-C5.1
5
5
5
5
5
COVER SHEET
EXISTING SURVEY & SERVICES
EARTHWORKS
DRIVEWAY & ACCESS
DRIVEWAY SECTION
VEHICLE MANEUVERING
CONCEPT STORMWATER MANAGEMENT
CONSTRUCTION NOTES
GENERAL:
1. DO NOT SCALE FROM THIS DRAWING.
2. ALL DIMENSIONS IN MILLIMETRES
3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE
ARCHITECTURAL DRAWINGS.
4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE
ARCHITECTURAL DRAWINGS ARE TO BE REFERRED TO THE
ENGINEER IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING
SERVICES WITHIN AND ADJACENT THE ALLOTMENT AND SHALL
ENSURE THAT ALL NEW WORKS ARE IN ACCORDANCE WITH
THE ATTACHED CRITICAL DEPTH LINE DIAGRAM.
Revision | Description Date
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and a associa' ated deta contained on this and associated
drawings are copyright ond are not to be used or reproduce ced without
the witten ‘sermon of af SCG Cons sulting Engineers.
Unit 1/11 Project Ave.
C Noosa Heads’
pn (07) 5455 p604
mal ‘admi ren
CONSULTING n@s a wine
Title:
COVER SHEET
29-27 TOOLAR St,
TEWANTIN
Date: Nov 21 Drawn SR Design SR
1:[email protected]: Drg No. Rev.
| Storm | |S1050-CS | .
Page 3
DRAWING SIZE — Al
HEIGHT DATUM
Lot 1 & 2 on RP 73072
Level Origin PM 18416, RL 9.967m
Survey information provided by Max
Watterson & Associates
LEGEND
_--777~ INDICATES EXISTING SURFACE CONTOURS
907 AND LEVELS TO AHD.
4\89 EXISTING SURFACE SPOT LEVELS.
—— E —— INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
—_— w———_ INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM EXACT
LOCATION PRIOR TO WORKS
| ——__ INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM EXACT
LOCATION PRIOR TO WORKS
— sw/ex ————_ INDICATES STORMWATER DRAIN EXISTING
AS NOTED
www.dialbeforeyoudig.com.au
DIAL1100
BEFORE YOU DIG
=»
SSS =
Level Datum AHD oe
DUI
Aalojg OMI Te
4FFL 1
FF;
RP1351
Aaiojg af6buls
Bottlebrugh
Bottlebrush
Bottlebfush
Lillypilly
Exotic
oe
+
TOOLAR
asnoH
Aas0jg [Bulg
FFL 15.76
Scale 1: 150
1
RP88534
pays
puoquojoy
SITE PLAN — EXISTING SURVEY AND SERVICES PLAN
LS
&
‘ 2
s t
% 3 Q, S
5 3 ae S &
| Ss Qt cyoz7 ly Ts Z s S
= St —I 56 Oo JO00Y o. aa 3 a
jor ley ic S28 & 1. % s
On + |EXISTING BUILDING TO BE “ a| ¢
O|— DEMOLISHED oo) &
co = Sy
St
NL] Q — >
al
3 & 8 on j % = - 8 3
C r . oO
Zp 24 W.M. eo! & 1 “ s by
+ & & |e, fo,
Ls | Ox L Zz 5S fo,
SD. La bs Lo,
2, % S Z o oy SL
+ La 5 . ® s
p Z 3 Gy
>. = ‘, “ Sa s g
Sx ® & 24 S ©
“+0 —___ $ | @] ©
ss o LE
aR ® 0; oo “o, & « —
<< | % 5%, 8 3 & %
S 5 2 %2 3 4s, 8
a & c 3 5 = S. 4 g
% | 2 “ *o oa % << S
“Bi a } & Oo 6.
8 B O Z Lo
z & Q; DSSS]. [>——4
F.H | 3 + ‘ BSR S854 7 i
O° a Ss
Se S|, 85308995 >
‘
% | Bcc 5
“4 X 8 His N w
N & <
&. °
“e, a, &,, _| 2 a 8 4 € =
£4 5 ---{ yz ~- 2 Ss LO ©
ir EXISTING BUILDING TO BE =~ b,
Q DEMOLISHED % &,
Sa Qo © L yY
—4---4 re o [ets — BS +
= Tt 7 . 2,
z “lel %
z&
am x
& a:
