                           AGENDA


   Planning & Environment
     Committee Meeting


             Tuesday, 6 November 2018


                     commencing at 9.30am
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Brian Stockwell (Chair), Jess Glasgow, Ingrid Jackson, Tony Wellington




                       “Noosa Shire – different by nature”
Log in to download the original file

2018-11-06 Planning & Environment Committee Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 83 sections

Section 2

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA             6 NOVEMBER 2018


TABLE OF CONTENTS


ITEM                                                                     PAGE

ATTENDANCE & APOLOGIES                                                      -

PRESENTATIONS                                                               -

REPORTS FOR CONSIDERATION OF THE COMMITTEE                                  3

1      MCU17/0005 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
       ENTERTAINMENT AND DINING BUSINESS TYPE 2 RECREATION,
       AMUSEMENT & FITNESS (PAINTBALL), 113 MARARA ST COOROY                3

2      MCU18/0117 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
       USE FOR INDUSTRIAL BUSINESS TYPE 1, WAREHOUSE AND RETAIL
       BUSINESS TYPE 7, GARDEN CENTRE AT 124 EUMUNDI NOOSA ROAD,
       NOOSAVILLE                                                           5

3      MCU18/0084 REPRESENTATIONS TO DEVELOPMENT PERMIT FOR MATERIAL
       CHANGE OF USE FOR VISITOR ACCOMMODATION TYPE 3 (RURAL CABINS)
       AT 340 POMONA KIN KIN ROAD, PINBARREN                               14

4      MCU18/0009 REQUEST FOR NEGOTIATED DECISION NOTICE - PRELIMINARY
       APPROVAL FOR A MATERIAL CHANGE OF USE - MULTIPLE HOUSING - TYPE
       3 RETIREMENT AND SPECIAL NEEDS SITUATED AT 186 COOROY NOOSA
       ROAD, TEWANTIN                                                      25

5      MCU18 0102 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
       USE FOR VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL (122 BEDS) AT
       16 MARY STREET, NOOSAVILLE                                          40

6      ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT UPDATE -
       1ST QUARTER 2018-19                                                 75

CLOSED SESSION                                                        -




                                                                 Page 2 of 84

Section 3

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                               6 NOVEMBER 2018



REPORTS FOR CONSIDERATION OF THE COMMITTEE


1                        MCU17/0005 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
                         ENTERTAINMENT AND DINING BUSINESS TYPE 2 RECREATION, AMUSEMENT &
                         FITNESS (PAINTBALL), 113 MARARA ST COOROY
DOCUMENT INFORM AT ION




Author                              Development Planner, Lisa Pienaar
                                    Environment and Sustainable Development Department

Index                               ECM/Application/MCU17/0005

Attachments                         Nil



EXECUTIVE SUMMARY
Not Applicable
RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 6 November 2018 regarding Planning & Environment
Court Appeal No. D155 of 2018 and agree to defend the appeal.


REPORT
On 20 September 2018 Council at its Ordinary meeting, resolved to refuse an application for
Material Change of Use of Premises - Entertainment and Dining Business Type 2 – Recreation,
Amusement & Fitness (Paintball) at 113 Marara Street Cooroy for the following reasons:
1.                       The proposed development is an inconsistent use in the Rural Zone and the increase in
                         traffic on Marara Street from the proposed development is not contemplated by The Noosa
                         Plan.
2.                       The proposed development is contrary to the Transport, Roads and Drainage Code as the
                         development will compromise the capacity and safety of Marara Street.
3.                       The current condition of Marara Street is not capable of safely accommodating any
                         increase in traffic from the proposed development and a satisfactory solution has not been
                         identified to address the constrained sections of Marara Street given the current road
                         formation and environmental constraints.
4.                       A number of properly made submissions have been received raising valid grounds of
                         objection.
As a result of Council’s decision to refuse the application, the applicant has now lodged an
appeal to the Planning & Environment Court. The applicant seeks that the Court approve the
Development Application in its entirety with conditions.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.




                                                                                                      Page 3 of 84

Section 4

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 6 NOVEMBER 2018


Previous Council Consideration
Ordinary Meeting Minutes, 20 September 2018, Item 2, Page 7
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 September 2018 regarding Application No. MCU17/0005 for a
Development Application for Material Change of Use of Premises – Entertainment and Dining
Business Type 2 – Recreation, Amusement & Fitness (Paintball) situated at 113 Marara St,
Cooroy and:
A.      Refuse the application for the following reasons:
        1.     The proposed development is an inconsistent use in the Rural Zone and the increase
               in traffic on Marara Street from the proposed development is not contemplated by
               The Noosa Plan.
        2.     The proposed development is contrary to the Transport, Roads and Drainage Code
               as the development will compromise the capacity and safety of Marara Street.
        3.     The current condition of Marara Street is not capable of safely accommodating any
               increase in traffic from the proposed development and a satisfactory solution has not
               been identified to address the constrained sections of Marara Street given the current
               road formation and environmental constraints.
        4.     A number of properly made submissions have been received raising valid grounds of
               objection.
B.      Advise the applicant that an indoor play centre does require a further development
        approval to operate from the site and such a use would significantly impact on the safety of
        Marara Street were such a use to commence.
Finance & Risk
It is premature at this stage to provide advice on the likely prospects of the appeal. There will be
costs associated with defending the appeal.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes - Solicitor
Internal Consultation
Nil
Departments/Sections Consulted:


      Chief Executive Officer       Community Services                      Corporate Services
      Executive Officer             Director                                Director
      Executive Support             Community Development                   Financial Services
                                    Community Facilities                    ICT
                                    Libraries & Galleries                   Procurement & Fleet
                                    Local Laws                              Property
                                    Waste & Environmental Health            Revenue Services

      Executive Services        x   Environment & Sustainable Development   Infrastructure Services
      Director                      Director                                Director
      Community Engagement          Building & Plumbing Services            Asset Management
      Customer Service          x   Development Assessment                  Buildings and Facilities
      Governance                    Economic Development                    Civil Operations
      People and Culture            Environmental Services                  Disaster Management
                                    Strategic Land Use Planning             Infrastructure Planning,
                                                                            Design and Delivery




                                                                                          Page 4 of 84

Section 5

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          6 NOVEMBER 2018


2                        MCU18/0117 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
                         FOR INDUSTRIAL BUSINESS TYPE 1, WAREHOUSE AND RETAIL BUSINESS TYPE 7,
                         GARDEN CENTRE AT 124 EUMUNDI NOOSA ROAD, NOOSAVILLE
DOCUMENT INFORM AT ION




Author                           Development Planner, Glen Conforti
                                 Environment and Sustainable Development Department

Index                            ECM / Application / MCU18/0117

Attachments                      Nil



         APPLICATION DETAILS

         Applicant                           Fiddlewood Pty Ltd ATF Fiddlewood Unit Trust TA Noosa Pots &
                                             Plants

         Proposal                            Material Change of Use - Industrial Business - Type 1
                                             Warehouse, Retail Business - Type 7 Garden Centre

         Properly Made Date                  16 July 2018

         Information Request Date            N/A

         Information Response Date           N/A

         Decision Due Date                   15 November 2018

         Number of Submissions               1

         PROPERTY DETAILS

         Property Address                    124 Eumundi Noosa Rd Noosaville Qld 4566

         RP Description                      Lot 3 RP 173877

         Land Area                           1214m²

         Existing Use of Land                Noosa Pots and Plants

         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint

         Locality                            Noosaville

         Zone                                Industry

         Overlays                            Natural Hazards Overlay – Low Potential Acid Sulfate Soils

         Assessment Type                     Impact




                                                                                                Page 5 of 84

Section 6

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  6 NOVEMBER 2018


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 6 November 2018 regarding Application No. MCU18/0117 for a
Development Permit for Material Change of Use for Industrial Business, Type 1 Warehouse and
Retail Business, Type 7 Garden Centre situated at 124 Eumundi Noosa Rd Noosaville Qld and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
     Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed in the
           following table unless otherwise amended by these conditions.
      Plan No.   Rev.    Plan/Document Name                                       Date
      A.01               Existing Floor Plan, prepared by Zest Building Design    Plot date 29/08/2018
     Nature and Extent of Approved Use
     3.    The approved Use Area for the Retail Business Type 7 – Garden Centre is 182m².
           This total includes 20% Use Area permitted as part of the industrial business.
     4.    The development must not include a café.
     Performance Bond
     5.    Security in the form of a cash bond or trading bank guarantee to the sum of $1500
           must be submitted to Council, to secure performance of all conditions of this
           approval, within 20 days of this approval taking effect. The cash bond or trading bank
           guarantee will be returned on performance of the conditions of approval less any
           costs incurred by Council in respect of enforcing performance of this permit. Council
           reserves the right to call upon the bond or guaranteed sum to effect compliance with
           conditions.
     Landscaping
     6.    Additional plantings must be provided to the 2 gardens located on each side of the
           driveway to the Eumundi Noosa Road. A minimum of 1 feature tree must be planted
           in the north east corner garden and a minimum of 3 feature trees planted in the south
           west garden. The plantings must be in accordance with Council’s Planning Scheme
           Policy PSP3 Landscaping Plants and Guidelines. The feature trees must be
           Acronychia imperforata and have a minimum pot size of 45 litres.
     Car parking
     7.    A minimum of 10 car spaces must be provided on site in accordance with
           AS/NZS2890.1:2004.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with the
     Planning Scheme:
     1.    The garden centre is consistent with the Overall Outcomes of the Noosaville Locality
           Code as it is a retail use which is compatible with the surrounding uses and generally
           unsuited to the business centres.
     2.    The proposal will operate in association with the industrial Warehouse with no
           negative impacts on the adjoining uses.
C.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


                                                                                        Page 6 of 84

Section 7

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             6 NOVEMBER 2018


REPORT
1.   PROPOSAL
The proposal seeks approval for Industrial Business Type 1 – Warehouse and Retail Business
Type 7 - Garden centre which is currently operating from the site. The total use area proposed is
427m² consisting of 245m² for the warehouse component and 182m² for the garden centre, which
includes some outdoor display areas. The business is located in an existing building with no
external alterations undertaken or proposed. Figure 1 below shows the floor plan and Figure 2
shows the garden centre display area.




                                        Figure 1 – Floor Plan




                                Figure 2 – Garden centre display area

The applicant advises:
     Noosa Pots and Plants is a wholesale supplier of landscape products including plants, pots
     and planters, décor and garden supplies. Noosa Pots and Plants are an exclusive
     wholesale sales agent and distributor of Bombora pots.

                                                                                   Page 7 of 84

Section 8

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


     Typically, one staff member works within the warehouse whilst two staff members are off-
     site undertaking landscape projects and design consultations.
     Noosa Pots and Plants is a supplier to and works in partnership with local landscape
     architects and interior designers.
The application is before Council as the garden centre use is inconsistent in the Industry zone.
2.   SITE DETAILS
2.1. Background
Over the years the site has been used as an ice works, seafood distributors with retail sales and
more recently a paint distribution centre with retail sales.
The subject business has been operating for approximately 4 months from the premises. A
complaint was received regarding the use in the Industry zone. Council issued an Advisory Letter
regarding the business not complying with the definition of an Industrial Business resulting in this
application to Council. The subject garden centre use in the Industry zone is addressed in
Section 3.3 of this report.
2.2. Site Description
The 1214m² rectangular shaped lot has frontage to Eumundi Noosa Road and Traders Lane. The
lot has been filled towards the Eumundi Noosa Road where most of the carparking is located.
The building is setback behind this carpark. The lot then steps down towards the Traders Lane
frontage. The building is 2 storeys but presents as a single storey building to Eumundi Noosa
Road. Figures 3 and 4 below show the building from each frontage.




                               Figure 3 – View from Eumundi Noosa Rd




                                  Figure 4 – View from Traders Lane

2.3. Surrounding Land Uses
Adjoining the south is a car sales yard and to the north is a marine sales and service centre. In
the surrounding area is a bicycle shop, tyre and mechanical centre and further to the north is the
Goodchap Street medical centre and university complex.


                                                                                      Page 8 of 84

Section 9

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
 State Planning Policy;
 South East Queensland Regional Plan;
 Planning Regulation 2017;
 The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the
provisions are relevant to the development.
Locality Provisions
The subject site is located in the Noosaville Locality and is zoned Industry. The proposed
warehouse use is a consistent use whilst the garden centre use is inconsistent within the zone.
The warehouse use generally complies with the provisions of the Noosaville Locality Code and
other relevant codes and raises no concerns.
In terms of the garden centre the following Overall Outcomes of the Noosaville Locality Code are
relevant:
11.7.2      a)    New uses and works are located, designed and managed to—
                  i   be compatible with other uses and works;
                  ii  maintain the safety of people and works;
                  iii  avoid significant adverse impacts on the amenity enjoyed by users of
                       other premises or surrounding area, including acoustic and visual
                       qualities; and
                  iv   avoid significant adverse effects on the natural environment, including
                       native habitat removal, fragmentation and attrition;
and specifically for the Industry zone:
            vv)   For the Industry Zone—land in this zone—
                  i     consists of the Noosaville Industrial Estate, being Noosa’s principal
                        industrial centre;
                  ii    is protected for industrial functions including Industrial business Type 2 to
                        the exclusion of incompatible uses including Residential Uses,
                        Community Uses, Commercial business and most sport and recreation
                        uses and Retail business uses;
                  iii   has high accessibility to arterial roads and the Bruce Highway;

                                                                                       Page 9 of 84

Section 10

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


                 iv    does not accommodate uses that would harm the environment through
                       excessive noise, odour, dust, or other waste;
                 v     is developed in a fashion that does not detract from the character of its
                       locality or impact on the major road network;
                 vi    provides important industries and service-related businesses to the whole
                       of Noosa, but particularly the coastal area and the north-east area of the
                       former Maroochy Shire; and
                 vii   provides for a high level of runoff water quality to Eenie Creek and Lake
                       Doonella;
The site adjoins other retail uses such as a vehicle sales yard and a marine sales and service
use where the retail sales area is adjacent to the garden centre. Nearby are a bicycle sales and
service centre and a tyre and vehicle repair use. Given the nature of these adjoining and nearby
uses, the garden centre is considered compatible with and would not cause any impacts that
would negatively affect these neighbouring uses nor cause any reverse amenity issues.
In terms of the greater industrial area, the Overall Outcomes seek to protect industry land for
industrial purposes but allows for some compatible retail uses within the zone under Overall
Outcome vv) ii which states industrial land:
 ‘is protected for industrial functions including Industrial business Type 2 to the exclusion of
incompatible uses including Residential Uses, Community Uses, Commercial business and most
sport and recreation uses and Retail business uses.’
It is considered a garden centre is generally unsuited to the business commercial zones because
of the nature of goods sold such as fertilisers, potting mix and the larger items such as pots and
garden products/ornaments and plants requiring natural light and irrigation.
It is also pertinent that the garden centre is not a standalone business but is associated with the
industrial warehouse and distribution business which services the Noosa region. Figures 5 and 6
below shows the pot storage and the dispatch area of the industrial business.




                                  Figure 5 – View of the warehouse




                                                                                    Page 10 of 84

Section 11

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018




                                       Figure 6 – Dispatch area

Although the use areas for the two businesses are split approximately 60% industrial business
and 40% garden centre, the Industrial use remains economically the primary use and the garden
centre is associated with and an adjunct to the primary use.
It should also be noted the large scale items for sale makes it difficult for the business to comply
with the 20% retail area permitted under the Planning Scheme for an industrial business.
The applicant has provided the following grounds for approval:
     The report demonstrates the proposed industrial warehouse and garden centre represents
     an appropriate outcome that is consistent with the strategic framework and local planning
     provisions. The proposal is an effective reuse of an existing industrial/commercial
     development.
     The proposed industrial warehouse (Noosa Pots and Plants) can be supported on a
     number of grounds which include:
         The development is consistent with the Noosa Plan 2017 Strategic Framework and
           the overall intent for the Industrial Zone;
         The proposal is consistent with the nature, scale and type of uses envisaged in the
           location.
         The proposed industrial warehouse and garden centre is located on a site that is
           appropriate for the use and is compatible with surrounding uses.
         The site is well located to existing pedestrian, cycle and public transport routes;
         Negligible vehicular traffic will be generated as a result of the proposed use care of
           the nature of the use and clientele;
         Sufficient car parking is able to be provided on-site; and
         No new buildings or alterations to the external built form are proposed on-site.
Land Use & Works Provisions
The application has been assessed against applicable codes. The pertinent issues arising out of
the assessment against the codes are discussed below:



                                                                                     Page 11 of 84

Section 12

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       6 NOVEMBER 2018


Carparking
The quantity of car parking required is determined by the extent of use area. Table 1 shows the
use area of each use on site.
Table 1 – Use Areas
 Use                                                  Use Area
 Warehouse                                            245m²
 Garden Centre                                        182m²
                                                      427m² total use area
Table 2 provides an analysis of the car parking for the site.
Table 2 - Carparking
 Use               Planning Scheme requirement (use area)         Number of car spaces         Complies
                                                                  provided by the
                                                                  development
 Warehouse         1 space per 50m²                   5                                        
 Garden centre     1 space per 60m² with a            5                                        
                   minimum of 5 spaces provided
 Total required                                       10          14                           
The Planning Scheme requires a total of 10 spaces. The development complies with this
requirement providing 14 spaces, being 10 spaces located near the Eumundi Noosa Road
frontage and 2 covered tandem spaces (4 spaces) near the Traders Lane frontage.
Landscaping
The proposal does not meet the 15% minimum landscaping provision required by the Planning
Scheme for the Industry zone. Notwithstanding this is a reuse of an existing premises, the
existing 59m² of landscape gardens located each side of the driveway fronting Eumundi Noosa
Road provides a softening to the car park area and the building. The applicant proposes to
enhance these 2 gardens by including additional plantings consisting of Acronychia imperforata
(Fraser Island Apple) and some understorey species. It is considered the existing landscaping to
the front of the site is sufficient and with additional plantings would improve the streetscape.

