Original source · versioned page text
Bushfire Hazard Assessment and Management Plan
Original PDF page 37, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Bushfire Hazard Assessment and Management Plan
Performance Outcomes Acceptable Outcomes Compliance Assessment
Essential Community Infrastructure
PO4 Essential community AO4.1 Development involving essential community Not applicable
infrastructure is able to infrastructure is not located within a medium
The development is for a material change of use (MCU) for
function effectively during and or high bushfire hazard area.
a dwelling, not for essential community infrastructure.
immediately after bushfire
events. OR
AO4.2 Where located in a medium or high bushfire
hazard area, development involving essential
community infrastructure is designed to
function effectively during and after a bushfire
event in accordance with a Bushfire Hazard
Management Plan.
Editor’s Note— PSP8 Natural Hazards
provides guidance for assessing bushfire
hazard risk and preparing a bushfire hazard
management plan.
Hazardous Materials
PO5 Public safety and the AO5 Hazardous materials are not manufactured or Complies with PO5
environment are not stored in bulk in a bushfire hazard area.
No hazardous materials will be manufactured on site.
adversely affected by the
Hazardous materials on the premises will not be stored or
PR22116_BHAMP_178 Davis Rd, Cootharaba Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.