FP) 8 ; =
" ®, Gs
Ss Pn = S
%e “4 3
Lip = a
a a
>
5
2
4 %, a
& ‘ZL: x
O. + .
gy ccc 0G
w —_ =— OS ser ere FT
x=)EX SMH & & 169.69€
3 O° &, Za 2 +
os a “ > “, 6urpying youg
ei £ Aas0js afBuls
aa “
RP114684
mt: 150 @ A
1:300 @ A3
KE
EX. SWPT EXISTING STORMWATER PIT
RC. HW. — REINFORCED CONCRETE HEADWALL
EX. SMH — EXISTING SEWER MANHOLE
E.0.B. EXISTING EDGE OF BITUMEN
kK&c EXISTING KERB & CHANNEL
N.S.L. NATURAL SURFACE LEVEL
FH. FIRE. HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
WM. WATER METER
Revision Description Date
Issue:
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
_ Unit 1/11 Project Ave,
P Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
DEBUILD T/A,
Title:
EXISTING SURVEY PLAN
29-27 TOOLAR St,
TEWANTIN
Date: Nov 21 Drawn SR Design SR
Srchordsn |! [OOSO-C1.1 |
Page 4
DRAWING SIZE — Al Level Datum AHD Watterson & Associates HEIGHT DATUM Lot 1 & 2 on RP 73072 Level Origin PM 18416, Survey information provided by Max RL 9.967m 43077 _it 4 418.0 RAMP. <x. /D S/EX — sw/ex eee RW SS = RETAINING TO SIDE OF BUILDINGS TO MAINTAIN EXISTING SURFACE LEVELS DOWN BOTH SIDE BOUNDARIES FOR | OVERLAND FLOWS o. 2s. &. f+ G Ce “ey a “, + L Y + 3 8 &, (0142) “9, t+, “se on & 0.142 Se Sy & - x ay ce, [7 Li] & O. S % | t+to Pey MINOR RESHAPING TO EX. GROUND LEVELS IN ROAD RESERVE FOR NEW DRIVEWAY. ENSURE MIN. COVER TO SERVICES ARE MAINTAINED AND RE-TURF. L.| Lo ° eH La Lo NX +T 1:3 MAX BATTER, TYPICAL. LEGEND INDICATES EXISTING SURFACE CONTOURS AND LEVELS TO AHD. INDICATES FINISHED SURFACE GRADE EXISTING SURFACE SPOT LEVELS. INDICATES DIRECTION OF RAMP UP OR DOWN AS INDICATED INDICATES DEPTH OF CUT (NEGATIVE) OR FILL (POSITIVE) AS NOTED INDICATES OVERHEAD ELECTRICITY SUPPLY LINE INDICATES EXISTING SEWER LINE INDICATES WATER MAIN APPROX ALIGNMENT, BUILDER TO CONFIRM EXACT LOCATION PRIOR TO WORKS INDICATES TELSTRA LINE APPROX ALIGNMENT, BUILDER TO CONFIRM EXACT LOCATION PRIOR TO WORKS INDICATES STORMWATER DRAIN EXISTING AS NOTED &. _ LANDSCAPED ot a 6. & es iy O. & + |S. eg ot ut ~ Yn Z Op, |e ve ta, [it re = Z = = », LO x an 6, % , \(0.086) 5, C085) 3 %, | Sze 4 Z4 4 Sp, 6 4+) ON ai x Se re RETAINING 10 SIDE OF BUILDINGS TO | gas MAINTAIN EXISTING SURFACE LEVELS > DOWN BOTH SIDE BOUNDARIES FOR | INDICATES POSITION OF RETAINING WALL TO FUTURE DETAIL. INDICATES AREA OF FILL INDICATES AREA OF CUT www.dialbeforeyoudig.com.au DIAL1100 BEFORE YOU DIG REFER Drg 31031-C3.1 FOR DRIVE WAY DETAILS. OVERLAND FLOWS SITE PLAN — EARTHWORKS Scale 1: 150 ALL SERVICES SHOWN ON THIS PLAN INDICATIVE ONLY CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO COMMENCING WORKS ON SITE. ALL NOTE: CUT/FILL LEVELS SHOWN REPRESENT THE PAD LEVEL TO THE UNDERSIDE OF THE GROUND BEARING SLABS AND PAVEMENTS AND INCLUDES THE CRUSHER DUST OR ROAD BASE LAYERS TO BE PROVIDED UNDER THE SLABS. ADDITIONAL LANDSCAPING FILL NOT INCLUDED. SERVICES ARE TO BE PROTECTED IN ACCORDANCE WITH THE AUTHORITY RESPONSIBLE FOR THE SERVICE THE BUILDER/CONTRACTOR SHALL CONFIRM ALL RELEVANT LEVELS PRIOR TO COMMENCING WORKS. LZ KEY EX. SWPT EXISTING STORMWATER PIT RC. HW. EX. SMH — EXISTING SEWER MANHOLE E.0.B. EXISTING EDGE OF BITUMEN K&C EXISTING KERB & CHANNEL NS.L. NATURAL SURFACE LEVEL FH. FIRE HYDRANT TP TELSTRA/NBN PIT EP. ELECTRICAL POWER POLE ET. ELECTRICAL TRANSFORMER W.M. WATER METER KERB EXISTING KERBING BUILDER TO MAINTAIN STABILITY OF NEIGHBORING PROPERTIES DURING EARTHWORKS. POST & PLANK WALLS CAN BE USED IF EXCAVATIONS CLOSELY FOLLOWED BY PLANK INSTALLATION OR ALTERNATIVE SITE RETENTION MEASURES WILL BE REQUIRED. GROUND / ZZ THIS FOOTING WITHOUT y—— PIERS IS FOUNDED ABOVE CRITICAL DEPTH LINE AND IS UNSTABLE. THIS FOOTING IS FOUNDED BELOW CRITICAL LINE AND IS STABLE. PIERS SUPPORTING STRIP FOOTINGS OR \\ POST PAD FOOTINGS FOUNDED INTO SELECTED MATERIAL AND BELOW CRITICAL LINE ARE CONSIDERED STABLE. STABLE \G Oy Wey, PAD LEVEL UNSTABLE aa) NS N NOTE: THIS DETAIL ALSO APPLIES TO EXISTING FOUNDATIONS ON NEIGHBOURING PROPERTIES. SHEET PILING MUST BE INSTALLED WHERE EXISTING FOOTINGS WILL BE FOUNDED ABOVE ANY EXCAVATION CRITICAL DEPTH LINE T | THE BUILDER/CONTRACTOR | MUST CONFIRM ALL | RELEVANT LEVELS PRIOR TO COMMENCING WORKS. | | | LINE OF PROPOSED Le POOL EXCAVATION OR OTHER TRENCH. XN of. sown HORIZONTAL Nye (—\ CRITICAL DEPTH LINE - EXCAVATION (7 PPRICAL SECTION 0 2 4 6 8 REINFORCED CONCRETE HEADWALL 10 rm :150 @ AI CONSTRUCTION NOTES GENERAL: 1. DO NOT SCALE FROM THIS DRAWING. 