4.     CONSULTATION
4.1. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. One properly made submission was received. The following table provides a summary and
assessment of the issues raised by the submitter.

 Matters Raised                                   Comments
 The proposal is not consistent with Overall      The Planning Scheme seeks to exclude incompatible
 Outcome (vv), Specific Outcomes O188 and         uses from the Industry zone and excludes most retail
 O189, part 3.1.3 (e) of the DEO and part 1.7     uses but not all retail uses. It is considered the proposal
 of the strategic framework.                      is compatible with the surrounding uses and generally
                                                  unsuitable for commercial/business areas.
 The applicant has not provided sufficient        The applicant has addressed the relevant provisions of
 planning grounds to warrant approval despite     the Planning Scheme and it is considered there are
 the conflict with the planning scheme.           sufficient grounds to recommend approval of the
                                                  application despite the conflict.
 There is a need to protect industrial land for   The Planning Scheme does not exclude all retail uses
 industrial purposes                              from the Industry zone and allows for some uses not
                                                  suited to other zones. It is considered the garden centre
                                                  use as a secondary use to the warehouse use meets
                                                  the objectives of the Planning Scheme.



                                                                                              Page 12 of 84

Section 13

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


5.     CONCLUSION & REASONS FOR DECISION
The proposal is for a pot and plant warehouse and garden centre within an existing building. The
Industrial Business Type 1 – Warehouse is a consistent use in the zone and meets the relevant
provisions of the Planning Scheme.
The Planning Scheme does not exclude all retail uses from the Industry zone but allows some
retail uses which are compatible with industrial businesses and not suited to the business zones.
The subject Retail Business Type 7 – Garden Centre is considered to be compatible with the
surrounding uses and will not create adverse impacts or limit business potential of the
surrounding premises. Given the nature of the products sold it is considered to be suited to the
subject site.
The application is recommended for approval subject to conditions.
The following are sufficient grounds to justify the decision despite the conflict with the Planning
Scheme:
1.     The garden centre is consistent with the Overall Outcomes of the Noosaville Locality Code
       as it is a retail use which is compatible with the surrounding uses and generally unsuited to
       the business centres.
2.     The proposal will operate in association with the industrial Warehouse with no negative
       impacts on the adjoining uses.

Departments/Sections Consulted:
   Chief Executive Officer     X   Community Services                      Corporate Services
     Executive Officer             Community Development                   Financial Services
     Executive Support             Community Facilities                    ICT
                                   Libraries & Galleries                   Procurement & Fleet
                                   Local Laws                              Property
                              X    Waste & Environmental Health            Revenue Services

     Executive Services       X    Environment & Sustainable Development   Infrastructure Services
     Community Engagement          Building & Plumbing Services            Asset Management
     Customer Service         X    Development Assessment                  Buildings and Facilities
     Governance                    Economic Development                    Civil Operations
     People and Culture            Environmental Services                  Disaster Management
                                   Strategic Land Use Planning             Infrastructure Planning,
                                                                           Design and Delivery




                                                                                        Page 13 of 84

Section 14

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                              6 NOVEMBER 2018


3                        MCU18/0084 REPRESENTATIONS TO DEVELOPMENT PERMIT FOR MATERIAL
                         CHANGE OF USE FOR VISITOR ACCOMMODATION TYPE 3 (RURAL CABINS) AT 340
                         POMONA KIN KIN ROAD, PINBARREN
DOCUMENT INFORM AT ION




Author                              Development Planner, Glen Conforti
                                    Environment and Sustainable Development Dept

Index                               ECM / Application / MCU18/0084

Attachments                         1.    Proposal Plans


         APPLICATION DETAILS
         Applicant                                Sarah Keating
                                                  Simon Marsh
         Proposal                                 Representations to the Development Permit for Material Change
                                                  of Use - Visitor Accommodation Type 3 Rural Cabins
         Representations Made Date                9 October 2018
         Decision Due Date                        15 November 2018
         Number of Submissions                    1 to original application
         PROPERTY DETAILS
         Property Address                         340 Pomona Kin Kin Rd Pinbarren Qld 4568
         RP Description                           Lot 26 M 37911
         Land Area                                15.68ha
         Existing Use of Land                     Dwelling House
         STATUTORY DETAILS
         SEQRP Designation                        Regional Landscape and Rural Production
         Locality                                 Mary River Catchment
         Zone                                     Rural
         Overlays                                 Biodiversity Overlay – Riparian buffer
                                                  Natural Hazards Overlay – Bushfire hazard
                                                  Natural Resources Overlay – Agricultural land conservation area
         Assessment Type                          Impact
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 September 2018 regarding representations made to the Decision
Notice (MCU18/0084) for a Material Change of Use - Visitor Accommodation Type 3 Rural
(Cabins) situated at 340 Pomona Kin Kin Rd, Pinbarren and:
A.                       Agree to change Condition 2 to read as follows:
                         Approved Plans
                         2.   Development undertaken in accordance with this approval must generally comply
                              with the approved plans of development. The approved plans are listed in the
                              following table unless otherwise amended by these conditions.


                                                                                                   Page 14 of 84

Section 15

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


       Plan No.   Rev.   Plan/Document Name                                                 Date
       A1         D      Site Plan, prepared by Jim Morehead Building Design and Drafting   04.10.18
       A2         C      Site Plan – Aerial View, prepared by Jim Morehead Building
                         design and Drafting                                                04.10.18
       A3         C      Part Site Plan, prepared by Jim Morehead Building design and
                         Drafting                                                           04.10.18
                         Floor Plan, provided by Cabin Warehouse
                         Elevations A & B, provided by Cabin Warehouse
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

REPORT
1.   PROPOSAL
Council approved an application for a Development Permit for Material Change of Use for visitor
accommodation on 20 September 2018.
The proposal consists of 6 two bedroom cabins to be introduced in 2 stages. The cabins
comprise a gross floor area of slightly less than 38m², a saw tooth roof form, a covered front
veranda and insulated sandwich panel walls.
One properly made submission was received and during the Decision Period, a petition opposing
the development was received.
The applicant’s representations to the Decision Notice primarily relate to the size of the cabins
and the location of the car park.
2.   SITE DETAILS
2.1. Site Description
The lot is generally rectangular in shape with the western 1.2ha (approx.) of the property severed
by Pomona Kin Kin Road as shown in Figure 3 below. Both sides of the Pomona Kin Kin Road
are low lying. A seasonal drainage line is centrally located longitudinally through the lot. The
southern boundary has frontage to the south end of Camphor Road. The lot slopes up from
Pomona Kin Kin Road to the eastern boundary. The dwelling house and associated sheds are
located behind a stand of native vegetation toward the centre of the lot. The dwelling house and
sheds are accessed by a sealed driveway from the Pomona Kin Kin Road. Figures 1 and 2 below
show an aerial view and locality plan of the lot.




                                       Figure 1 – Aerial Plan.

                                                                                     Page 15 of 84

Section 16

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018




                                      Figure 2 – Locality Plan

3.   ASSESSMENT
An assessment of the submitted representations is provided below.
Cabins
Applicant’s Request
The applicant seeks to increase the size of the cabins from 38m² to 57m². The applicant provides
the following justification:
Since the Decision Notice was issued, we have also noticed that the proposed cabin type was
amended inadvertently during the decision stage. As outlined in the applicant’s response to the
Council’s information request, the applicant intends to build only one cabin type with a floor area
of 57m2 which is more suited to the target family market and is compliant with current disability
standards. The floor plans and elevations for this cabin type are also submitted with this letter
and it is important to note that the elevation for this cabin type was included on the site notices
erected on site during the public notification stage.
Assessment
The cabins were approved, in part, because of their small scale and the unlikelihood that the
cabins would negatively impact on, constrain or alienate agricultural pursuits suited to the
property.
Figures 3 and 4 below show the proposed cabins.




                                                                                    Page 16 of 84

Section 17

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018




                                       Figure 3 – Floor Plan




                                      Figure 4 – 3D Elevations

The cabins approved were less than 1% (0.15%) of the lot area. Increasing the size to 57m²
would result in the cabins still occupying less than 1% (0.21%) of the lot and are consistent with
the maximum size for cabins permitted by The Noosa Plan of 100m².
The cabins are the same width as approved but are longer which provides for slightly larger
bedrooms (in length) and a more spacious living area to better cater for the applicant’s target
market of families and would also comply with disability access regulations.
The built form is similar to that approved, in that it has a saw tooth roof form and would be
constructed with insulated panels.

                                                                                   Page 17 of 84

Section 18

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 6 NOVEMBER 2018


It is considered the larger cabins are still small scale and would not cause any additional potential
impacts to that of the smaller cabins. The request to increase the size of the cabins is
recommended to be supported.
It is also pertinent to note the elevations of the larger cabins were advertised on the site notice as
part of public notification, which means the community have had an opportunity to lodge a
submission.
Car Park
Applicant’s Request
The applicant seeks to move the car park approximately 10m to the south and change its shape
to run east west longitudinally to further reduce any potential impacts on the adjoining neighbour.
Figure 5 below shows the location of the approved car parking and the amended location.




                               Figure 5 – Approved and amended location

Assessment
The new location of the car park raises no concern as it provides greater separation to the
neighbour’s property. Furthermore its location does not adversely affect the engineering
standards required for the car park construction.
Landscaping
Applicant’s Request
The applicant has amended the site plans to clearly indicate the landscaping required as part of
Stage 1 pursuant to Condition 9 of the Decision Notice.
Assessment
The amended plans clearly show the landscaping required by Condition 9. The amendment
raises no concerns.
Condition 2 – Approved Plans of Development
As a result of the request, only one Condition is required to be changed to reflect amended plans
of the cabins, landscaping and site layout. The changes to Condition 2 is provided in track
changes below.


                                                                                      Page 18 of 84

Section 19

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       6 NOVEMBER 2018


2.     Development undertaken in accordance with this approval must generally comply with the
       approved plans of development. The approved plans are listed in the following table unless
       otherwise amended by these conditions.
         Plan No.        Rev.   Plan/Document Name                                    Date
         A1              CD     Site Plan, prepared by Jim Morehead Building Design   06/08/1804.10.18
                                and Drafting as annotated by Council
         A2              BC     Site Plan – Aerial View, prepared by Jim Morehead     06/08/18
                                Building design and Drafting and as annotated by      04.10.18
                                Council
         A3              BC     Part Site Plan, prepared by Jim Morehead Building     06/08/18
                                design and Drafting and as annotated by Council       04.10.18
         A4              A      2 Bedroom Cabin – Floor Plan & Elevations, prepared   01/05/18
                                by Jim Morehead Building Design and Drafting
         A5              A      2 Bedroom Cabin, prepared by Jim Morehead Building    01/05/18
                                Design and Drafting
                                Floor Plan, provided by Cabin Warehouse
                                Elevations A & B, provided by Cain Warehouse

4.     CONCLUSION & REASONS FOR DECISION
The representations seek to increase the size of the cabins to 57m², relocate the car park and
provide clarity on the plans for the Stage 1 landscaping. It is considered the increase to the size
of the cabins would not cause any additional impacts to the neighbouring property when
compared to that of the smaller cabins nor inhibit the use of the lot for agricultural pursuits. The
relocation of the car park reduces potential impacts on the neighbouring property. The request for
a negotiated Decision Notice is recommended to be supported.
Departments/Sections Consulted:

     Chief Executive Officer         Community Services                         Corporate Services
     Executive Officer               Community Development                      Financial Services
     Executive Support               Community Facilities                       ICT
                                     Libraries & Galleries                      Procurement & Fleet
                                     Local Laws                                 Property
                                     Waste & Environmental Health               Revenue Services

     Executive Services          X   Environment & Sustainable Development      Infrastructure Services
     Community Engagement            Building & Plumbing Services               Asset Management
     Customer Service            X   Development Assessment                     Buildings and Facilities
     Governance                      Economic Development                       Civil Operations
     People and Culture              Environmental Services                     Disaster Management
                                     Strategic Land Use Planning                Infrastructure Planning,
                                                                                Design and Delivery




                                                                                             Page 19 of 84

Section 20

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018


                                                                      Attachment 1




                                                      Page 20 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         6 NOVEMBER 2018

                                                                                                                                                 Attachment 1
                                        EXISTING                                                                                                   ttachment
                                        SEALED        LAND APPLICATION AREA                LAND APPLICATION AREA
                                       DRIVEWAY ——_ REFER ASI REPORT 18006A]    GRAVEL — REFER ASI REPORT 180061(A)
                                                        -l                      PARKING AREA
                              3        |                 | a i               J               dL.      ey.                    7          .-.—*
                              f       a eh                                                        &                             62220
                            Ag]     LINE OF TREES TO BE _. Bex ieee NE pie oe MM sp lee                    —eyisTING SHED                               p
                          hep       PLANTED AS PART OF   aR. 4Oe ro                         GY            os
                  Sve             OS                         ote PBo POET SO 5                    O                                                     |
                  <t    J                                 =     '              ay              Net
                 a    f           (LINE OF TREES TO BE          Do A el Oe!
                 =>   ©           { PLANTED AS PART OF      _     BP Sap               f io)                                                            |
                 <=   le        Dw        STAGE TU                   SE sacee                                              EXISTING                     |
                 —=                       Cc
                =                                                               he                                                                    S/5
                 =    ip               wee”                                     \                                            DAM                        l
                < _|®                APPROX                      STAGE 1                                                                              sls
                S Sig               WATERWAY                                            EXISTING                   =                                  Se
                = &.                                                                 A    sHep                     =
                LS 21                                                                                             &                                     |
               &    &                                                                         & (\)        ISTING
                    i®                                                           Sy                        “                                            |
                    1Q                                                  EXISTING                                                                        .
                    PB                                                 RESIDENCE                                     APPROX.                            |
                  IC                                                                                        < | WATERWAY                                |
                  se                                                              '              ae                                                    |
                                         rE |                                      682600
                                                       CAMPHOR ROAD
                           NOTE: ADDITIONAL PLANTING TO BE PROVIEDED BETWEEN AND      CC} PROPOSED BUSHES FOR SCREENING
                           AROUND PROPOSED CABINS TO PROVIDE SCREENING AND PRIVACY.   & PROPOSED TREES FOR SCREENING
                           APPROPRIATE NATIVE SPECIES WILL BE PROPOSED IN
                            CONSULTATION WITH COUNCIL AND DISTRICT LANDCARE GROUP.

