Original source · versioned page text
Bushfire Hazard Assessment and Management Plan
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Bushfire Hazard Assessment and Management Plan
7 References
Department of Infrastructure‚ Local Govenment and Planning (DILGP). (July 2017). State Planning
Policy.
DSDMIP. (2019). State Planning Policy State Interest Guidance Material - Natural Hazards, Risk and
Resilience - Bushfire, December 2019.
Leonard, J., & Opie, K. (2017, 2017). Estimating the potential bushfire hazard of vegetation patches
and corridors.
Leonard, J., Opie, K., Newnham, G., & Blanchi, R. (2014). A new methodology for State-wide mapping
of bushfire prone areas in Queensland.
Noosa Council (2022). "Noosa Plan 2020". Available at Current (t1cloud.com)
QFES. (2019). Bushfire Resilient Communities - Technical Reference Guide for the State Planning
Policy State Interest 'Natural Hazards, Risk and Resilience - Bushfire', October 2019.
Queensland Fire and Emergency Services. (2020). Catalyst Fire Management System.
Queensland Fire and Emergency Services (QFES). (2019). Bushfire Resilient Communities: Technical
Reference Guide for the State Planning Policy State Interest 'Natural Hazards, Risk and Resilience'
(October 2019).
Standards Australia. (2018). AS 3959-2018 Construction of buildings in bushfire-prone areas.
PR22116_BHAMP_178 Davis Rd, Cootharaba Page 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.