2. ALL DIMENSIONS IN MILLIMETRES 3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS. 4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE ARCHITECTURAL DRAWINGS ARE TO BE REFERRED TO THE ENGINEER IMMEDIATELY. 5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW WORKS ARE IN ACCORDANCE WITH THE ATTACHED CRITICAL DEPTH LINE DIAGRAM. FILLING NOTES —THE SITE IS TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND DEBRIS. —THE SUBGRADE IS TO BE ROLLED WITH A VIBRATING STEEL DRUM ROLLER TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 98%. THE COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7 BLOWS PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING ENGINEERS FOR APPROVAL. —UNLESS NOTED OTHERWISE A MINIMUM BEARING CAPACITY OF 100kPa SHOULD BE ACHIEVED WITHIN COMPACTED FILLING. COMPACTION & BEARING CAPACITY TEST RESULTS MUST BE PRESENTED TO SCG CONSULTING ENGINEERS FOR APPROVAL PRIOR TO WORKS PROCEEDING. THE FILL MATERIAL CLEAN GRANULAR MATERIAL (I.E. SAND TO A CLAYEY SAND IN ACCORDANCE WITH AS1726) BE FREE OF ANY ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12% (PLASTICITY INDEX LESS THAN 25%, LINEAR SHRINKAGE OF 15%). THE PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATIBILITY. —THE FILL IS TO BE PLACED AND COMPACTED IN ACCORDANCE WITH AS3798-1996 TO A LEVEL SUFFICIENT TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 98%. COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING ENGINEERS FOR APPROVAL. FILLING AND COMPACTING ADJACENT EXISTING STRUCTURES IS TO BE IN STRICT ACCORDANCE WITH THE ASSOCIATED DETAILS AND SPECIFICATIONS. —AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL BE BACKFILLED WITH THE APPROVED FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 98%. —ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE PREPARATION SHALL BE REMOVED AND REPLACED WITH THE APPROVED FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 98%. ~SITE DRAINAGE AND SILT PROTECTION MEASURES MUST BE ISTALLED PRIOR TO CONSTRUCTION COMMENCING. A EARTHWORKS AMMENDED 25.11.21 Revision | Description Date Issi * FOR APPROVAL DO NOT SCALE FROM THIS DRAWING The design and associated details contained on this and associated drawings are copyright and are not to be used or reproduced without the written permission of SCG Consulting Engineers. Unit 1/11 Project Ave, Noosa Heads Ph (07) 5455 5604 email:[email protected] web:www.scg-engineers.com ‘ABN 40 098 481 699 O see DEBUILD T/A, CONSULTING Title: EARTHWORKS PLAN 29-27 TOOLAR St, TEWANTIN Date: Nov 21 Drawn SR Design SR 1500 6 5 || SER, i 31030-C2.1| A
Page 5
DRAWING SIZE — Al
KE CONSTRUCTION NOTES
— GENERAL:
EX. SWPT EXISTING STORMWATER PIT 1. DO NOT SCALE FROM THIS DRAWING.
RC. HW. — REINFORCED CONCRETE HEADWALL 2. ALL DIMENSIONS IN MILLIMETRES
HEIGHT DATUM EX. SMH — EXISTING SEWER MANHOLE 3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE
Lot 1 & 2 on RP 73072 E.0.B. EXISTING EDGE OF BITUMEN ARCHITECTURAL DRAWINGS.
Level Datum AHD K&C EXISTING KERB & CHANNEL 4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE
eve alum SSS = FS NS.L. NATURAL SURFACE LEVEL ARCHITECTURAL DRAWINGS ARE TO BE REFERRED 10 THE
Level Origin PM 18416, RL 9.967m FH FIRE HYDRANT ENGINEER IMMEDIATELY.
| TP TELSTRA/NBN PIT 5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING
Survey information provided by Max EP. ELECTRICAL POWER POLE SERVICES WITHIN AND ADJACENT THE ALLOTMENT AND SHALL
Watterson & Associates ET. ELECTRICAL TRANSFORMER ENSURE THAT ALL NEW WORKS ARE IN ACCORDANCE WITH
| WN. WATER METER THE ATTACHED CRITICAL DEPTH LINE DIAGRAM.