             SITE PLAN                                 N
             SCALE 1:7500
             PROPERTY DESCRIPTION              Ww              E                   me  SITE PLAN                                                    Tocca fond
      a                                                                            proxct. PROPOSED DEVELOPMENT
             LOT 26 ON M37911                                                      cen, S.KEATING                                                   J
             AREA : 26.99 hA                                                       avmess. 340 POMONA KIN KIN ROAD
                                                        s                              PINBARREN
                                                                                  PMBchead wulang coon dating Pah WP.» valde   reall fie vvo esedoneaetb| 180404 AT [D |
                                                                                                                          4            —

                                                                                               Page 20 of 84

Section 21

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 21 of 84

p8 40 12 abed

                                ec —— eta              Bg. wie # ore Barina = PEoYOe
                 i        wel |           Lolita                           eat
                                                                       NaadaVvaN"id
                                                         QVOaND NI VNOWOd OFe Ser
 va]   nines [6 |                                                       ONILVAYS  >
scar] ear sve |                                           INAWdO1SAR0 GASOdONd
[_-|}-———_ 9                                                 MSIA TVIN3V -NW1d IS!
                                                                                                           P           PE          Fe       Oe             my
                S                                                                       ;                             €                                      x
            sh\                            »     s.                  a         a,     <3              -             4 e,                  ate, bf    a    —"
                                                                            =                                         .                                     od
                                                       ;                                   Va                        .
       as      A=            4              M     &                               5                          > <          as                        <i     ba
      ci        Ge! Se            ee              Ae Paes               LSS                  nl         SE           Sinan                     a
    :                                                                a      ee             oe                       =      ; a ——                  ——
  NMOS   EP tree    cere cere                                       | Be                  1.   oe      aS         sie         PSs       Pe ee
 he of                                                          re               =                   ii      a            a as                   a         ee
      j   -                                                 -        bad      a eel   ea                                                                 eS
     f  L                                                     4        Site            J                                                              ii
                                       :                    &           >     x    4    bs                                                           iit       i
  )   me                              y                                   i   ,                                                                     |  iw]     ;
  oe                         Re,                                          OF al         ;                                                            B
  Sr  bik    2    _    P     . 4                          5	1	1	1	24	9	1567	1271	4	2	22	5
5	1	1	1	24	10	1678	1248	60	63	34	i
5	1	1	1	24	11	2385	1252	8	8	18	=
5	1	1	1	24	12	2799	1240	4	38	3	}
5	1	1	1	24	13	2820	1252	34	41	76	=
5	1	1	1	24	14	2879	1255	8	16	0	iz
4	1	1	1	25	0	503	1273	2376	31	-1	
5	1	1	1	25	1	503	1277	17	13	3	a
5	1	1	1	25	2	1423	1273	40	31	41	we
5	1	1	1	25	3	1577	1283	9	7	53	.
5	1	1	1	25	4	2876	1276	3	7	42	Ma
4	1	1	1	26	0	2818	1298	32	18	-1	
5	1	1	1	26	1	2818	1298	32	18	48	So
4	1	1	1	27	0	1211	1283	1634	97	-1	
5	1	1	1	27	1	1211	1316	24	35	34	el
5	1	1	1	27	2	1518	1316	13	31	10	Fe
5	1	1	1	27	3	1798	1327	3	2	27	:
5	1	1	1	27	4	2788	1283	12	97	81	|
5	1	1	1	27	5	2814	1321	31	18	93	>
4	1	1	1	28	0	1155	1349	1686	55	-1	
5	1	1	1	28	1	1155	1350	73	54	5	ant
5	1	1	1	28	2	1445	1349	52	50	20	Ps
5	1	1	1	28	3	2128	1360	20	19	14	é
5	1	1	1	28	4	2243	1372	3	2	0	}
5	1	1	1	28	5	2772	1382	19	16	14	a
5	1	1	1	28	6	2808	1371	33	27	52	>
4	1	1	1	29	0	998	1398	1897	40	-1	
5	1	1	1	29	1	998	1406	27	12	40	oe
5	1	1	1	29	2	1228	1406	7	13	0	F
5	1	1	1	29	3	1349	1407	61	31	8	oe
5	1	1	1	29	4	2077	1423	20	8	25	rr
5	1	1	1	29	5	2208	1425	11	10	0	-
5	1	1	1	29	6	2785	1402	53	23	20	a
5	1	1	1	29	7	2880	1401	15	32	0	es
4	1	1	1	30	0	790	1436	2168	45	-1	
5	1	1	1	30	1	790	1464	6	6	0

                                    r          F      ,               a                           .   f                                            ime     As  |
                                    ?                                2                                                                              2 ie
                                             es                      PY pee                           :                                             2D
                                                                    ti                                                                              =
        :                                                                  L_ I           it   a                                                4 oO
     Z         ’                                                 A                          S     :          F                      :         y ,  dha!
           ee                                                              i.                 Yarra.                 este                     4
                  J                     :                          nh       cd    .   ee                    *         x          -       i     pay!
           #4                          oes ee                           ee                                        a               Pe      OF:
                    a,                 p                          of                                                                      1
            *      —                  :                   Po            ;    ot                                                 a        jj
                                    ee ae           ae as             ;      soca                             “                         di
       :                                                  fg
   oe                       me                               _—
 Laer                     \ aa                      ™          ~   és     ap

                                                     8102 YUSAEINSAON 9                     VONADV DSNILASW SSLLININOD LNSINNOYIANS 8                                DSNINNV Id

Section 22

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 22 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   6 NOVEMBER 2018

                                                                                                                    L

                                       3                                                                                                 5

             TYPE A         TYPE A              TYPE A                         LA                TYPE A           &
                    l               i                  l                                                l                       TYPE A
                                                                                            aS                                          I 4000L
                                                                                     =e)                                      p             SAT
                                                                                        -   4     PATHWAY     a
                    S|                                                  Or
                          20.7m                                  ie                 30.6m            19M             23M
                                    STAGE 1                       \     AAA                           STAGE 2

                                                                                     PART SITE PLAN
                                                                                     SCALE 1:500
                                                                                     TYPE A 2 BEDROOM CABIN

                 N

                                                                              ime PART SITE PLAN                                             cd
         W               E                                                    proxcr: PROPOSED DEVELOPMENT
                                                                              aem $.KEATING
                                                                              asoeess. 340 POMONA KIN KIN ROAD                              bec ree —— ae
                                                                                  PINBARREN
                 s
                                                                             | FNOCNEAA | building design + drafting _| Ba Eo pal eee Amen eectonk.

                                                                                         Page 22 of 84

Section 23

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 23 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                           6 NOVEMBER 2018

                                                                                                                                                                                                          ————e
                        |                                                                                                                                                                                 i
                         |                                         gop                                 ae                                                     |                  ws                       _————                  |
                         |                    a                             |                           b              ——               |  Bs
                       4                        |                     |     |      i | |_|       |             |      &      |I-   |      |       |                             |       le
                         |                      oh                     |             728                       |             LL}             |                                     g|                                        |
                       — ui                                                                  =                   waists                 hh         eae ceaatal                                                               ||
                       !             S          | =                   |            _|    |__ soo)              |      J         902     |                     |                 |                                                .
                         |             |       i}                     I             |                |                |                      |                |
                                                         2225              ds         3250                               3250                |              3250
                       |                                                                                          A    elevation                                                                          |
                       |                                                                                                                                                                                  |                     |

                       |                     | 8)      |    |            |           Z         |  g          ati                  |             eT |                            3      |     3            |
                       “HY                 8    g|     |                                                        | Hj                            |    i} | :                     2            2                                   ,
                      |                      |                          |                      |                                                             5 |                                                               IL
                      |                                |                                                                                                | 600 |                               7           -—                     6
                                                                       3250               |               3250               |               3250                         2225                                                  |
                      |                                                                                  _3      elevation                                                                                                       -
                                                                                                                                                                                                          |                 |
                       |                                                                                                                                                                                  |
                       |                                                                                                                                                                                  Py
                       eo                                                     lll

                                                                                                                                    Page 23 of 84

Section 24

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 24 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            6 NOVEMBER 2018

                |                                                                            “                                                                          |
                 |                                    pep,                                                                                                              |
                ‘                    pH                                            tS
                +)            eI      a                                           J             € P.deed. de                        pirat Ea
                  |                   :                Tenses                       Peele                                             Tl
                (|             |     |                 |                                     |                                               |
                               |                       |                                      IX                                      |:   :
                                                                                             {| —~                                    We
                  |                                       =.                                 Vettel                                   ye         |
                D |                                      ' 7                                                |    |                               |                       D
                          los                           Ws                                                  =         ___                   46                          i
                ;                    |                 |   =                                                 7                         2  |      |                       I
                               |                         es                                                                           ll.        |
                  |            ;                       |                                                                               =   gl    |
                4|                                         -                                                |                         -.%                                ,
                               |                       |   ‘                                                ||                         |
                |             | Ns reer     oer       dS          este                              tetra!                             ___ 4 4
                7                           2225       —— 30                                 3250                       3250                                             Fr
                                                                                             ee    :st=<‘< CS;7S; Sé<i‘<; SS                                             f
                5|                                                                      floor plan                                                                       :
                 |                                                                            34                                                                        |
                ‘                                                                                                                                                       | a
                0                                                    a                              —                         -       L———_i # £°&}&}& &4#£§&§           ‘if
             |  ee ee              T    i    T   e   TT TTT ES Ra cs:                                                                   orn   Ee   ET

                                                                                                   Page 24 of 84

Section 25

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         6 NOVEMBER 2018


4                        MCU18/0009 REQUEST FOR NEGOTIATED DECISION NOTICE - PRELIMINARY
                         APPROVAL FOR A MATERIAL CHANGE OF USE - MULTIPLE HOUSING - TYPE 3
                         RETIREMENT AND SPECIAL NEEDS SITUATED AT 186 COOROY NOOSA ROAD,
                         TEWANTIN
DOCUMENT INFORM AT ION




Author                           Coordinator Planning, Patrick Murphy
                                 Environment and Sustainable Development Department

Index                            ECM/Application/MCU18/0009

Attachments                      1.   Proposal Plans


         APPLICATION DETAILS
         Applicant                           Noosacare Inc
         Proposal                            Material Change of Use - Multiple Housing –Type 3 Retirement
                                             & Special Needs
         Representations Made                2 October 2018
         Date
         Decision Due Date                   30 October 2018
         Number of Submissions for           68 letters of support
         original application


         PROPERTY DETAILS
         Property Address                    186 Cooroy Noosa Rd Tewantin Qld 4565
         RP Description                      Lot 2 RP 177554
         Land Area                           4.4 hectares
         Existing Use of Land                Multiple Housing - Type 3 Retirement and Special Needs


         STATUTORY DETAILS
         SEQRP Designation                   Urban Footprint
         Locality                            Tewantin and Doonan
         Zone                                Community Services
         Overlays                            Biodiversity Overlay: Environment Protection Area
                                             Natural Hazard Overlay: Bushfire Hazard and Acid Sulfate
                                             Soils
         Assessment Type                     Representations made to Preliminary Approval




                                                                                              Page 25 of 84

Section 26

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 6 November 2018 regarding representations made to Decision Notice
MCU18/0009 for a Material Change of Use Multiple Housing –Type 3 Retirement & Special
Needs situated at 186 Cooroy Noosa Rd Tewantin and:
A.   Amend the type of approval from a Preliminary Approval for a Material Change of Use -
     Multiple Housing Type 3 - (Retirement & Special Needs) to Development Permit for a
     Material Change of Use - Multiple Housing Type 3 - (Retirement & Special Needs – 32
     beds).
B.   Agree to change conditions 1, 2, 26, 27 36 and 39 to read:
     1.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed in the
           following table unless otherwise amended by these conditions.
      Plan No.     Rev.   Plan/Document Name                                         Date
      MCU 01 A            Existing Part Site Plan by Middap Architecture             August 2018
      MCU 02 A            Proposed Lower Level Plan by Middap Architecture           August 2018
      MCU 03 A            Proposed Upper Level Plan by Middap Architecture           August 2018
      MCU 04       A      Site Sections by Middap Architecture                       August 2018
      MCU 05       A      Proposed Site Elevations by Middap Architecture            August 2018
      MCU 06       A      Proposed Entry/Café Floor Plan by Middap Architecture      August 2018
      MCU 07       A      Proposed Entry/Café Elevations by Middap Architecture      August 2018
      MCU 08       A      Proposed Villa 1 Floor Plans by Middap Architecture        August 2018
      MCU 09       A      Proposed Villa 1 Floor Elevations by Middap Architecture   August 2018
      MCU 10       A      Proposed Villa 3 Floor Plan by Middap Architecture         August 2018
      MCU 11       A      Proposed Villa 3 Elevations by Middap Architecture         August 2018
      MCU 12       A      Proposed Villa 2 + 4 Floor Plans by Middap Architecture    August 2018
      MCU 13       A      Proposed Villa 2 + 4 Elevations by Middap Architecture     August 2018
     2.    The development must include the following, to the reasonable satisfaction of the
           Manager, Development Assessment:
           2.1. Deleted
           2.2. Car parking must be provided at a rate of 0.92 car spaces per bed. Of these,
                0.21 spaces per bed are for event days which must be accommodated on the
                site, but may be located in temporary areas. The layout must comply with
                Australian Standard AS/NZS 2890.1-2004 and may include the existing 18 car
                parking spaces in the road reserve.
           2.3. Deleted
           2.4. Deleted
           2.5. A minimum landscape setback of 6.0 metres must be provided to all
                boundaries, apart from existing development, with existing vegetation retained
                and reinforced in the setbacks to maintain the amenity of adjoining residents
                and a visual screen to Cooroy Noosa Road.
           2.6. Noise attenuation measures must be incorporated into the building design to
                mitigate traffic noise impacts from Cooroy Noosa Road. The design criteria for
                the development must be 63dB(A)L10(18hours)
           2.7. Deleted
     26.   All works must be constructed and work procedures undertaken in accordance with:
           a.    The approved plans, the approved amended plans and the conditions detailed
                 in this Decision Notice.


                                                                                     Page 26 of 84

Section 27

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018


           b.   The document ‘Proposed Cartwright Village Extension – Carramar, Noosa Care
                Integrated Water Management Plan Version 2 by Callaghan & Toth dated
                September 2018.
           c.   The document ‘Noosa Care Inc Cartwright Village Extension Carramar, Cooroy
                Noosa Road, Tewantin Preliminary Design of Stormwater Detention Volume’ by
                BSM dated 21 December 2017.
           d.   The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24 July
                2017.
           e.   The Addendum Letter by Cardno (document number WE17064) dated 23
                March 2018.
           f.   The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01) dated
                27 September 2018.
           g.   A minimum Finished Floor Level (FFL) of the Aged Care Facility and any
                associated facilities at 8.80m AHD.
           h.   A minimum Finished Floor Level (FFL) of the Independent Living Units of 8.80m
                AHD.
           i.   All relevant Noosa Council Planning Scheme Policies, standard drawings,
                standard specifications and guidelines are to be adhered to.
     27.   An easement for drainage purposes must be registered against the titles of the
           properties in favour of Council over the land area identified as being external to the
           area to be dedicated as Environmental Park and below the post development 1%
           AEP flood level on the subject site from flooding sources external to the site
           (excluding proposed structures). The easement width must be in accordance with
           Noosa Council’s Development Design Planning Scheme Policies. The easement
           must be granted at no cost to Noosa Council. The wording of the easement
           documentation must be in accordance with Council’s Standard Easement document.
     36.   Prior to obtaining a Development Permit for Operational Works the land area
           identified as being to the east of the proposed wetland fence on Middap Architecture
           Pty Ltd - Plan MCU. 02A. (Proposed Lower Level Plan August 2018) be dedicated to
           Council in fee simple on trust for the purpose of an Environmental Park.
           The land to be dedicated is “non-trunk infrastructure” for the purposes of the Planning
           Act 2016.
     39.   A permanent fence must be constructed along the interface of the development site
           with the land area to be dedicated. The fence must be constructed in accordance with
           an Operational Works approval and must be to the following specifications:
           a. 2.1 metre high
           b. Pool fence with vertical bars at 100mm centres (or similar)
           c. Educational signage for wetlands protection.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The applicant has made representations to the Preliminary Approval for a Material Change of
Use – Multiple Housing - Type 3 Retirement and Special Needs.
A Preliminary Approval for a Material Change of Use Multiple Housing Type 3 Retirement and
Special Needs was issued 21 August 2018. The Preliminary Approval was issued due to the

                                                                                   Page 27 of 84

Section 28

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018


identification of development constraints related to the habitat of the threatened Swamp Crayfish,
flooding, wetland vegetation and car parking.
The applicant suspended the appeal period on 31 August 2018 and in accordance with Section
75 of the Planning Act 2016 made representations on 2 October 2018. The representations seek
a Negotiated Decision Notice which changes the decision type from a Preliminary Approval to a
Development Permit for a Material Change of Use, amendment to conditions 1, 26 36 and 39 and
deletion of conditions 2 and 27.
The original application was for an additional 48 beds in 6 accommodation villas. The current
proposal is for an additional 32 beds in 4 accommodation villas.
The application is before Council as the Development Permit was originally determined by
Council.
The subject site is detailed in the following images.