1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2. MINIMUM CONCRETE THICKNESSES:
S. | 6 PAVEMENT (VEHICLES): 125mm U.N.O.
} o eo
4 oe, <a, &, “ FOOTPATHS: 125mm _U.N.O.
4 .
%o, <.% f+ &, 3. CONCRETE IN ACCORDANCE WITH AS360 AND AS1379
+ Zot, S, %. &, 49, o. &. AND MINIMUM STRENGTHS AS FOLLOWS:
ty 5 % eo, %, ©, “x, 4 PAVEMENT (VEHICLES): 32 MPa
4 Coy >| o o os, at. FOOTPATHS: 25 MPa
by &S, & ; z ~ Viz, &, 4. CONCRETE SURFACE TOLERANCE +5.0mm OVER 3.0m
OOOoo &. & &% 5, REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL
Lf ff f/f LULL, &, SLAB DEPTH.
%, — 1 6. MAX. 1 in 40 CROSSFALL (ACCROSS) ON FOOTPATHS.
+ 60 %) 7. EXPANSION JOINTS AS NOTED (T.J./K.D.J) ON PLANS TO
L FFL 13.75 & Zp. £ BE 10mm WIDE WET TOOLED WITH EVERY 2ND MESH WIRE CUT
“a : & x x ALONG JOINT. REFER DETAIL.
&. , __. FFL 14400 < 8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT,
in wv . 9. FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO
PROVIDE SMOOTH JOINT TO NEW “4 “o f 113730 | 5 S290 B INSIDE EDGE OF CURVE
PAVEMENT (NO TRIP HAZZARD). 8, 4 O. 7] gS 9 iN Q. - oh, . 10. ALL EXISTING SERVICES TO BE LOCATED AND PROTECTED
MAX 1 in 40 CROSS FALL IN % Sy & ns be a “24 —t_—__] “> AS REQUIRED PRIOR TO WORK COMMENCING
(a)
DRIVEWAY WHERE FOOTPATH f+ 0, RESIDEI TAL ‘ {15.660 Sy yt
TRAVERSES, REFER COUNCIL & & S | %
STANDARD DRG. RS-065 DEVEL ORMENT g* o S [ /| Qs,
7 iS 14.230 /, Sle to
| 13.730 ° “5, —— L- | |_ a ee
. pa Ss
x ave) 413.730 * e| AY O5% a
DRIVEWAY CROSSOVER GENERALLY IN a / 5 s L
ACCORDANCE WITH IPWEA STD DRG RS-051 : &, : i |
AND COUNCIL REQUIREMENTS, LEVELS AS FFL 13.75 % @ Eee > L
oy ; t_| ec.
NOTED Z an cm | — FE
Anno ) 2 Ke <0] 8
Ll Veg C SV 14.550 FFL 14.600 os
“SX CREST Lo
fo <¢ rae %
a tetee 5 Le. 2%, s &
a Zl : :
%. 3 | opivews — _ | | B |) Bho, oO SIDENTIAk on Oe
“te| CAN ee || S| fe PL NEMTUNE _- 114.000 fnorrerono |g |_| norco qo “DEVELOPMENT” ce, a, Ss
= SS = ~~~ — 46 — >
EXISTING CROSSOVER 10 BE REMOVED, E Sp, AE x ra wy < %
REINSTATE TYPE Bl KERB & CHANNEL 3 5 = 4 Ld
; + 0:
IN ACCORDANCE, WTH COUNCIL 4y is, °6 FFL 15.000 <. 6
STANDARD DRAWING RS-080, MAINTAIN ¥y ®.
EXISTING SURFACE GRADES. J / > ATLL \ 14860 <. 4+ “
LEGEND . 4 \ 7.65m | meas
|
Loc] \
__---7 INDICATES PROPOSED SURFACE FFL 14.68 - or
43.07 CONTOURS AND LEVELS TO AHD. “o4 ( A
Lob Lo \
5.0% MINOR RESHAPING TO EX. GROUND “z \ 14.880 Q., a
__5.0% _» INDICATES FINISHED SURFACE GRADE LEVELS IN ROAD RESERVE FOR NEW | | | 3 a Sy ale | 5 I r 5
DRIVEWAY. ENSURE MIN. COVER TO J\a ey + O
9 + KS)
4'8: EXISTING SURFACE SPOT LEVELS. SERVICES ARE MAINTAINED. AND . a = 2 ro oan s &,
RE-TURF. \ QJ ode. 2
x INDICATES PROPOSED FINISHED %, ots RESIDENTIAL : +o. ; S MS | BF
SURFACE LEVELS % "et | PEVELO, ENT ge Ns | .
f %, fe 12 Bin ig 1 1
RAMP. INDICATES DIRECTION OF RAMP UP OR oS, “sz, SN \S =
SSS DOWN AS INDICATED Le = ao vy 8 FFL 15.200 by.
NI + l
FIELD INLETS OR JUNCTION BOX PRE-CAST “;, 4, ° ~- X 15.230 [| - , Z 4
Dx] EE] _ CONCRETE CAST-INTO PAVEMENT. REFER SW1.1 4+ |/S. & , Sy \ 4 ¥ “
FOR FURTHER DETAILS. fl, + FFL 14.68 \ +
Te \ Sy YS
GD—xxx GRATED DRAIN CAST-INTO PAVEMENT, UOOUOU Wee Jo
(OTT s—seREFER SW1.1 FOR FURTHER DETAILS
e
(T.) DENOTES WET TOOLED JOINT TO TERRACE 5 L 5 6 <“e Ss 6 » leo &
—-— Ae g ; <. ; y. . L DB. +
SLAB, REFER TO DETAILS Pa y &, on Oy, es 4, ee On BY, |%- +%
+ + = =a
KD. Je, Li) © <. 3 &
(KO) DENOTES DANLEY JOINT TO DETAIL “E& 3 x _ Gn “, % ; “y “oO Fob +e
a Bb Lx
O, = + }
TERRACE SLAB. REFER TO STRUCTURAL 44; BY “+ oy
DETAILS FOR THICKNESS AND so
REINFORCING. | 2 di |
DRIVEWAY SLAB/PAVEMENT. REFER TO
NOTES AND DETAILS FOR THICKNESS AND | |
REINFORCING.
ee INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
A DETAIL ADDED 25.11.21
INDICATES EXISTING SEWER LINE SITE PLAN — DRIVEWAY & ACCESS: Revision Description Date
, Issue:
—___ yw INDICATES WATER MAIN APPROX FOR APPROVAL
ALIGNMENT, BUILDER TO CONFIRM EXACT ALL SERVICES SHOWN ON THIS PLAN INDICATIVE CONTRACTOR TO TOPSOIL AND TURF ANY NEW KERB & CHANNEL TO BE IN ACCORDANCE
LOCATION PRIOR TO WORKS ONLY CONTRACTOR TO LOCATE ALL SERVICES DISTURBED OR DAMAGED AREAS OF THE ROAD | | WITH NOOSA SHIRE COUNCIL STANDARD Dra.
PRIOR TO COMMENCING WORKS ON SITE. ALL RESERVE ADJACENT THE CONSTRUCTION SITE RS-080 & COUNCIL STANDARD DETAILS DO NOT SCALE FROM THIS DRAWING
t INDICATES TELSTRA LINE APPROX SERVICES ARE TO BE PROTECTED IN The des and ossoted detls conned on ths ond ssid
ALIGNMENT, BUILDER TO CONFIRM EXACT ACCORDANCE WITH THE AUTHORITY the written permission of SCG Consulting Engi
LOCATION PRIOR 10 WORKS RESPONSIBLE FOR THE SERVICE MAXIMUM CROSS-FALL OF 1 in 40 ON ALL }e written permission of SC Consulting Engineers.
FOOT-PATHS AND INTERNAL PEDESTRIAN ; ;
—sw/ex—————_ INDICATES STORMWATER DRAIN EXISTING PATHS AND RAMPS PS Noosa Heads’
AS NOTED ALL LINE MARKING TO BE IN ACCORDANCE < Ph (07) 5455 5604
WITH THE QUEENSLAND MANUAL OF UNIFORM 5 Se amaadmin@scg-enginees com
=— WHEEL STOPS AS PER CLIENTS TRAFFIC CONTROL DEVICES & A.S 2890.1 CONTRACTOR TO REPAIR/REINSTATE ANY z fewaomniin
(WS) REQUIREMENTS FIXED AS PER PARKING FACILITIES PART 1: OFF-STREET CAR DAMAGED AREAS OF EXISTING FOOTPATHS, e
MANUFACTURER'S DETAILS PARKING KERB & CHANNELS TO COUNCIL STANDARDS Title:
DRIVEWAY & ACCESS PLAN
www.dialbeforeyoudig.com.au
Project
DIAL1100 25-27 TOOLAR St,
BEFORE YOU DIG TEWANTIN
Date: Nov 21 Drawn SR Design SR
0 2 4 6 8 10 Checked: Drg No. Rev
PU tm: 200 © AI 5
raoco@ as | See, 1 |31030-C3.1| A
Page 6
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
B99 CLEARENCE PROFILE
RP BOUNDARY
Elevation
g § gs €£ § §
Design Line Segment Lengths 3 16 : 2.00 : 13 : i547 : os :
Design Line Grade & Level . 2 : S : = . = : z :
EXISTING S.L. - 2 5 Z Z z
CHAINAGE — : g : S S
CUT/FILL - 5 S g g :
DRIVEWAY PROFILE
DRIVEWAY LONG SECTION A-A
Scale 1: 100
Revision Description Date
Issue:
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
_- Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A,
Title:
DRIVEWAY SECTION
Project
25-27 TOOLAR St,
TEWANTIN
Date: N Drawn Design
ov 21 SR
SR
Checked: Drg No.
Sune—f__2—® "n1:200 @ aL = ot
12400 @ AS TT Reha 51030-C3.2 .