                                        Figure 1: Locality Plan




                                                                                   Page 28 of 84

Section 29

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018




                                       Figure 2: Subject site

2.   SITE DETAILS
2.1. Background
The applicant applied for a Material Change of Use – Multiple Housing – Type 3 Retirement and
Special Needs. The application sought approval for an additional 48 beds to be contained within
6 separate accommodation buildings positioned in the eastern undeveloped portion of the site.
The site was originally gifted from Noosa Shire Council to Noosa Care Incorporated in 1975 for
the purposes of providing aged care.
A substantial development known as ‘Carramar Noosa Homes’ is currently located on the site.
The complex has been operating over a number of years with several extensions progressively
being added to the facility. The existing development consists of 142 residential rooms containing
one bed, including a special care dementia building containing 32 rooms, and ancillary features
including a community centre, staff building and administration building, which the applicant
advises amounts to 9093m2 in gross floor area and approximately 19% site cover.
2.2. Site Description
The site is an irregular shaped parcel of land and comprises an area of 4.43 hectares. The site
slopes gently from the western boundary down to the eastern boundary towards a well vegetated
watercourse which forms part of the open space system in the surrounding Noosa Parkland
estate. This area is well vegetated with a range of melaleuca, casuarina and eucalypt species,
but with some limited areas of mown grass. Land to the west, north and east is zoned for
residential development and contains residential dwellings of one to two storeys. The eastern
boundary adjoins parkland, with Wooroi State Forest located opposite the site on the southern
side of Cooroy Noosa Road.
3.   ASSESSMENT
An assessment in relation to each of the submitted representations is provided below:
Conditions 1 and 2 - Amended Plans
1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are numbered 1717 DA 01 – DA 15


                                                                                   Page 29 of 84

Section 30

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


      prepared by Middap Architecture and dated November 2017. These plans must be
      amended in accordance with the conditions.
2.    Amended plans and associated reports must be submitted to Council prior to any further
      development applications being made and must include the following to the reasonable
      satisfaction of the Manager, Development Assessment:
      2.1. All development and associated vegetation removal and fire management measures
           must be located outside the Q100 flood line and not extend further east from the
           existing carpark footprint to protect the existing wetland vegetation and Swamp
           Crayfish habitat.
      2.2. Car parking must be provided at a rate of 0.92 car spaces per bed. Of these, 0.21
           spaces per bed are for event days and must be provided in temporary areas on the
           site. The layout must comply with Australian Standard AS/NZS 2890.1-2004 and may
           include the existing 18 car parking spaces in the road reserve.
      2.3.   All additional car parking required for the development must be provided on site.
      2.4. New buildings must be set back at least 6.0 metres from the front and the rear
           boundary.
      2.5. A minimum landscape setback of 6.0 metres must be provided to all boundaries,
           apart from existing development, with existing vegetation retained and reinforced in
           the setbacks to maintain the amenity of adjoining residents and a visual screen to
           Cooroy Noosa Road.
      2.6. Noise attenuation measures must be incorporated into the building design to mitigate
           traffic noise impacts from Cooroy Noosa Road. The design criteria for the
           development must be 63dB(A)L10(18hours)
      2.7. All buildings and works must be sited in a manner that provides for retention of some
           healthy groupings of significant trees to the west of the Q100 flood line to the
           reasonable satisfaction of the Manager, Development Assessment.
Condition 36 – Dedication of Park
36.   Prior to obtaining a Development Permit for Operational Works the land area identified as
      occurring at or below the 1 in 100 ARI (Q100) and to the east of the existing car park
      footprint must be dedicated to Council in fee simple on trust for the purpose of an
      Environmental Park.
      The land to be dedicated is “non-trunk infrastructure” for the purposes of the Planning Act
      2016.
Applicant’s Request
The applicant has prepared amended plans that address the conditions of the preliminary
approval including a requirement for the development to be located outside of the mapped Q100
flood area. The applicant requests that Council issue a Development Permit for a Material
Change of Use - Multiple Housing Type 3- (Retirement & Special Needs)
With regards to condition 1 it is requested that the condition be amended to reflect the new plans.
The applicant has requested that condition 2 be deleted or amended to detail car parking,
setback and noise attenuation matters.
The applicant has also submitted a statement from Rob Friend & Associates Pty Ltd that
examines the amended proposal against bushfire requirements. Mr Friend indicates that the
proposed bushfire measures to be implemented on site including construction standards are over
specified for the risk however this will ensure that bushfire risk is mitigated to an acceptable
standard.



                                                                                    Page 30 of 84

Section 31

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  6 NOVEMBER 2018


With regards to condition 36 the applicant advises:
Following issue of Councils decision notice, the applicant met with Council staff to address the
requirements and conditions of the preliminary approval. During these discussions the applicant
noted that the condition required the dedication of an area of the site that included existing
pathways, seating and lawn areas that were used for passive and active recreation by residents.
This area is clear of the crayfish habitat and is a landscaped area that will be maintained in its
current state.
As this area is part of the landscaped setting and is not in its natural state, the applicant requests
that this landscaped area be excluded from the area required to be dedicated to Council for
environmental park as detailed on Middap Architecture Pty Ltd - Plan MCU. 02A. (excerpt below).
The applicant notes that a 2.1 metre high pool fence will be required to be constructed along this
boundary for the safety of residents. Advice has been received from Cardno that the proposed
fence and revised building layout will lessen the potential for negative impacts or drainage
blockages.

                                                              Proposed wetland fence




                                                                         Existing landscaped area wit
                                                                         pathways and seating




                                                                                 Q100 Flood Line




                                                                                Crayfish habitat




The applicant proposes that the condition be amended for the parkland dedication to reflect the
location as detailed on Middap Architecture Pty Ltd Plan MCU 02A.
Assessment
The proposed plans demonstrate compliance with the conditions of approval and result in the
removal of 2 accommodation villas from within the Q100 flood area. There will be no new works
within the Q100 flood area. This has resulted in the reduction of additional beds from the
originally proposed 48 to 32, bringing the total number of beds to 174 beds. 161 car spaces have
been provided which complies with the required rate of 0.92 spaces per bed.
The amended plans also seek to use some areas within the Q100 flood area which are currently
occupied by an existing path, a section of mown lawn with scattered trees and an area to the
east of the car park for the purpose of fire management measures. The applicant also seeks for
these areas to be removed from the area to be dedicated as Environmental Park. The use of
these areas for bushfire management purposes will result in the management of the understorey
with the existing trees, including swamp paperbark, retained. The mown area is suitable to use
for bushfire management purposes as it has been developed with infrastructure that has served

                                                                                         Page 31 of 84

Section 32

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


the development for a significant period of time. This infrastructure will continue to be used when
the site is developed and does not undermine the areas drainage function or impact on the
habitat of the threatened swamp crayfish. The area to the east of the car park proposed to be
used for bushfire management purposes does not contain ecological values sought to be
protected, with the proposed change consistent with the location of the existing fence line.
The relevant areas are located to the north and east of the existing car park and are depicted in
the following images and site plan.