S Richardson
Page 7
DRAWING SIZE — Al
HEIGHT DATUM soocongen
Lot 1 & 2 on RP 73072 =
Level Datum AHD i Y
Level Origin PM 18416, RL 9.967m ee // HEE PARAS pth
Watleson & Assocates Z
L
SSS = FS SP
oO oO
: ep
Oo Oo
OOOOUOODOOO00 OOOOOCOOO0O0d
| |
| |
| |
| |
| | Z
| |
| |
| | | | SIDENT:
| |
| |
| |
| “ | Z
; y oooooo Wy, |
| oooos0o0o0o |
bt — . bt
SITE PLAN — B99 MANEUVERING FORWARD INTO TYPICAL GARAGE SITE PLAN — B99 REVERSING OUT OF TYPICAL GARAGE & EXISTING SITE IN FORWARD MOVEMENT
Scale 1: 400 Scale 1: 400
ONOOOOpooo
Z : ooooo0o Cai |
Z
AI lI
Yi Vv
WA Yo
oO oO
a =n ic
oO oboo0o0o0 Oo
OOOOUDDOOOOOOOO0 OOOOUOOOOO00
| a |
| Lea |
| oboooo |
| =
| eB |
| ‘ | Z
| |
| J |
| | | | Revision | Description Date
| | Issue:
| Z | FOR APPROVAL
| Ze | 77 DO NOT SCALE FROM THAIS DRAWING
| a | sono |p separa Sete ron
| sagaascce | ~ ney
fe He! cL ) SCG rr lores scot
Title:
SITE PLAN — B99 MANEUVERING FORWARD INTO VISITOR CARPARK SITE PLAN — B99 REVERSING OUT OF VISITOR CARPARK & EXISTING SITE IN FORWARD MOVEMENT VEHICLE MANEUVERING
Scale 1: 400 Scale 1: 400
www.dialbeforeyoudig.com.au Project
29-27 TOOLAR St,
DIAL1100 TEWANTIN
BEFORE YOU DIG Date: Nov 21 Drawn SR Design SR
0 3 4 6 8 10 . Checked: Drg No. Re
500 3 | Sa 4 31030-C4.1
Page 8
DRAWING SIZE — Al
HEIGHT DATUM
Lot 1 & 2 on RP 73072
Level Datum AHD
Level Origin PM 18416, RL 9.967m
Survey information provided by Max
Watterson & Associates
RAINFALL
SITE AREA UNDER 2500m?
ALTERNATIVE MEASURES FOR
WSUD IMPLEMENTED
WATER TANKS
-FOR RE-USE & DETENTION
i>
ROOF RUNOFF
WATER TANKS
Y 2
DRIVEWAY
GPT
GPT— GROSS POLLUTANT TRAP
—CAPTURES GROSS POLLUTANTS OJ
+
OPERATIONAL WORKS APPLICATION
SCHEMATIC PROPOSAL ONLY DETAILED DESIGN ISSUED AT
2/125x75x4.0 RHS (GALV.)
LAID AT 1 in 100 MIN. INSTALL TO
NEW KERB ADAPTORS AND MAKE
FOOTPATH GOOD. TYPICAL.
g
: g
L..
4 %
FALL LANDSCAPED AREAS TO FORMED
FLOW PATHS. DIVERT FLOWS TO
RICHARDS STREET FRONTAGE. 1: 150
MIN FALL. TYPICAL.
+ +,
AY
SWACE— a? Ware — <} SWALE =~ <P SWALE — <P
a
f/f fe 7 ARP
i
“,, FFL 13.75
g
SO. ~T
&
RESIDENTIAL
DEVELORMENT
Z|
3 /
a = ye FFL 13.75
g “+ &. + he
2 y WA
RUNOFF TO COUNCIL
INFRASTRUCTURE
WATER CYCLE DIAGRAMATIC
FOR THE SERVICE
ALL SERVICES SHOWN ON THIS PLAN INDICATIVE
ONLY CONTRACTOR TO LOCATE ALL SERVICES
PRIOR TO COMMENCING WORKS ON SITE. ALL
SERVICES ARE TO BE PROTECTED IN
ACCORDANCE WITH THE AUTHORITY RESPONSIBLE
ALL PIPES TO BE LAID AT 1 IN 100 MIN.
UNLESS NOTED
LEGEND
__---7 INDICATES PROPOSED SURFACE
4807 CONTOURS AND LEVELS TO AHD.
5.0% > INDICATES FINISHED SURFACE GRADE
4\89 EXISTING SURFACE SPOT LEVELS.
INDICATES DIRECTION OF RAMP UP OR
RAMP.
— DOWN AS INDICATED
FALL. INDICATES DIRECTION OF FALL
TO FINISHED SPOON DRAINS.
STORMWATER JUNCTION BOX, PRE-CAST
J" CONCRETE. AND SEALED LID
=e GRATED FIELD INLETS, WITHIN PATH AND
= TERRACE AREAS
GD-200 200(W) GRATED DRAIN WITH HEAVY
(ee) SOC(éUTY ‘GRATE.
INDICATES STORMWATER DRAIN PROPOSED
Sw
AS NOTED MIN 1 IN 100 FALL UNLESS
NOTED OTHERWISE
R-swW INDICATES ROOF STORMWATER DRAINAGE
LINE TO HYDRAULIC DESIGNERS DETAILS.
DP INDICATES DOWNPIPES FROM ROOF. REFER
HYDRAULIC CONSULTANT FOR DETAILS
..\..\Documents\Dial—Before—You—Dig—HD.JPG
sw— Ss.
fl
a
—_—
¢
SWALE > —— SWALE —>
O Ww
a Jf
vu y
><
KEY
EX. SWPT EXISTING STORMWATER PIT
RC. HW. — REINFORCED CONCRETE HEADWALL
EX. SMH — EXISTING SEWER MANHOLE
E.0.B. EXISTING EDGE OF BITUMEN
K&C EXISTING KERB & CHANNEL
N.S.L. NATURAL SURFACE LEVEL
FH. FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
WM. WATER METER
DOWNPIPES (DP) SHOWN
Pee DIAGRAMATIC TO DEMONSTRATE
y STORMWATER MANAGEMENT.
NUMBER AND LOCATION TO BE
DETERMINED BY HYDRAULICS
CONSULTANT & ARCHITECT.
PROPOSED LOCATION FOR
Sy
FFL 14.600 ©,
ORMED FLOW INVERT — pereR Dig 31031-C31. Tf
+
2/125x75x4.0 RHS (GALV.)
LAID AT 1 in 100 MIN. INSTALL TO
NEW KERB ADAPTORS AND MAKE
FOOTPATH GOOD. TYPICAL. &p.
ZI
J
SWALE —> —— SWALE —> —— SWALER>
WL obey
ESIDENTIAR, Delf + 4
; 0 TE 3 20.
|
{ 4
Sewer M/H
Xe
LL: 14.11
(L: 12.79
2/125x75x4.0 RHS (GALV.)
LAID AT 1 in 100 MIN. INSTALL TO
NEW KERB ADAPTORS AND MAKE
FOOTPATH GOOD. TYPICAL.
TT a >= =I TX FoR DRIVE WAY DETAILS, = =t=y- Rake Beton | — eA 4, JPBVELOPMEN| 7 OF p
_ cy \ m sy i + uy
<M = BORO = :
Ay. “Z \ ws 7 FFL 15.00 Ko,
Oo DK O \ 4 R-Sw R-Sw k-sw R-sw R-sw r-sw Ye Pe
0. . xo.
ent \\ a 4A |
5 a\ ] y
FFL 1468 9 = a 4 . °
/ P eY| \ ay DF \
4 % 5 \ Z y <a &q | | 4
— = ‘O: - z
\ 2 Zh 8 a ~ 1 | &, 5
+ ww \ 2% | ppl 1+ |
RESIDENTIAL A \ 2 ' FAL. I j ! As
or ws al J , (Oo
| PEVELORMENT YS, % \2 9 $ 4
% \e | 1 ;
ys < 3 m™m
lt Zi we ¢ \ i FFL 15.20 j &. |
+ 9
tb, cS o \ 2. 0 “4
© 8 DP \ a z
<4 46 z \ SH =
FFL 14.68 &, i \ 2
Tf LH |
, R-SW R-SW R-SW R-SW R-SW
Xp * 5
sw—& 7 sw swhr
<S.
+ %
&
*&
SITE PLAN — CONCEPT STORMWATER MANAGEMENT PLAN
HEAVY DUTY TRAFFICABLE
SEALED ACCESS HATCH
TRAFFICABLE CONCRETE
DETENTION TANK FOR ROOF
DRIVE WAY STORM WATER
ONLY, MIN CAPACITY 28000 It
DRIVE WAY SLAB
Scale 1: 150
oO
——
SE
=o
Be
i= {i =
ROOF STORM WATER
INFLOW 7000 Lt MIN.
STORAGE TANK
RE-USE PUMPING AND
RETICULATION BY OTHERS
STORAGE TANK DETAIL
225 DIAM TANK OVERFLOW PIPE
=> 3
WATER DETENTION TANK
DETENTION ZONE
21,000 It
225 DAM —
LOW FLOW ORIFICE, 5mm
135mm ORIFICE HOLE.
DETENTION TANK DETAIL
DETENTION /RE-USE
IN-GROUND STORMWATER
TANK(S)
SITE STORMWATER MANAGEMENT
EXISTING SITE
- SITE AREA = 2020m’?
- IMPERVIOUS AREA = 510m?
PROPOSED SITE
— IMPERVIOUS AREA = 1320m?
SITE_RUNOFF
CONSTRUCTION NOTES
GENERAL:
1. DO NOT SCALE FROM THIS DRAWING.
2. ALL DIMENSIONS IN MILLIMETRES
3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE
ARCHITECTURAL DRAWINGS.
4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE
ARCHITECTURAL DRAWINGS ARE TO BE REFERRED TO THE ENGINEER
IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES
WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL
NEW WORKS ARE IN ACCORDANCE WITH THE ATTACHED CRITICAL DEPTH
LINE DIAGRAM.
HYDRAULICS
1. HYDRAULIC SERVICES SHOWN ARE DIAGRAMATIC ONLY. REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIXTURES.
2. ALL SANITARY HYDRAULICS AND WATER RETICULATION WITHIN THE
ALLOTMENT BOUNDARY TO BE IN ACCORDANCE WITH AS39500.
3. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF AUTHORITIES
HAVING JURISDICTION, AFTER OBTAINING ALL NECESSARY PERMITS AND
APPROVALS.
4. THE CONTRACTOR IS TO CONFIRM THE POSITION OF ALL EXISTING
SERVICES AS INDICATED ON THESE AND ASSOCIATED PLANS DO NOT
CLASH WITH THE PROPOSED PIPE WORKS PRIOR TO THE COMMENCING
OF WORK.