                                                                                    Page 32 of 84

Section 33

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 33 of 84

foe)              Oe oo             ae                    be       :          4        ay       a                A Te exc      Pe           eae aye                                       Fak.                                                             +
  rc
  oS
               EO     , a             x WE       ae  |    ‘     , co          7 5      ‘   g          Ss           Wages oe               d       es    ; \          se)                    2   ¥ oy ry
 uJ                  ,      sie   %       o>
  S            Saar      ras       ~~           u oie eS      la  o           “y     Pa g oa        ;    é               .
  N           DN Fe               4   SPE              ny    Si               ces                                   ee                         a    te                               :       —
  Ww          a EN          es           a        ,         r s      , et? 3          oa
  Ss           reo mate         3 >     ee        Brae        een  Bod!) Ny,
  >           is ’        ee     »       ~:   a   Wy          t   re y | To           ae    Bo       ’
                eS waa                  ee               ‘mie        :          3      iS         ;                bg   oe »y.                  gery lay)     ae        A            >)      BK tee
                         .       eas         te               ee               is |                ee.  3                                        Es
  cc           .        ..         aye     ee ae            ya |           ;    te   i          7"       y            .
  a                       =  ea       ae
              ae        bio =             ea,                or                Das  ite   4         ,                nee es                  as           Ri
                  4        pe     ee                 — sama                   ‘a              b                                et
  <x          te     ees ae oa            a   4      me           ae            §       eS         5             ta        aye Page     Bre  eed: 8
5	1	1	1	20	19	2132	471	4	63	91	|
5	1	1	1	20	20	2236	466	4	26	41	i
5	1	1	1	20	21	2291	469	3	5	83	A
5	1	1	1	20	22	2497	417	55	46	36	rie
5	1	1	1	20	23	2582	413	3	16	7	.
5	1	1	1	20	24	3316	260	24	48	21	00
4	1	1	1	21	0	434	300	2915	564	-1	
5	1	1	1	21	1	434	801	64	63	35	eee
5	1	1	1	21	2	539	791	131	25	16	Parte
5	1	1	1	21	3	700	777	29	16	0	=
5	1	1	1	21	4	890	717	69	43	16	if)
5	1	1	1	21	5	1139	701	35	8	0	e
5	1	1	1	21	6	1283	664	30	23	0	mI
5	1	1	1	21	7	1597	615	41	16	31	-
5	1	1	1	21	8	1684	573	62	41	24	a
5	1	1	1	21	9	1781	563	80	26	43	ats
5	1	1	1	21	10	1935	539	60	34	54	x
5	1	1	1	21	11	2016	501	11	45	29	ai
5	1	1	1	21	12	2164	504	3	23	29	re
5	1	1	1	21	13	2517	436	61	32	31	i
5	1	1	1	21	14	3315	300	34	15	22	©
4	1	1	1	22	0	325	444	2308	431	-1	
5	1	1	1	22	1	395	853	19	5	22	Fer
5	1	1	1	22	2	528	813	14	28	0	Pi
5	1	1	1	22	3	584	806	47	19	34	(aut.
5	1	1	1	22	4	669	783	34	31	0	-,.
5	1	1	1	22	5	892	765	8	3	92	=
5	1	1	1	22	6	936	730	12	36	22	iF
5	1	1	1	22	7	1007	746	2	2	69	4
5	1	1	1	22	8	1089	725	2	2	21	i
5	1	1	1	22	9	1229	703	2	3	0	,
5	1	1	1	22	10	1577	618	12	28	34	oo
5	1	1	1	22	11	1647	621	8	7	0	£
5	1	1	1	22	12	1762	606	2	2	0	.
5	1	1	1	22	13	1807	588	26	18	16	2x
5	1	1	1	22	14	1883	563	8	28	20	<=
5	1	1	1	22	15	1992	562	2	2	26	3
5	1	1	1	22	16	2179	524	2	3	86	|
5	1	1	1	22	17	2236	518	3	4	65	H
5	1	1	1	22	18	2529	460	1	3	10	Ly
5	1	1	1	22	19	2565	444	68	15	15	<i
4	1	1	1	23	0	155	318	3195	598	-1	
5	1	1	1	23	1	155	888	34	28	83	Q
5	1	1	1	23	2	328	855	93	38	28	a
5	1	1	1	23	3	452	848	21	22	28	ee
5	1	1	1	23	4	506	830	12	44	0	me
5	1	1	1	23	5	539	819	69	52	29	ea
5	1	1	1	23	6	654	814	13	9	48	is
5	1	1	1	23	7	843	799	2	2	30	ant
5	1	1	1	23	8	933	759	6	17	0	i
5	1	1	1	23	9	946	756	13	50	80	|
5	1	1	1	23	10	990	762	6	8	0	f
5	1	1	1	23	11	1095	720	76	29	30	ae:
5	1	1	1	23	12	1336	675	11	40	0	ame
5	1	1	1	23	13	1595	630	58	34	30	Be
5	1	1	1	23	14	1696	612	66	43	32	Se
5	1	1	1	23	15	1803	603	56	26	0	as
5	1	1	1	23	16	1874	576	58	49	34	age
5	1	1	1	23	17	1969	567	19	10	0	%
5	1	1	1	23	18	2022	544	26	49	67	i
5	1	1	1	23	19	2097	554	4	10	79	J
5	1	1	1	23	20	2180	510	41	54	23	Te
5	1	1	1	23	21	2551	470	12	26	10	a
5	1	1	1	23	22	2580	460	37	29	33	aS
5	1	1	1	23	23	3324	318	26	25	35	°
4	1	1	1	24	0	155	384	3195	616	-1	
5	1	1	1	24	1	155	948	27	52	62	Wu
5	1	1	1	24	2	442	896	82	68	21	eS
5	1	1	1	24	3	539	885	76	39	14	ores
5	1	1	1	24	4	723	879	7	3	0	-
5	1	1	1	24	5	842	837	45	51	7	Z|
5	1	1	1	24	6	934	807	52	46	19	at)
5	1	1	1	24	7	1235	788	16	12	0	-—
5	1	1	1	24	8	1301	752	43	38	0	(S
5	1	1	1	24	9	1392	733	13	33	31	%
5	1	1	1	24	10	1671	656	186	67	27	aE
5	1	1	1	24	11	1895	638	48	41	28	4
5	1	1	1	24	12	1989	621	37	38	0	%G
5	1	1	1	24	13	2049	598	71	49	48	a
5	1	1	1	24	14	2155	620	2	11	51	oF.
5	1	1	1	24	15	2224	585	48	43	31	i
5	1	1	1	24	16	2307	565	21	34	49	“ae
5	1	1	1	24	17	2531	529	28	24	41	J
5	1	1	1	24	18	3316	384	34	23	17	9
4	1	1	1	25	0	155	422	3195	628	-1	
5	1	1	1	25	1	155	986	35	64	73	g
5	1	1	1	25	2	371	934	126	58	56	AGP
5	1	1	1	25	3	544	927	49	42	45	ce
5	1	1	1	25	4	653	902	31	59	3	oe:
5	1	1	1	25	5	757	880	35	27	5	Pe
5	1	1	1	25	6	890	831	30	77	55	|
5	1	1	1	25	7	940	847	66	37	19	ay
5	1	1	1	25	8	1028	856	28	15	7	|i
5	1	1	1	25	9	1179	801	58	43	5	a
5	1	1	1	25	10	1417	770	17	43	38	2
5	1	1	1	25	11	1644	722	24	24	5	+
5	1	1	1	25	12	1679	713	87	45	8	Ney
5	1	1	1	25	13	1779	685	100	58	41	Gee
5	1	1	1	25	14	1912	674	108	37	12	eS
5	1	1	1	25	15	2036	644	56	41	0	~~
5	1	1	1	25	16	2262	597	117	60	26	iy
5	1	1	1	25	17	2537	549	60	48	27	ee
5	1	1	1	25	18	2786	544	9	14	0	;
5	1	1	1	25	19	3324	422	26	23	62	®
4	1	1	1	26	0	319	449	3040	590	-1	
5	1	1	1	26	1	319	1006	80	34	11	a
5	1	1	1	26	2	527	959	148	45	31	eh
5	1	1	1	26	3	751	920	126	30	39	eee
5	1	1	1	26	4	943	887	19	32	0	|
5	1	1	1	26	5	1000	879	32	48	25	ii
5	1	1	1	26	6	1209	846	52	33	0	i
5	1	1	1	26	7	1584	745	212	63	0	 3@eg
5	1	1	1	26	8	1809	735	52	33	39	Bt
5	1	1	1	26	9	1883	712	114	45	36	oa
5	1	1	1	26	10	2079	671	107	49	27	me
5	1	1	1	26	11	2261	628	150	43	25	eae
5	1	1	1	26	12	2498	632	16	7	17	BS
5	1	1	1	26	13	3324	449	35	50	31	o
4	1	1	1	27	0	155	501	3194	597	-1	
5	1	1	1	27	1	155	1067	35	31	31	O
5	1	1	1	27	2	321	1011	162	59	25	ae
5	1	1	1	27	3	530	999	56	24	20	Seu
5	1	1	1	27	4	788	951	63	30	24	ae
5	1	1	1	27	5	945	930	4	25	8	|
5	1	1	1	27	6	1122	871	143	31	23	ie.
5	1	1	1	27	7	1262	844	48	72	50	2
5	1	1	1	27	8	1328	866	2	2	26	ae
5	1	1	1	27	9	1586	786	134	50	0	<a
5	1	1	1	27	10	1732	761	135	50	13	eae
5	1	1	1	27	11	1889	707	251	69	0	Sal.
5	1	1	1	27	12	2223	701	17	9	21	»
5	1	1	1	27	13	2357	646	124	44	41	ae
5	1	1	1	27	14	3315	501	34	26	56	a
4	1	1	1	28	0	155	709	2232	421	-1	
5	1	1	1	28	1	155	1102	34	28	65	S
5	1	1	1	28	2	215	1038	64	96	95	|
5	1	1	1	28	3	313	1043	160	52	47	ame
5	1	1	1	28	4	546	1031	27	6	0	iE
5	1	1	1	28	5	620	1016	35	19	34	i
5	1	1	1	28	6	736	965	166	44	5	ee
5	1	1	1	28	7	1123	945	3	1	45	re
5	1	1	1	28	8	1181	896	89	35	0	ig
5	1	1	1	28	9	1395	877	21	19	28	bi
5	1	1	1	28	10	1585	812	192	55	24	ed
5	1	1	1	28	11	1825	765	173	53	27	Se
5	1	1	1	28	12	2020	767	34	17	49	a
5	1	1	1	28	13	2228	724	4	12	46	ha
5	1	1	1	28	14	2311	667	219	55	30	ee
4	1	1	1	29	0	155	694	2364	449	-1	
5	1	1	1	29	1	155	1136	34	7	88	=
5	1	1	1	29	2	337	1092	44	22	56	74,
5	1	1	1	29	3	442	1076	23	17	29	fs)
5	1	1	1	29	4	474	1063	52	30	13	gO
5	1	1	1	29	5	691	1022	30	16	5	Sean
5	1	1	1	29	6	742	1024	45	22	34	3.)
5	1	1	1	29	7	966	967	61	31	36	ae!
5	1	1	1	29	8	1125	947	7	28	19	4
5	1	1	1	29	9	1177	930	19	33	55	4
5	1	1	1	29	10	1292	917	28	11	26	we
5	1	1	1	29	11	1388	889	39	43	35	es
5	1	1	1	29	12	1578	871	24	19	22	i
5	1	1	1	29	13	1777	819	68	36	37	Bee
5	1	1	1	29	14	1861	817	19	19	15	Ts
5	1	1	1	29	15	1895	784	186	37	17	Oa
5	1	1	1	29	16	2345	722	6	22	27	ee
5	1	1	1	29	17	2382	715	33	34	14	ah
5	1	1	1	29	18	2508	694	11	22	55	¥
4	1	1	1	30	0	156	724	2404	481	-1	
5	1	1	1	30	1	156	1141	33	64	0	FF
5	1	1	1	30	2	382	1108	30	25	27	eh
5	1	1	1	30	3	427	1088	90	44	43	gee
5	1	1	1	30	4	546	1078	59	28	31	ik
5	1	1	1	30	5	634	1034	254	55	17	See
5	1	1	1	30	6	919	987	60	53	0	iA
5	1	1	1	30	7	1103	979	28	31	37	if
5	1	1	1	30	8	1157	947	27	83	0	(
5	1	1	1	30	9	1308	926	85	36	6	wee
5	1	1	1	30	10	1402	918	28	37	6	8
5	1	1	1	30	11	1574	866	160	51	44	Se
5	1	1	1	30	12	1764	854	44	26	16	ee
5	1	1	1	30	13	1830	845	33	16	0	a8
5	1	1	1	30	14	1881	821	76	43	9	Se
5	1	1	1	30	15	1994	804	54	37	0	oN
5	1	1	1	30	16	2071	797	21	53	43	g
5	1	1	1	30	17	2116	773	41	53	20	re:
5	1	1	1	30	18	2344	731	100	44	25	ses
5	1	1	1	30	19	2549	724	11	22	0	’
4	1	1	1	31	0	356	741	2208	410	-1	
5	1	1	1	31	1	356	1142	82	9	11	fet
5	1	1	1	31	2	486	1100	128	26	22	yearn:
5	1	1	1	31	3	679	1084	15	23	19	a
5	1	1	1	31	4	774	1065	8	6	17	a
5	1	1	1	31	5	931	1024	91	30	28	ees
5	1	1	1	31	6	1122	984	40	52	29	ee
5	1	1	1	31	7	1346	956	62	23	23	Sak
5	1	1	1	31	8	1574	919	43	19	30	ao
5	1	1	1	31	9	1652	903	49	21	9	ae
5	1	1	1	31	10	1838	867	27	27	0	~z
5	1	1	1	31	11	1977	843	67	20	8	“eS
5	1	1	1	31	12	2137	817	58	16	0	oat
5	1	1	1	31	13	2297	770	94	31	41	ee,
5	1	1	1	31	14	2523	741	41	26	36	4%
4	1	1	1	32	0	141	761	2423	474	-1	
5	1	1	1	32	1	141	1176	45	59	34	AT
5	1	1	1	32	2	314	1156	89	31	48	tk
5	1	1	1	32	3	418	1142	44	35	28	Pee
5	1	1	1	32	4	571	1108	44	50	45	a4
5	1	1	1	32	5	627	1139	11	4	0	P
5	1	1	1	32	6	763	1057	62	61	44	ite
5	1	1	1	32	7	837	1061	65	48	20	3a
5	1	1	1	32	8	917	1056	67	35	35	wy
5	1	1	1	32	9	1162	1003	14	54	0	iB
5	1	1	1	32	10	1312	956	118	59	22	eg
5	1	1	1	32	11	1626	909	144	51	25	eve.
5	1	1	1	32	12	1790	920	2	3	32	5
5	1	1	1	32	13	1809	877	46	62	35	ie
5	1	1	1	32	14	1867	870	36	43	29	4
5	1	1	1	32	15	1968	844	90	57	2	ee
5	1	1	1	32	16	2087	829	112	42	20	wap
5	1	1	1	32	17	2282	788	59	47	29	Madi
5	1	1	1	32	18	2531	761	33	11	12	i
4	1	1	1	33	0	158	781	2378	493	-1	
5	1	1	1	33	1	158	1230	23	44	57	Ss
5	1	1	1	33	2	359	1201	88	21	27	wie
5	1	1	1	33	3	479	1174	31	31	37	ae
5	1	1	1	33	4	571	1146	84	36	4	a
5	1	1	1	33	5	725	1114	22	43	31	ye
5	1	1	1	33	6	828	1108	30	30	42	ey
5	1	1	1	33	7	929	1094	2	11	52	|
5	1	1	1	33	8	960	1060	10	59	0	:
5	1	1	1	33	9	1159	1061	4	2	0	re
5	1	1	1	33	10	1217	1043	10	24	22	Ye,
5	1	1	1	33	11	1279	1022	63	36	38	ee
5	1	1	1	33	12	1371	983	48	61	0	e.
5	1	1	1	33	13	1574	970	37	28	16	os
5	1	1	1	33	14	1629	960	62	25	42	Ze
5	1	1	1	33	15	1699	939	67	37	30	SOE
5	1	1	1	33	16	1780	945	24	27	0	F
5	1	1	1	33	17	1820	918	83	33	6	Ses
5	1	1	1	33	18	1962	897	30	21	25	fea
5	1	1	1	33	19	2050	893	12	21	9	FI
5	1	1	1	33	20	2088	901	2	4	65	|
5	1	1	1	33	21	2109	863	5	38	83	\
5	1	1	1	33	22	2194	854	29	21	7	7
5	1	1	1	33	23	2310	846	16	39	0	d
5	1	1	1	33	24	2343	830	25	30	31	Db
5	1	1	1	33	25	2456	792	23	47	0	r,
5	1	1	1	33	26	2492	781	44	50	16	mY
4	1	1	1	34	0	140	811	2653	506	-1	
5	1	1	1	34	1	140	1253	49	64	30	AT
5	1	1	1	34	2	337	1255	15	18	34	a
5	1	1	1	34	3	391	1201	110	58	43	Se
5	1	1	1	34	4	517	1204	9	10	18	ae
5	1	1	1	34	5	670	1182	3	2	22	ae
5	1	1	1	34	6	738	1139	103	44	15	oe
5	1	1	1	34	7	977	1118	17	28	49	i
5	1	1	1	34	8	1203	1059	126	55	1	Bey:
5	1	1	1	34	9	1336	1035	85	64	0	Pe
5	1	1	1	34	10	1574	998	82	40	23	ieee
5	1	1	1	34	11	1673	1010	3	3	44	*
5	1	1	1	34	12	1696	926	315	120	38	oe
5	1	1	1	34	13	2053	911	14	53	0	ih
5	1	1	1	34	14	2189	878	35	48	23	a
5	1	1	1	34	15	2244	885	52	55	31	hii
5	1	1	1	34	16	2318	863	123	48	18	ca
5	1	1	1	34	17	2475	811	73	100	6	is
5	1	1	1	34	18	2783	811	10	9	0	F
4	1	1	1	35	0	159	882	2390	470	-1	
5	1	1	1	35	1	159	1300	14	52	63	Ww
5	1	1	1	35	2	370	1261	50	47	7	ee
5	1	1	1	35	3	563	1235	49	39	27	are
5	1	1	1	35	4	635	1212	65	40	34	ae
5	1	1	1	35	5	715	1199	57	41	2	te
5	1	1	1	35	6	851	1185	3	3	36	;
5	1	1	1	35	7	1138	1113	16	57	0	s
5	1	1	1	35	8	1236	1121	11	24	0	:
5	1	1	1	35	9	1272	1078	86	64	17	Ege
5	1	1	1	35	10	1574	1051	19	10	46	in
5	1	1	1	35	11	1621	1016	130	76	13	ty
5	1	1	1	35	12	1762	994	108	45	27	Se
5	1	1	1	35	13	1892	972	45	66	34	vet
5	1	1	1	35	14	2033	964	15	36	0	~
5	1	1	1	35	15	2213	933	35	48	51	7
5	1	1	1	35	16	2335	891	38	39	29	‘Ca
5	1	1	1	35	17	2526	882	23	29	15	i
4	1	1	1	36	0	155	876	2580	526	-1	
5	1	1	1	36	1	155	1346	34	56	19	F
5	1	1	1	36	2	220	1323	56	83	0	|
5	1	1	1	36	3	373	1282	194	66	24	oe
5	1	1	1	36	4	730	1251	38	12	0	-
5	1	1	1	36	5	988	1206	1	5	66	|
5	1	1	1	36	6	1266	1126	113	74	37	ae
5	1	1	1	36	7	1702	1063	81	41	0	i
5	1	1	1	36	8	2091	974	81	80	26	ae
5	1	1	1	36	9	2206	983	11	25	58	|
5	1	1	1	36	10	2367	968	2	3	92	|
5	1	1	1	36	11	2523	913	31	35	1	%
5	1	1	1	36	12	2710	876	25	42	0	%
4	1	1	1	37	0	155	953	2430	497	-1	
5	1	1	1	37	1	155	1405	34	45	95	=
5	1	1	1	37	2	313	1360	19	44	86	a
5	1	1	1	37	3	408	1332	133	43	12	eat
5	1	1	1	37	4	717	1287	28	22	22	Bs
5	1	1	1	37	5	828	1265	70	42	31	ate
5	1	1	1	37	6	1214	1193	37	44	15	Bi
5	1	1	1	37	7	1279	1187	43	37	52	ae
5	1	1	1	37	8	1575	1123	80	42	23	he
5	1	1	1	37	9	1708	1106	71	43	27	Se
5	1	1	1	37	10	1823	1084	61	44	27	ee,
5	1	1	1	37	11	1981	1066	17	13	6	“
5	1	1	1	37	12	2228	999	168	41	38	A
5	1	1	1	37	13	2444	985	46	15	49	Be
5	1	1	1	37	14	2529	953	56	38	39	ae
4	1	1	1	38	0	155	986	2434	502	-1	
5	1	1	1	38	1	155	1455	34	33	56	=
5	1	1	1	38	2	313	1341	377	93	32	se
5	1	1	1	38	3	792	1304	106	44	16	en
5	1	1	1	38	4	1299	1226	7	34	25	ee
5	1	1	1	38	5	1575	1181	14	24	13	SS
5	1	1	1	38	6	1746	1125	124	46	29	ee
5	1	1	1	38	7	2031	1093	1	45	32	a
5	1	1	1	38	8	2227	1044	74	98	31	ae
5	1	1	1	38	9	2335	1014	29	47	37	We
5	1	1	1	38	10	2398	986	191	78	24	pare
4	1	1	1	39	0	155	1025	2415	500	-1	
5	1	1	1	39	1	155	1493	35	32	41	5
5	1	1	1	39	2	316	1410	189	60	3	eae
5	1	1	1	39	3	534	1390	87	40	9	eA
5	1	1	1	39	4	662	1373	54	39	12	ie
5	1	1	1	39	5	752	1391	5	5	32	2A
5	1	1	1	39	6	905	1334	8	19	1	A
5	1	1	1	39	7	992	1322	6	17	23	}
5	1	1	1	39	8	1216	1277	2	2	71	:
5	1	1	1	39	9	1574	1208	99	36	30	Se.
5	1	1	1	39	10	1708	1176	68	72	7	sie
5	1	1	1	39	11	1906	1180	18	13	18	eee
5	1	1	1	39	12	1976	1133	76	32	5	Lp
5	1	1	1	39	13	2120	1085	24	95	0	AN
5	1	1	1	39	14	2329	1081	14	48	50	y
5	1	1	1	39	15	2374	1059	29	28	27	os
5	1	1	1	39	16	2399	1043	50	72	42	pa
5	1	1	1	39	17	2480	1043	4	10	1	19
4	1	1	1	40	0	370	1080	2125	411	-1	
5	1	1	1	40	1	314	1469	59	36	22	Pe
5	1	1	1	40	2	459	1474	4	3	16	ed
5	1	1	1	40	3	481	1445	59	25	13	ner
5	1	1	1	40	4	667	1404	42	34	54	=
5	1	1	1	40	5	729	1393	71	41	12	ae
5	1	1	1	40	6	830	1381	89	30	21	ies
5	1	1	1	40	7	994	1352	41	20	0	‘s
5	1	1	1	40	8	1275	1311	8	13	0	-
5	1	1	1	40	9	1576	1235	67	36	9	eae
5	1	1	1	40	10	1694	1205	154	51	34	Rian
5	1	1	1	40	11	1861	1216	12	7	0	4
5	1	1	1	40	12	2057	1146	70	39	32	Pe
5	1	1	1	40	13	2180	1146	32	21	22	Ua
5	1	1	1	40	14	2330	1130	10	6	24	i
5	1	1	1	40	15	2472	1076	12	47	20	ae
4	1	1	1	41	0	151	1100	2435	486	-1	
5	1	1	1	41	1	151	1524	32	62	45	Oo
5	1	1	1	41	2	313	1488	49	45	21	a
5	1	1	1	41	3	508	1457	90	41	35	hese?
5	1	1	1	41	4	638	1456	31	26	38	Be
5	1	1	1	41	5	690	1436	86	33	25	eee
5	1	1	1	41	6	915	1397	15	37	76	ii
5	1	1	1	41	7	1096	1344	120	44	14	trek
5	1	1	1	41	8	1264	1325	18	41	0	 e
5	1	1	1	41	9	1602	1241	64	60	21	a
5	1	1	1	41	10	1679	1261	41	30	34	omy
5	1	1	1	41	11	1732	1228	57	46	18	Bis
5	1	1	1	41	12	1812	1223	8	12	12	a
5	1	1	1	41	13	1980	1169	155	76	5	———
5	1	1	1	41	14	2420	1100	15	33	39	,
5	1	1	1	41	15	2573	1114	13	18	0	a
4	1	1	1	42	0	155	1145	2338	456	-1	
5	1	1	1	42	1	155	1573	34	28	0	-
5	1	1	1	42	2	316	1538	14	32	28	a
5	1	1	1	42	3	400	1523	62	38	34	eR:
5	1	1	1	42	4	573	1496	13	20	40	og
5	1	1	1	42	5	709	1485	14	8	43	ee
5	1	1	1	42	6	744	1464	63	28	19	er
5	1	1	1	42	7	828	1466	24	6	36	a
5	1	1	1	42	8	1269	1363	8	24	25	.
5	1	1	1	42	9	1563	1296	74	50	17	eid
5	1	1	1	42	10	1672	1284	46	37	19	pi
5	1	1	1	42	11	1754	1285	20	21	15	a
5	1	1	1	42	12	1786	1281	18	19	7	Tt
5	1	1	1	42	13	1845	1257	24	41	21	ea
5	1	1	1	42	14	1970	1247	3	2	0	/
5	1	1	1	42	15	2060	1217	63	28	5	eps
5	1	1	1	42	16	2167	1181	114	43	28	=
5	1	1	1	42	17	2490	1145	3	9	0	/
4	1	1	1	43	0	155	1153	2434	478	-1	
5	1	1	1	43	1	155	1603	34	28	83	2
5	1	1	1	43	2	417	1548	27	45	44	>.
5	1	1	1	43	3	803	1479	72	23	11	CAE
5	1	1	1	43	4	911	1464	5	19	13	'
5	1	1	1	43	5	1280	1393	52	24	27	ri
5	1	1	1	43	6	1580	1323	135	46	37	eee
5	1	1	1	43	7	1746	1297	72	43	58	be
5	1	1	1	43	8	1845	1285	37	27	0	:*
5	1	1	1	43	9	2080	1244	44	21	20	ee
5	1	1	1	43	10	2485	1193	3	8	0	,
5	1	1	1	43	11	2581	1153	8	14	42	4
4	1	1	1	44	0	160	1232	2146	434	-1	
5	1	1	1	44	1	160	1628	10	38	70	Ww
5	1	1	1	44	2	318	1609	3	4	0	’
5	1	1	1	44	3	426	1583	20	20	50	Pe
5	1	1	1	44	4	510	1563	25	7	37	Pea
5	1	1	1	44	5	619	1545	23	17	32	ar
5	1	1	1	44	6	745	1518	44	16	0	p%
5	1	1	1	44	7	868	1505	14	15	18	7
5	1	1	1	44	8	877	1485	26	39	45	a
5	1	1	1	44	9	1277	1424	44	18	29	Pee
5	1	1	1	44	10	1647	1365	47	18	19	Re
5	1	1	1	44	11	1722	1329	117	50	48	ae
5	1	1	1	44	12	1841	1310	39	39	31	sao
5	1	1	1	44	13	2013	1288	24	19	38	Vy
5	1	1	1	44	14	2303	1232	3	12	0	f
4	1	1	1	45	0	428	1246	1883	374	-1	
5	1	1	1	45	1	428	1585	104	35	32	aes
5	1	1	1	45	2	559	1569	20	37	12	FS
5	1	1	1	45	3	591	1543	21	73	0	ee
5	1	1	1	45	4	707	1555	16	12	0	Ci
5	1	1	1	45	5	736	1550	12	16	0	Sa
5	1	1	1	45	6	832	1518	47	36	18	mai
5	1	1	1	45	7	1254	1438	20	33	20	Be
5	1	1	1	45	8	1287	1434	32	41	21	oe
5	1	1	1	45	9	1602	1381	75	19	24	ie
5	1	1	1	45	10	1695	1376	2	3	35	oe
5	1	1	1	45	11	1780	1343	59	42	38	ae
5	1	1	1	45	12	1891	1347	2	7	54	|
5	1	1	1	45	13	2039	1302	5	14	22	.
5	1	1	1	45	14	2232	1286	2	11	11	f
5	1	1	1	45	15	2296	1246	15	40	56	f
4	1	1	1	46	0	155	1295	2150	405	-1	
5	1	1	1	46	1	155	1667	34	33	94	=
5	1	1	1	46	2	417	1629	2	3	0	E
5	1	1	1	46	3	430	1625	15	29	37	ie
5	1	1	1	46	4	510	1605	35	40	7	Sat
5	1	1	1	46	5	559	1599	5	5	71	‘
5	1	1	1	46	6	611	1597	16	30	47	bas
5	1	1	1	46	7	768	1563	10	25	28	A
5	1	1	1	46	8	802	1543	96	42	22	ia
5	1	1	1	46	9	916	1548	3	5	10	'
5	1	1	1	46	10	1256	1473	23	31	46	Lae
5	1	1	1	46	11	1316	1461	3	3	33	3
5	1	1	1	46	12	1576	1384	69	58	22	Sag:
5	1	1	1	46	13	1665	1387	68	31	14	oii
5	1	1	1	46	14	1758	1377	30	26	10	oe
5	1	1	1	46	15	1824	1366	39	24	8	Pan
5	1	1	1	46	16	2230	1295	21	19	12	a
5	1	1	1	46	17	2303	1295	2	2	0	}
4	1	1	1	47	0	155	1279	2282	454	-1	
5	1	1	1	47	1	155	1705	34	28	83	>
5	1	1	1	47	2	436	1654	15	23	47	x)
5	1	1	1	47	3	492	1653	12	12	49	a
5	1	1	1	47	4	579	1644	1	3	28	Gs
5	1	1	1	47	5	655	1604	48	47	34	ae
5	1	1	1	47	6	768	1600	2	2	0	;
5	1	1	1	47	7	833	1565	15	36	30	vl
5	1	1	1	47	8	864	1577	17	34	0	,
5	1	1	1	47	9	916	1559	3	18	81	{
5	1	1	1	47	10	1142	1525	2	3	0	,
5	1	1	1	47	11	1248	1501	38	15	4	ae
5	1	1	1	47	12	1335	1499	2	3	18	=
5	1	1	1	47	13	1581	1436	88	22	19	TF
5	1	1	1	47	14	1684	1417	30	13	16	a
5	1	1	1	47	15	1752	1391	41	52	33	aes
5	1	1	1	47	16	1815	1390	53	35	13	a
5	1	1	1	47	17	2034	1373	2	3	16	'
5	1	1	1	47	18	2226	1321	3	21	57	|
5	1	1	1	47	19	2247	1308	10	36	25	4
5	1	1	1	47	20	2276	1294	30	37	17	mi
5	1	1	1	47	21	2428	1279	9	37	28
  Oo              %     Be Sask es ~ at                  ry  4)                      “    t      7                  .  at Ss               2       2% |                 \ ,            ’                     :
  oc          aR            ae g            5           mF                                     ’                   neat  ee             te =      “V3                  Wa             y
                    é             :           poe ei                                       ee          aS            ~           ae            wf        G              a   i                                      :
ii                                   Pees               “sal       sf                    sf            Re          ae                y          iu                           |,                                    !
  S                  i          x          Ts Aaa                            ;           ey                        b= — et a                    oe        ne        , a
  So                                                   a                         ra      Es      8   el    4       i  ;      :      -&                              BAL s                    a                  o
  B                               :       Si      i     4                             ee   ae        ae              oo                                 \                 Fa)    i           4
  z                                                                                      hae      a  4    .        A     & 4        pi                              é                         as                  )
                                       eee                         i         BY           pst          Ft          +i                         *           7      2.
                                                                                                                                                      Cass             - =         .  r                             |
                                                        a      A    a      -      os    ,  ©         .             lb iey       ae                     i             y=      ~                                    >
  =                      .                                              |          hae                  Be,           ig     eS                                      A ie           es                            ?
                                                os                                           uh        arial           bop                     ginescened                      ,                                i
                                                                                    F                               °           :                                pel                                       Bi
  =                                               5	1	1	1	57	3	992	1893	2	2	0	,
5	1	1	1	57	4	1238	1838	10	24	79	§
5	1	1	1	57	5	1384	1797	16	41	39	pe
5	1	1	1	57	6	1586	1768	21	31	58	Ge
5	1	1	1	57	7	1673	1751	11	9	38	a
5	1	1	1	57	8	1714	1744	23	31	46	A
5	1	1	1	57	9	1742	1723	80	54	0	waeey
5	1	1	1	57	10	2228	1646	17	35	0	ES
5	1	1	1	57	11	2582	1584	16	34	12	Bc
5	1	1	1	57	12	2758	1572	10	14	0	o
5	1	1	1	57	13	2777	1550	6	12	35	i
4	1	1	1	58	0	155	1614	2642	502	-1	
5	1	1	1	58	1	155	2088	34	28	86	z
5	1	1	1	58	2	674	2000	5	21	50	:
5	1	1	1	58	3	842	1974	8	1	53	;
5	1	1	1	58	4	992	1940	15	21	0	,
5	1	1	1	58	5	1189	1876	43	57	9	on
5	1	1	1	58	6	1480	1833	121	44	2	co
5	1	1	1	58	7	1639	1824	8	2	19	6
5	1	1	1	58	8	1655	1805	75	40	2	A
5	1	1	1	58	9	1750	1793	68	37	35	aad
5	1	1	1	58	10	1948	1741	43	57	18	en
5	1	1	1	58	11	2311	1694	9	19	58	3
5	1	1	1	58	12	2779	1614	18	28	26	|
4	1	1	1	59	0	155	1642	2642	533	-1	
5	1	1	1	59	1	155	2119	34	56	69	<
5	1	1	1	59	2	819	2008	21	7	26	4
5	1	1	1	59	3	919	2000	5	8	32	i
5	1	1	1	59	4	991	1963	19	28	32	i
5	1	1	1	59	5	1087	1955	1	4	65	}
5	1	1	1	59	6	1235	1922	6	43	0	‘
5	1	1	1	59	7	1307	1910	23	54	0	M
5	1	1	1	59	8	1483	1875	10	11	0	e
5	1	1	1	59	9	1642	1835	14	26	20	ce
5	1	1	1	59	10	1724	1849	31	16	36	ee
5	1	1	1	59	11	2002	1791	4	6	0 3 ’ Oe PS x 9 x, an ea i '
                                                                                                                           ee                   me Vale                          !                            :
                                                                                                                                    SSL                                        ey                           a
                                                                                                                   —s     he           -          —      0  ge     é        w2              4            Re. eee |
                                                                                                                                                                                   gn                 e

Section 34

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018




It is agreed that the proposed areas below Q100 and to the east of the car park may be used for
the purpose of bushfire management and be removed from the area to be dedicated as
Environmental Park.
The amended plans demonstrate compliance with the amendments required by the conditions of
the preliminary approval and therefore may be deleted. It is recommended that the conditions
regarding landscaping, noise attenuation and car parking rates be retained, with the car parking
condition slightly modified, to give surety that the total number of car spaces on site is adequate
including the number of spaces provided in the road reserve.
Therefore, it is recommended that condition 1 be re-worded to reflect the current set of plans and
conditions 2 and 36 be amended as follows:
1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table unless
     otherwise amended by these conditions.




                                                                                    Page 34 of 84

Section 35

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  6 NOVEMBER 2018


       Plan No.      Rev.   Plan/Document Name                                         Date
       MCU 01 A             Existing Part Site Plan by Middap Architecture             August 2018
       MCU 02 A             Proposed Lower Level Plan by Middap Architecture           August 2018
       MCU 03 A             Proposed Upper Level Plan by Middap Architecture           August 2018
       MCU 04        A      Site Sections by Middap Architecture                       August 2018
       MCU 05        A      Proposed Site Elevations by Middap Architecture            August 2018
       MCU 06        A      Proposed Entry/Café Floor Plan by Middap Architecture      August 2018
       MCU 07        A      Proposed Entry/Café Elevations by Middap Architecture      August 2018
       MCU 08        A      Proposed Villa 1 Floor Plans by Middap Architecture        August 2018
       MCU 09        A      Proposed Villa 1 Floor Elevations by Middap Architecture   August 2018
       MCU 10        A      Proposed Villa 3 Floor Plan by Middap Architecture         August 2018
       MCU 11        A      Proposed Villa 3 Elevations by Middap Architecture         August 2018
       MCU 12        A      Proposed Villa 2 + 4 Floor Plans by Middap Architecture    August 2018
       MCU 13        A      Proposed Villa 2 + 4 Elevations by Middap Architecture     August 2018
2.    The development must include the following, to the reasonable satisfaction of the Manager,
      Development Assessment:
      2.1. Deleted
      2.2. Car parking must be provided at a rate of 0.92 car spaces per bed. Of these, 0.21
           spaces per bed are for event days which must be accommodated on the site, but
           may be located in temporary areas. The layout must comply with Australian Standard
           AS/NZS 2890.1-2004 and may include the existing 18 car parking spaces in the road
           reserve.
      2.3. Deleted
      2.4. Deleted
      2.5. A minimum landscape setback of 6.0 metres must be provided to all boundaries,
           apart from existing development, with existing vegetation retained and reinforced in
           the setbacks to maintain the amenity of adjoining residents and a visual screen to
           Cooroy Noosa Road.
      2.6. Noise attenuation measures must be incorporated into the building design to mitigate
           traffic noise impacts from Cooroy Noosa Road. The design criteria for the
           development must be 63dB(A)L10(18hours)
      2.7. Deleted
36.   Prior to obtaining a Development Permit for Operational Works the land area identified as
      being to the east of the proposed wetland fence on Middap Architecture Pty Ltd - Plan
      MCU. 02A. (Proposed Lower Level Plan August 2018) be dedicated to Council in fee
      simple on trust for the purpose of an Environmental Park.
      The land to be dedicated is “non-trunk infrastructure” for the purposes of the Planning Act
      2016.
Condition 26 – Amended Plans and Reports
26.   All works must be constructed and work procedures undertaken in accordance with:
      a.   The approved plans, the approved amended plans and the conditions detailed in this
           Decision Notice.
      b.   The document ‘Proposed Cartwright Village Extension – Carramar, Noosa Care
           Integrated Water Management Plan Version 0’ by Callaghan & Toth dated 12
           February 2018.
      c.   The document ‘Noosa Care Inc Cartwright Village Extension Carramar, Cooroy
           Noosa Road, Tewantin Preliminary Design of Stormwater Detention Volume’ by BSM
           dated 21 December 2017.
      d.   The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24 July 2017.

                                                                                       Page 35 of 84

Section 36

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 6 NOVEMBER 2018


      e.   The Addendum Letter by Cardno (document number WE17064) dated 23 March
           2018.
      f.   The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01) dated 13
           July 2018.
      g.   A minimum Finished Floor Level (FFL) of the Aged Care Facility and any associated
           facilities at 8.80m AHD.
      h.   A minimum Finished Floor Level (FFL) of the Independent Living Units of 8.80m
           AHD.
      i.   All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
           specifications and guidelines are to be adhered to.
      Prior to the issue of a Development Permit for Material Change of Use these reports must
      be amended to reflect the amended development proposal as required by Condition 2.
Applicant’s Request
The applicant submits the following revised reports to address the condition:
a)    Amended plans are submitted that located all buildings outside the Q100 flood line as
      required by condition 2.1
b)    A revised Integrated Water Management Plan prepared by Callaghan and Toth will be
      submitted to address the amended development proposal.
c)    Refer b) above
d)    A technical memorandum reviewing the revised proposal with reference to flooding has
      been prepared by Cardno.
e)    Refer d) above.
f)    Refer d) above.
g)    Proposal able to comply with minimum floor heights.
h)    Proposal able to comply with minimum floor heights.
The amended plans and further addendums to the specialist reports addresses the condition
above.
Proposed amended condition: Update condition to reflect additional documentation provided.
Assessment
The applicant has provided amended reports which have been reviewed by Council officers and
Council’s consultant Traffic Engineer and Water Quality/Quantity Engineer. The reports satisfy
the condition and therefore, it is recommended that the condition be updated to reflect the
amended reports as follows:
26.   All works must be constructed and work procedures undertaken in accordance with:
      a.   The approved plans, the approved amended plans and the conditions detailed in this
           Decision Notice.
      b.   The document ‘Proposed Cartwright Village Extension – Carramar, Noosa Care
           Integrated Water Management Plan Version 2 by Callaghan & Toth dated September
           2018.
      c.   The document ‘Noosa Care Inc Cartwright Village Extension Carramar, Cooroy
           Noosa Road, Tewantin Preliminary Design of Stormwater Detention Volume’ by BSM
           dated 21 December 2017.
      d.   The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24 July 2017.


                                                                                    Page 36 of 84

Section 37

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


      e.   The Addendum Letter by Cardno (document number WE17064) dated 23 March
           2018.
      f.   The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01) dated 27
           September 2018.
      g.   A minimum Finished Floor Level (FFL) of the Aged Care Facility and any associated
           facilities at 8.80m AHD.
      h.   A minimum Finished Floor Level (FFL) of the Independent Living Units of 8.80m
           AHD.
      i.   All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
           specifications and guidelines are to be adhered to.
Condition 27 – Drainage Easement
27.   An easement for drainage purposes must be registered against the titles of the properties
      in favour of Council over the land area identified as being below the post development 1%
      AEP flood level on the subject site from flooding sources external to the site (excluding
      proposed structures). The easement width must be in accordance with Noosa Council’s
      DDPSP. The easement must be granted at no cost to Noosa Council. The wording of the
      easement documentation must be in accordance with Council’s Standard Easement
      document.
Applicant’s Request
The condition is not required as the area below Q100 is to be dedicated to Council as per
condition 36. Request - delete condition.
Assessment
It is agreed that the area to be dedicated to Council as an Environmental Park does not need to
be covered by the easement as it will be protected as a park. However, the easement should
apply to the area of land below Q100 not required as Environmental Park as per representations
made to conditions 1, 2 and 36 which exclude some of the area below Q100. It is therefore
recommended that the condition be amended as follows:
27.   An easement for drainage purposes must be registered against the titles of the properties
      in favour of Council over the land area identified as being external to the area to be
      dedicated as Environmental Park and below the post development 1% AEP flood level on
      the subject site from flooding sources external to the site (excluding proposed structures).
      The easement width must be in accordance with Noosa Council’s DDPSP. The easement
      must be granted at no cost to Noosa Council. The wording of the easement documentation
      must be in accordance with Council’s Standard Easement document.
Condition 39 - Fencing
39.   A permanent fence must be constructed along the interface of the development site with
      the land area to be dedicated. The fence must be constructed in accordance with an
      Operational Works approval and must be to the following specifications:
      a.   1.8 metres high
      b.   Durable Chainwire
      c.   Educational Signage for wetlands protection
Applicant’s Request
The applicant requests modification of the condition to reflect a revised wetland fence which is
proposed to comprise a 2.1 metre high pool fence with vertical bars at 100 centres from ground
to top. This fence type has been detailed on the previously submitted plans and the vertical
fencing is required as the chain wire fence detailed in the condition is climbable by residents and


                                                                                    Page 37 of 84

Section 38

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018


not able to be utilized in association with dementia care. The condition is requested to be
amended to accordingly.
      A permanent fence must be constructed along the interface of the development site with
      the lands area to be dedicated. The fence must be constructed in accordance with an
      Operational Works approval and must be to the following specifications:
      a.   2.1 metre high
      b.   Pool fence with vertical bars at 100mm centres (or similar)
      c.   Educational signage for wetlands protection.
Assessment
It is recognised that the requirement for a chain wire fence creates the opportunity for residents
to climb the fence. This is not a desirable outcome for a dementia care facility as ensuring that
residents are safely contained is an important element of dementia care. The proposed change
to the condition is supported as the amended fence will provide a suitable practical outcome and
address the intent of the condition. It is recommended that the condition be amended as follows:
39.   A permanent fence must be constructed along the interface of the development site with
      the land area to be dedicated. The fence must be constructed in accordance with an
      Operational Works approval and must be to the following specifications:
      a.   2.1 metre high
      b.   Pool fence with vertical bars at 100mm centres (or similar)
      c.   Educational signage for wetlands protection.