5. ALL TRENCH EXCAVATIONS AND CONSTRUCTION TO BE IN ACCORD
WITH WORKPLACE HEALTH & SAFETY 1989 AND ANY AMENDMENTS AND
THE MINE REGULATION ACT.
6. STORMWATER DRAINAGE PIPES SHALL BE LAID AT A MINIMUM GRADE
OF 1 IN 100 U.N.O. JOINS ARE TO BE CONSTRUCTED IN ACCORDANCE
WITH THE MANUFACTURERS REQUIREMENTS. (REFER NOTE 10.)
7. ALL PRECAST CONCRETE PIPES AND TO MANUFACTURED IN ACCORD
WITH AS. 4058.
8. STORMWATER PIPES SHALL BE THE FOLLOWING CLASSES:
8.1. REINFORCED CONCRETE PIPES (RCP) = CLASS 2.
8.2. uPVC 1008 OR GREATER = CLASS ‘SN8’.
8.3. "STORMPRO’ PIPES = CLASS ’SN8’.
9. ALL RCP PIPES TO HAVE THE FOLLOWING JOINTS U.N.O:
9.1. RCP 600¢ OR LESS = RUBBER RING JOINT.
9.2. RCP 600@ OR GREATER = FLUSH JOINT.
10. ROOF STORMWATER TO DESIGN BY HYDRAULIC CONSULTANTS TO
CLASS *SH’ U.N.O.
11. INSTALL SW MANHOLE AND FILED GULLY/INLETS IN ACCORDANCE
WITH AS1657 AND AS DESCRIBED BELOW:
11.1. MANHOLE/FIELD INLETS >1.35m DEEP = STEP IRONS.
11.2. MANHOLES 0.85m—3.0m DEEP = STEP IRONS.
11.3. MANHOLES >3.0m DEEP = FIXED ACCESS LADDER.
12. SEWERS 100mm DIAM. UPVC U.N.O. AND LAID AT A MINIMUM GRADE
OF 1 IN 60.
13. WATER SUPPLY PIPEWORK BELOW GROUND IS TO BE:
13.1. 63mm DIAM. OR LESS —- HIGH DENSITY TYPE 50
CLASS 12 POLYETHYLENE
14. ALL ABOVE GROUND AND INTERNAL WATER SUPPLY PIPEWORK TO
BE TYPE B COPPER.
15. WATER SERVICES ARE NOT PERMITTED IN GROUND SLABS AND ALL
JOINS AND CONNECTIONS SHALL BE MADE ABOVE THE SLAB.
16. FIRE HYDRANTS ARE TO BE INSTALLED IN ACCORDANCE WITH
AS2419.1. HOSE REELS ARE TO BE INSTALLED IN ACCORDANCE WITH
AS2441. CLEAN-OUTS, INSPECTION OPENINGS AND CLOSING CAPS
SITUATED IN VEHICULAR OR PEDESTRIAN PAVEMENTS ARE TO BE FITTED
WITH EITHER BRASS OR CAST-IRON COVERS.
17. ALL IN-GROUND VALVES SHALL BE IN ACCORDANCE IN APPROVED
CONCRETE PATH BOXES.
18. ALL WASTE PIPES AND WATER SERVICES PENETRATING SLABS TO BE
WRAPPED IN AN APPROVED FLEXIBLE JOINT JOINT WRAPPING.
19. THE TERM ’SERVICE’ REFERS TO THE MINIMUM INTERNAL PIPE
DIAMETER UNLESS NOTED OTHERWISE.
— FROM QUDUM USING RATIONAL METHOD:
SITE_RUNOFF
EXISTING PROPOSED
INCREASE
Qto 92.7It/s 103It/s
Qn | Milt/s 122It/s
Qin | _158it/s 170It/s
10it/s
12It/s
12It/s
NON-WORSENING
— ON-SITE DETENTION TANK WITH SLOW
PIPES TO BE PROVIDED.
STORMWATER QUALITY
- THE SITE AREA IS BELOW 2500m?
— STORMATER HARVESTING TREATMENT
MEASURES TO BE IMPLEMENTED.
LEAK
— 101It OF STORAGE TO BE PROVIDED FOR
EVERY 1m? OF ROOF AREA. 80% OF ROOF
FLOW TO DRAIN THROUGH STORAGE TANK.
— STORED WATER TO BE USED FOR ON
IRRIGATION & EXTERNAL USE.
OPENING | TYPICAL OPENING
BETWEEN
DETENTION TANKS.
STAINLESS STEEL PLATE WITH A
(-x\ DETENTION TANK CONNECTION OPENING.
\_/ TYP. SECTION
0 2 4 6 8 10
Checked: Drg No. R
Pp mt: 150 © AT peg 5935 31 030-C5 {
SITE
A DETAIL UPDATED 25.11.21
Revision Description Date
Issue:
FOR APPROVAL
the written permission of SCG Consulting Engineers.
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
ABN 40 098 481 899
DEBUILD T/A,
Unit 1/11 Project Ave,
PS Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
Title:
CONCEPT STORMWATER
MANAGEMENT PLAN
29-27 TOOLAR St,
TEWANTIN
Date: Nov 21 Drawn SR Design SR
1:300 @ A3 : S Richardson A.