4.    CONSULTATION
4.1. Referral Agencies
Not applicable
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
    Co-ordinator, Operational Works
    Environment Officer
The application was also reviewed by Council external consultants for Water Quality and
Quantity and Traffic Management.

5.    CONCLUSION & REASONS FOR DECISION
The applicant has made representations to a Preliminary Approval for a Material Change of Use
– Multiple Housing - Type 3 Retirement and Special Needs which was issued on 21 August 2018.
The applicant has provided plans which generally comply with the required amendments. The
amendments have resulted in the removal of development below the Q100 flood line and
reduced the development from an additional 48 beds in 6 accommodation villas to an additional
32 beds in 4 accommodation villas. Therefore, a Development Approval may now be issued.
It is further recommended that the area to the east of the car park and a lawn and paved area be
excluded from the area to be dedicated as Environmental Park and that conditions relating to the
type of wetland fencing, approved technical reports and the area of the drainage easement be
amended and updated to reflect the new plans and reports.




                                                                                   Page 38 of 84

Section 39

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


Departments/Sections Consulted:

   Chief Executive Officer        Community Services                      Corporate Services
   Executive Officer              Community Development                   Financial Services
   Executive Support              Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

   Executive Services         x   Environment & Sustainable Development   Infrastructure Services
   Community Engagement           Building & Plumbing Services            Asset Management
   Customer Service           x   Development Assessment                  Buildings and Facilities
   Governance                     Economic Development                    Civil Operations
   People and Culture         x   Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 39 of 84

Section 40

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                 6 NOVEMBER 2018


5                        MCU18/0102 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
                         FOR VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL (122 BEDS) AT 16 MARY
                         STREET, NOOSAVILLE
DOCUMENT INFORM AT ION




Author                              Coordinator Planning, Patrick Murphy
                                    Environment and Sustainable Development Department

Index                               ECM/Application/MCU18/0102

Attachments                         1.    Proposal Plans



         APPLICATION DETAILS
         Applicant                                Bounce Hostel Noosa Pty Ltd ATF The Bounce Hostel Unit Trust
         Proposal                                 Material Change of Use - Visitor Accommodation - Type 4
                                                  Conventional (122 beds)
         Properly Made Date                       26 June 2018
         Information Request Date                 18 July 2018
         Information Response Date                20 August 2018
         Decision Due Date                        29 November 2018
         Number of Submissions                    5
         PROPERTY DETAILS
         Property Address                         14 – 16 Mary Street Noosaville
         RP Description                           Lot 3 RP 122928
                                                  Lot 4 RP 122928
         Land Area                                1148m²
                                                  1148m²
         Existing Use of Land                     Not for profit charity shop and Classic Malibu surf shop
         STATUTORY DETAILS
         SEQRP Designation                        Urban Footprint
         Locality                                 Noosaville
         Zone                                     Business Zone – Mary Thomas Street Precinct
         Overlays                                 Natural Hazard Overlay – Flood Hazard and Acid Sulfate Soils
         Assessment Type                          Impact

RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 6 November 2018 regarding Application No. MCU18/0102 for a
Development Permit for Material Change of Use - Visitor Accommodation - Type 4 Conventional
(122 beds) situated at 14-16 Mary Street Noosaville and:
A.                       Approve the application in accordance with the following conditions:




                                                                                                      Page 40 of 84

Section 41

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


    PLANNING
    When Conditions must be Complied With
    1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
         prior to the use commencing, and then compliance maintained at all times while the
         use continues.
    Approved Plans
    2.   Development undertaken in accordance with this approval must generally comply
         with the approved plans of development. The approved plans are listed in the
         following table unless otherwise amended by these conditions.
          Plan    Rev.   Plan/Document Name                                       Date
          No.
          A.01    B      Site Plan, by Zest Building Design                       31.07.2018
          A.02    B      Basement Floor Plan, by Zest Building Design             31.07.2018
          A.04    B      Floor Plan – Level 2, by Zest Building Design            31.07.2018
          A.05           Dimensional Plan – Level 1, by Zest Building Design
          A.06           Dimensional Plan – Level 2, by Zest Building Design
          A.07    B      Elevations, by Zest Building Design                      31.07.2018
          A.08    B      Elevations, by Zest Building Design                      31.07.2018
          A.09    B      Building Sections, by Zest Building Design               31.07.2018
          A.015   A      Roof Plan, by Zest Building Design                       31.07.2018
    3.   Development authorised by this approval must be undertaken generally in
         accordance with the Approved Plans listed within this Decision Notice. The Approved
         Plans must be amended to incorporate the amendments listed within this Decision
         Notice and resubmitted to Council prior to the issue of any Development Permit for
         Operational Works*
         a.   The southern pavilion must be reduced in height so that the main entry roof
              does not exceed 8.80 metres above both finished and natural ground levels.
         b.   With the exception of the main entry roof of the southern pavilion the maximum
              height of the development must not exceed 8.40 metres above finished and
              natural ground level.
         c.   A minimum 600mm eaves must be provided to the full extent of all buildings.
         d.   The northern elevation must include variation of colours and materials to
              provided increased articulation.
         e.   The length of the acoustic fence on the western boundary must be extended for
              the full length of the western boundary. A 2.0 metre high acoustic fence must
              be installed for the full length of the northern boundary.
         f.   Windows to the upper level of the western and northern elevations must be
              fixed and acoustically double glazed.
         g.   All buildings must have a roof pitch of at least 5 degrees.
         h.   No retaining walls or planter beds are to be constructed in the road reserve.
         *(Refer to Advisory Note)
    Nature and Extent of Approved Use
    4.   122 beds are approved for the Visitor Accommodation Type 4 – Conventional (visitor
         hostel). The approved Gross Floor Area is 1084m2. No pavilion may exceed 300m2 of
         Gross Floor Area.
    5.   The approved accommodation units must be used for short term visitors only. The
         approved units must not be occupied by persons for the purpose of permanent
         accommodation.
    6.   The café must not operate outside the hours of 7am to 7pm.

                                                                                   Page 41 of 84

Section 42

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             6 NOVEMBER 2018


    7.    Use of the pool/sundeck area must not occur outside of the hours of 7am to 7pm.
    8.    The café, pool and sundeck must only be available for the residents of the visitor
          accommodation use and must not permitted for use by persons not staying in the
          visitor hostel.
    9.    Service vehicle movements on the premises (including loading and unloading) must
          not occur outside the hours of 7am to 6pm Monday to Saturday and not at all on
          Sunday or public holidays.
    10.   Amplified music must not be audible at the boundaries of the site between 10pm and
          7am.
    Building Height
    11.   The maximum height of the southern pavilion must not exceed 8.80 metres above the
          finished ground level and the natural ground level. All other pavilions must not exceed
          8.40 metres above the finished ground level and the natural ground level.
    12.   Certification must be submitted to Council from a Licensed Surveyor which certifies
          that the buildings do not exceed the maximum height requirement of this Decision
          Notice.
    Landscaping
    13.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval, the Planning Scheme Policy 3
          Landscaping Plants and Guidelines for that specific area and must include in
          particular:
          a.   the works shown on the approved site plan.
          b.   a minimum 2.0 metre wide landscaping strip along the Mary Street road
               frontage of the subject site, exclusive of the access driveway, generally
               uncompromised by infrastructure items.
          c.   A minimum 1.5 metre wide landscaping strip along the full extent of the eastern
               and western boundaries.
          d.   a 3.0 metre wide vegetated screening of northern elevation of the northern
               pavilion from the adjoining properties in Anne Street, designed such that
               vegetated screening will be provided within 3 years of the plantings occurring.
          e.   vegetated screening of the acoustic barrier adjacent to the western boundary in
               accordance with the conditions of this Decision Notice
          f.   vegetated screening of any electrical transformers, bin storage areas and the
               like from the road frontage
          g.   provision of 1 street tree within the road reserve for every 8 metres of road
               frontage
    14.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed to
          grow to full form and be refurbished when its life expectancy is reached.
    Performance Bond
    15.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
          must be submitted to Council, to secure performance of all conditions of this
          approval, prior to the issue of a Development Permit for Operational Works. The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit. Council reserves the right to call upon the bond or guaranteed sum to
          effect compliance with conditions.

                                                                                  Page 42 of 84

Section 43

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018


    Street Identification
    16.   The street address of the development must be clearly visible and discernible from
          the primary frontage of the site by the provision of a street number and, where
          appropriate, the building name.
    17.   The building entrance or reception area must be clearly visible and identifiable from
          the street or otherwise provided with signage and lighting at strategic locations to
          direct people to the building entrance.
    Water & Sewer Connections
    18.   An underground connection to reticulated water and sewerage must be provided to
          the development site in accordance with the standards and requirements of Northern
          SEQ Distributor–Retailer Authority (Unitywater).
    19.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to the development site.
    Building Appearance
    20.   All air conditioning units or other mechanical equipment must be located at ground
          level, or otherwise fully enclosed or screened such that they are not visible from the
          street frontages nor adjoining properties.
    21.   All deck and balcony areas above ground floor must not be enclosed by permanent
          fixtures such as shutters, louvres, glass panelling or the like, except where required
          to satisfy any privacy condition of this Decision Notice.
    Advertising Devices
    22.   Advertising devices must comply with the requirements of the Advertising Devices
          Code.
    23.   Construction signage, including that on hoardings, shade cloth and cranes but not
          including statutory safety signage, shall not exceed a total of 4m2 to each of the site’s
          street frontages.
    Fencing and Walls
    24.   Any street fencing must be setback an average of 1 metre from the front property
          boundary. Any fencing on the front boundary must either:
          a.    not exceed a maximum height of 1.2m
          b.    be of open construction.
    25.   The area of land between the fence and the front property boundary must be densely
          landscaped to screen any fencing from the street.
    Clothes Drying Areas
    26.   Each rooming unit must be provided with access to an outdoor clothes line which is
          screened from public view.
    Protection of Privacy
    27.   To ensure privacy is protected between adjoining properties, any window/s, deck or
          the like that overlooks or has the potential to overlook the private open space or
          habitable room windows of neighbouring properties must either:
          a.    have a minimum window sill height or 1.5 metres above floor level
          b.    be fitted with translucent glazing
          c.    be fitted with a fixed external screen


                                                                                   Page 43 of 84

Section 44

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             6 NOVEMBER 2018


    Communal Recreation Areas
    28.   Communal recreation area/s must be provided as shown on the approved plans.
    Amalgamation of Lots
    29.   Lots 3 and 4 on RP 122928 must be amalgamated prior to the commencement of
          use.
    ENVIRONENTAL HEALTH
    Amenity
    30.   The development must be undertaken and operated in a manner that causes no
          detrimental effect upon the amenity of the neighbourhood by reason of the creation of
          excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
          odours) nuisance or any other emissions in accordance with the nuisance provisions
          of the Environmental Protection Act 1994.
    Noise Nuisance
    31.   Noise emission from mechanical equipment shall comply with the following
          requirements:
          a.    Air-conditioning and Refrigeration
                i.     7am to 10pm: Maximum background + 5dB(A)
                ii.    10pm to 7am: Maximum background + 3dB(A)
          b.    Pumps
                i.     7am to 7pm: Maximum background + 5dB(A)
                ii.    7pm to 10pm: Maximum background + 3dB(A)
                iii.   10pm to 7am: No audible noise.
    32.   Air conditioning units and swimming pool filtration plant shall be located within the
          undercover carpark.
    33.   Kitchen exhaust points for the development must be located and operated in
          accordance with Australian Standard AS1668.2-2002 “The use of ventilation and air-
          conditioning in buildings” (specifically Section 5.10 – Air Discharges).
    34.   Submission of written certification from a suitably qualified person confirming that the
          noise levels from all mechanical equipment comply when measured at either the
          residential boundary or outside the most exposed part of an affected building,
          whichever is the closest to the equipment.
          The assessment and certification is required immediately after installation of the
          equipment and prior to any occupation of the building, and in a format approved by
          Council. All equipment should be operating at the same time to test the overall noise
          level created.
    35.   Entertainers or speakers used to amplify noise must not be located in any of the
          outdoor recreational areas (pool, space sundeck, and sun lounges, multi-
          purpose/flexible lounge/outside deck).
    Outdoor Lighting Devices
    36.   Lighting associated with the use must be designed, sited, installed and tested to
          comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the
          obtrusive effects of outdoor lighting” using a control level of 1.
    37.   Certification must be submitted to Council from a qualified person which certifies that
          all outdoor lighting devices comply with the requirements of this Decision Notice at
          the time of commissioning.

                                                                                   Page 44 of 84

Section 45

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


          For the purpose of certifying outdoor lighting devices for the development, a qualified
          person is:
          a.      Registered Professional Engineer of Queensland;
          b.      an environmental or electrical design consultant with a minimum of 3 years
                  current experience in the field of outdoor lighting.
    Building Demolition/Removal/Relocation
    38.   Where the development involves the removal, relocation or demolition of a building, a
          Waste Management Plan (construction and demolition) in accordance with Planning
          Scheme Policy 11, Waste Management Plans must be submitted and approved by
          Council’s Environmental Health Officer prior to issue of a development permit for
          operational works for demolition, removal or relocation of any building other than a
          shed.
          The purpose of the Waste Management Plan is to facilitate the segregation of waste
          for the effective reuse and recycling of such materials. Segregated wastes attract
          significantly reduced disposal fees at the landfill with some items free. Higher gate
          fees are charged for mixed waste.
          Waste storage areas must provide adequate separation of all reusable, recyclable
          and waste materials. These must be located so that they are convenient and safe to
          use.
          The Plan must contain the following information:
          a.      The site area for the storage and separation of waste is to be shown on the
                  plan drawings accompanying the application.
          b.      A waste management table as indicated below is to be completed showing how
                  waste material is to be segregated - recycled – reused or disposed.
          c.      Table – Waste Management Table
               MATERIALS ON-SITE                               DESTINATION
                                                   Re-use and Recycling               Disposal
     Expected waste            Estimated         On-site            Off-site           *specify
     materials                 volume(m³)   *specify proposed      *specify        contractor and
                                             re-use or on-site  contractor and      landfill site or
                                            recycling methods   recycling outlet   other disposal
                                                                                         site
     Excavation material
     Green waste
     Bricks
     Concrete
     Timber-please specify
     Plasterboard
     Metals - please specify
     Asbestos
     Other - please specify
    Note * If a demolition contractor is undertaking works, then the Waste Management table is
    to be completed by the demolition contractor.
    WASTE
    39.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial
          and Industrial Premises". The facilities must include an external impervious area
          correctly sized for all refuse and recycling containers and suitably screened from
          public places and neighbouring properties. A bin wash area is required with a cold-
          water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain

                                                                                     Page 45 of 84

Section 46

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            6 NOVEMBER 2018


          outlet must be designed to prevent storm water entry to the sewerage system. This
          can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide (max
          0.5m2) , or alternatively the waste area can be roofed, or any other design approved
          by Council.
    40.   Refuse containers must be provided in accordance with the requirements of the
          Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
          Regulation 2000, for the storage and collection of refuse.
    41.   Bins must be provided throughout the site to reduce littering. All bins provided must
          be for refuse and recycling and be decanted into the bulk bins by the site operators.
    ENGINEERING
          Site Specific Conditions
    42.   The proposed flood barrier must be of a design that is activated by the rising flood
          levels and the associated hydraulic differential to raise and lower the barrier. The
          barrier must not require a power supply or human intervention. The barrier must be
          maintained by the property owner in accordance with the manufacturer’s
          specifications. The works must be undertaken in accordance with an Operational
          Works approval and must include in particular:
          a.   Certification from a Registered Professional Engineer of Queensland (RPEQ)
               that states that the design of the barrier is suitable for its intended use.
    43.   The development must include an internal stairwell connecting the basement level to
          the upper floor. The stairwell must be located and constructed to provide an escape
          route for people to evacuate the basement in the event the barrier and/or pump
          system fails. Plans submitted as part of any subsequent operational works and
          building permit must clearly indicate the stairwell.
    External Works
    44.   Mary Street must be upgraded for the length of its frontage to the subject site. The
          works must be generally in accordance with drawing number 17699-SK100 Revision
          A prepared by TOD Engineers and Project Managers dated 17 August 2018. The
          works must be undertaken in accordance with an Operational Works approval and
          must include in particular:
          a.   construction of new kerb and channelling offset 7.5m (3.5m lane and 4m of
               cycle lane/parallel parking) from the northern side of the existing landscaped
               median;
          b.   suitable transitions from the new kerb line to join with the existing kerb at the
               western and eastern end;
          c.   landscaping of the verge area;
          d.   construction of a pedestrian footpath in accordance with the conditions of this
               Decision Notice;
          e.   removal of the existing property accesses and reinstatement of the kerb,
               footpath and verge area to match the balance of the site frontage, including the
               provision of topsoil and turf where the existing verge is grassed.
          Condition 44 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
          infrastructure.
    Site Access and Driveways
    45.   A sealed access driveway must be provided from Mary Street to all parking and
          manoeuvring areas of the development. The works must be undertaken in
          accordance with an Operational Works approval and must include in particular:


                                                                                 Page 46 of 84

Section 47

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            6 NOVEMBER 2018


          a.   driveway crossovers generally in accordance with Council’s Standard Drawing
               Number RS-051 and any associated addendum.
          b.   suitable safety measures, including warning signage, to improve driver
               awareness of the flood barrier, service vehicles and pedestrians and to
               enhance driver and pedestrian safety. Warning signage must be provided near
               the exit ramp from the underground parking area and the guest/service area to
               warn motorists of pedestrian movement along the frontage street.
    Car Parking
    46.   A minimum of 17 car parking spaces, inclusive of 1 courtesy bus space, must be
          provided and marked on the site and made available and accessible at all times while
          the use is open for business. The works must be undertaken in accordance with an
          Operational Works approval and must include in particular:
          a.   13 customer parking spaces (including 4 scooter spaces) within the total, which
               are clearly marked for that purpose and accessible at all times for visitor use.
          b.   3 staff parking spaces within the total, which are clearly marked for that
               purpose.
          c.   1 courtesy bus space within the total.
          d.   2 disabled parking space/s within the total.
          e.   dimensions, crossfalls and gradients in accordance with Australian Standard
               AS2890: Parking Facilities.
          f.   Provision of 20 bicycle parking spaces.
    47.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
    48.  Directional signage must be provided to direct visitors and customers to the car
         parking spaces provided on site.
    Service Vehicles
    49. Service vehicle parking, manoeuvring and standing spaces must be provided on the
        site. The works must be undertaken in accordance with an Operational Works
        approval.
    Pedestrian and Bicycle Facilities
    50.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.   a 2 metre wide footpath within the road verge for the entire length of the site’s
               frontage to Mary Street.
          Condition 50 is imposed pursuant to s128 of the Planning Act 2016 being necessary
          trunk infrastructure identified by Council’s LGIP to service the development.
    Stormwater Drainage
    51.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and must include in particular:
          a.   the works shown on drawing number 17699-SK101 Revision A prepared by
               TOD Engineers and Project Managers dated 17 August 2018, with the inclusion
               of the following:
               i.    The storage tank must have sufficient capacity to cater for the runoff from
                     the driveway in a 1%AEP rain event as a minimum.
               ii.   A back up power system for the pump that is independent of the mains
                     network.

                                                                                 Page 47 of 84

Section 48

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             6 NOVEMBER 2018


    Acid Sulfate Soils
    52.   All works must be carried out in accordance with an Acid Sulfate Soil and
          Groundwater Management Plan for the development prepared by a qualified person*
          and referenced in a Development Permit for Operational Works. The Acid Sulfate Soil
          and Groundwater Management Plan must specifically address how lowering of the
          groundwater level as a result of the works will be avoided.
          *(Refer to Advisory Note)
    53.   All waters, including stormwater runoff, groundwater seepage and leachate from acid
          sulfate soils must achieve the following quality prior to release from the site:
          a.   a pH range of 6.5-8.5 pH units
          b.   50mg/L maximum total suspended solids concentration
          c.   0.3mg/L maximum total iron concentration
          d.   0.2mg/L maximum total aluminium concentration
          e.   no visible plume at either the point of release from the site or within a
               waterway
    54.   The basement must be designed and constructed as a water excluding structure in
          accordance with Australian Standard AS3735 "Concrete Structures for Retaining
          Liquids" to ensure groundwater does not enter the basement after construction is
          completed.
    55.   All treated material must undergo verification testing at the rate of one sample per
          250m3 throughout the duration of the excavation phase of the development. The
          verification testing must be undertaken by a qualified person* using the SPOCAS
          or Chromium Reducible Sulphur testing suite, and the results must be submitted
          to Council for appraisal.
    Electricity and Telecommunication Services
    56.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    57.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Earthworks and Retaining Walls
    58.   All earthworks must be undertaken in accordance with an Operational Works
          approval, and contained entirely within the subject site unless written permission from
          the respective landowner(s) is provided to Council.
    59.   All retaining walls must be designed and constructed in accordance with the planning
          scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
          retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
          with a commercial grade safety fence.
    Preparation of a Preliminary Construction Management Plan
    60.   A preliminary Construction Management Plan must be submitted with the Operational
          Works application and must address the following:
          a.   traffic management during all aspects of the construction phase including:




                                                                                  Page 48 of 84

Section 49

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            6 NOVEMBER 2018


                i.     a Traffic Management Control Plan in accordance with the Manual of
                       Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                       and traffic control measures prior to construction
                ii.    maintenance of safe pedestrian access for the areas affected by the
                       works during and after daily construction has ceased
                iii.   proposed fencing to the site during the construction phase of the
                       development
                iv.    approval of the Traffic Management Control Plan by the Department of
                       Transport and Main Roads (DTMR) for any works on State controlled
                       roads
                v.     provision for worker car parking
           b.   maintenance and protection of water quality and existing drainage lines through
                the construction site, through the implementation of appropriate erosion and
                sediment control measures
           c.   works programme identifying key components of the works and their respective
                durations
           d.   establishment of a communication protocol with the general public, adjoining
                owners, emergency services and local businesses to advise of agreed
                construction times, impacts on traffic, services and other relevant issues
           e.   identification of complaint management procedures including:
                i.     contact details for the on-site manager
                ii.    dispute resolution procedures
           f.   details on the location of external fill/dump sites, the haulage route, type of
                vehicle to be utilised during filling operations and frequency of usage. NB any
                damage to the existing road system as a result of haulage operations shall be
                fully repaired at the applicant’s expense .
           g.   it is acknowledged that the preliminary Construction Management Plan will be a
                draft document requiring finalisation upon appointment of the Principal
                Contractor employed to construct the works and a final document will be
                required to be submitted at the Pre-Start Meeting for the project.
     Damage to Services and Assets
     61.   Any damage caused to existing services and assets as a result of the development
           works must be repaired at no cost to the asset owner at the following times:
           a.   where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
           b.   where otherwise, upon completion of the works associated with the
                development.
           Any repair work which proposes to alter the alignment or level of existing services
           and assets must first be referred to the relevant service authority for approval.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                 Page 49 of 84

Section 50

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            6 NOVEMBER 2018


REPORT
1.    PROPOSAL
The application seeks a Development Permit for a Material Change of Use of Premises to
establish a 122 bed hostel. The proposed use is defined under the Noosa Plan as Visitor
Accommodation Type 4 – Conventional. The development is proposed to be located over 2
existing Business Centre Zoned lots within the Thomas and Mary Street Precinct. The lots are
situated opposite the Noosa Village Shopping Centre.
The proposal consists of four two storey pavilions and a basement car park. Three pavilions
provide for the accommodation and guest facilities and an entry pavilion contains the
administration and management functions.
The basement includes 14 car parking spaces (including 1 bus space), 4 scooter spaces, bicycle
storage, communal laundry and a storage/data/communications room.
The ground level consists of:
   10 accommodation units consisting of 6 x 2 beds and 4 x 8 beds (total 44 beds);
   Male and female bathrooms;
   Communal kitchen, dining, lounge area;
   Reception area; and
   Centrally located pool, spa, sundeck and café.
The upper level consists of:
   15 accommodation units consisting of 10 x 4 beds, 1 x 6 beds and 4 x 8 beds (total 78
     beds);
   2 x lounge areas;
   Male and female bathrooms; and
   A Multi-purpose/flexible lounge area.
Setbacks proposed are –
   to Mary Street - between 6.0 metres and 13 metres.
   to the eastern side boundary -      Level 1: 3.60 metres        Level 2: 3.60 metres
   to the western side boundary -      Level 1: 3.175 metres       Level 2: 3.180 metres
   to the northern (rear) boundary -   Level 1: 3.985 metres       Level 2: 3.98 metres
The external finishes consist of a variety of materials including:
   painted weatherboard cladding
   timber batten screens
   Colorbond roof
   Openable shutters
   timber balustrading to Mary Street frontage.
Landscaping is generally proposed around the perimeter of the site, including screening trees
and shrubs.
The following images provide details of the proposed development.




                                                                                 Page 50 of 84

Section 51

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                 6 NOVEMBER 2018




                      Figure 1: Impression of front elevation




                             Figure 2: Basement Plan




                                                                    Page 51 of 84

Section 52

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA         6 NOVEMBER 2018




                           Figure 3: Level 1 Plan




                         Figure 4: Level 2 Floor Plan

                                                            Page 52 of 84

Section 53

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018




                              Figure 5: Southern and Western Elevations




                              Figure 6: Eastern and Northern Elevations

Full plans are included in Attachment 1.
The application material includes specialist reports and supporting documents comprising:
   Town Planning Report, prepared by Russell Green Strategic
   Engineering Report (Flood, Acid Sulfate Soils, Stormwater Management and Access and
     Car parking) by Tod Consulting
   Economic Impact Assessment, prepared by Sister City Partners
   Geotechnical Investigation, prepared by Core Consultants
   Noise Assessment Report, prepared by RoadPro Acoustics
The application is before Council due to the significance of the proposal.

                                                                                 Page 53 of 84

Section 54

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  6 NOVEMBER 2018


2.    SITE DETAILS
2.1. Background
The site was registered as a non-conforming use (NCU-5 February 1986) for retail sale of petrol,
fuel, oil, transport depot, storage facility, workshop and repairs in 1986.
In June 2014 written advice was prepared and as the non-conforming uses had not operated on
the site for some time, it was considered that these uses had been abandoned and the site no
longer had these use rights.
Currently there are two unapproved retail uses on the site (Classic Malibu and Smart Pups
Charity Shop).
2.2. Site Description
The site comprises two lots with a total area of 2,296m2 formally known as Lots 3 and 4 on RP
122928.
A large tin roofed shed occupies the front half of the site well setback from each side boundary. A
concrete surface extends from the road formation to the front of the building. The remainder of
the site is gravel surfaced. The site is relatively flat with screening vegetation adjacent to the rear
northern boundary. Vehicle access is obtained from Mary Street.
2.3. Surrounding Land Uses
North: Ann Street: Attached Housing zoned land which has been developed for detached
housing, duplex dwellings and multiple dwelling units.
South: Mary Street: Business Centre zoned land which has been developed for Dan Murphy’s,
Woolworths and Villa Noosa.
East: 18 Mary Street: Mary Street Professional Centre which accommodates professional
services including a lawyer and medical centre.
West: 12 Mary Street: a double storey residential dwelling.
2.4. Pre-lodgement meeting
A pre-lodgement meeting was held with the applicant in October 2017. Issues identified as a
result of the meeting included the inclusion of a basement car park given the site is subject to
flooding and the developments potential impact on amenity of adjoining residential properties
attributed to a break out zone adjacent to the rear boundary.
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    Planning Regulation 2017;
    The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and
raises no issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.

                                                                                       Page 54 of 84

Section 55

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


Planning Regulation 2017
The following assessment benchmarks from the Planning Regulation 2017 apply to the
application:
    SEQ Development Area
The proposal is for an urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the
provisions are relevant to the development.
Locality Provisions
The subject site is located in the Noosaville Locality and is zoned Business Centre Zone. The site
is also in the Mary Street and Thomas Street Precinct. The proposed use is required to follow an
impact assessable application process.
The Noosa Plan specifically identifies that the use of the subject site for the purpose of Visitor
Accommodation - Type 4 Conventional is a consistent use. In drafting the Noosa Plan it was
recognised that there were a limited number of backpackers in Noosa so a number of sites were
identified in the drafting of the Noosa Plan to accommodate future development for backpackers.
It is the only site within the Noosaville locality that is specifically identified for Visitor
Accommodation Type 4. The use supports Noosa’s tourism industry and provides a choice of
visitor accommodation, specifically low cost accommodation.
The proposal is generally consistent with the Overall Outcomes, Specific Outcomes and
Probable Solutions of the locality in regard to the intended built form, apart from the height of the
development. This includes
Overall Outcome 11.7.2
ss)   For the Business Centre Zone—
      iii   the Mary Street/Thomas Street Precinct, as shown on Map ZM8, provides a range of
            business facilities and services, which do not generate large volumes of traffic or
            require significant customer parking and which are accommodated in buildings of a
            domestic scale;
      Specific Outcome O85
      The predominantly residential character, scale and appearance of buildings in the Mary
      Street/Thomas Street Precinct is maintained and uses and buildings are designed and
      sited to —
      a)     present a domestic scale and form of architecture, rather than commercial, when
             viewed from the street and adjoining residential premises;
      b)     accommodate small-scale Business Uses that conform with the amenity of adjoining
             or nearby residential premises;
      c)     protect the visual and acoustic amenity of adjoining and nearby residential premises;
             and
      d)     provide for car parking at the rear of the site.
      Probable Solutions 85.1-85.4:
      S85.1 For existing buildings, development retains the general form and character of the
      building; AND
      S85.2 The GFA of any single building on the site does not exceed 300m2; AND
      S85.3 The maximum site cover is 50%; AND
      S85.4 Development retains large trees, including canopy trees, which add to the
      established character of the area.

                                                                                      Page 55 of 84

Section 56

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    6 NOVEMBER 2018


The planning scheme includes specific design requirements for the Mary Street and Thomas
Street precinct and seeks development of a domestic form and scale that is consistent with the
character of the area. The proposed built form is of a residential character consisting of 4
pavilions each less than 300m2 in gross floor area, reflective generally of a domestic form. The
residential character of the built form is also expressed through elements such as verandas,
glazing, shutters, transparent balustrading, eaves and a roof form with a pitch that is significantly
greater than 5 degrees.
Further to the stated outcomes for the locality there are performance based criteria for the
development to be assessed against. The table below details the proposal’s compliance with the
key development provisions of The Noosa Plan:
Criteria             Planning Scheme                    Proposal                         Complies
Population density   320 persons max per hectare =      (122 x 0.6) = 73.2                 
                     73.47
Gross Floor Area     GFA of any single building to be   Northern pod – 295.52m2             
                     max. 300m2                         Southern pod - 212.31m2             
                                                        Eastern pod - 277.05m2              
                                                        Western pod – 299.11m2              
Site cover           50%                                816m2 = 36%                         
Roof form            >5 degree roof pitches             >5 degree roof pitches              
Boundary setbacks:
Frontage (south)     6 metres min                       6.0 metres to front wall            
Side (east)          3.8 metres min (1/2 building       4.8 metres to Outer Most
Side (west)          height)                            Projection                          X
Rear (north)         3.8 metres min (1/2 building       3.6 metres                          X
                     height)                            3.175 metres                        X
                     6 metres min                       3.985 metres                        X
Building height
- in storeys         2 Storeys max                      2 Storeys                           
- in metres          10 metres max (Probable            9.50 metres (Probable               
                     Solution)                          Solution)
                                                        Specific Outcome                    X
Kitchen and dining   5% of GFA (54.2m 2) min            110 m2 combined                     
Common rooms         7% of GFA (75.88m 2) min           82.5m2 formal lounge areas          
                                                        110m2 flexible space
Communal sitting     8% of GFA (86.72m2) min            204 m2                              
areas
Reception area       12m2 min                           48 m2                               
Laundry              3% of GFA (32.52m 2) min           55 m2                               
Car parking          1 per 10 beds @122 beds = 12.2     10 car spaces and 4 scooter         
                                                        spaces in basement.
                     1 per staff @ 3 staff = 3          Additional area for 2 spaces
                     1 courtesy bus space               front of site = 13 spaces           
                     TOTAL = 15.2 spaces                3 staff spaces                      
                                                        1 bus space
                                                        TOTAL = 17 spaces


The development demonstrates compliance with the development provisions within the Noosa
Plan with the exception of height and front, rear and side setbacks.
With regards to height, the overall height of the development is excessive being 9.5 metres at its
highest point, substantially exceeding the height of other buildings in the precinct which average
approximately 8.4 metres and is likely to dominate the streetscape and appear out of place.
While the proposal does not exceed the Probable Solution’s maximum height of 10 metres for the
Business Centre Zone the proposed height is not consistent with the Noosa Plan’s Specific
Outcomes for height, as detailed below. Importantly development must meet the Specific
Outcomes and compliance with the Probable Solution does not mean that the Specific Outcome
is met. In this instance the relevant Specific Outcomes are:

                                                                                       Page 56 of 84

Section 57

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


      Specific Outcome 08 Height
      Buildings and other structures—
      a)    are low rise and have a visual bulk and an architectural scale consistent with
            structures on adjoining or nearby land;
      c)    do not visually dominate the street or surrounding spaces;
      d)    preserve the amenity of surrounding land;
      e)    ensure that development responds to the site topography; and
      f)    are well articulated with strong horizontal and vertical design elements to provide an
            interesting streetscape and to complement landform changes and landscapes.
The proposed development’s key heights from natural ground level are as follows:
   Roof Pitch main building to Mary Street – 9.5m
   Fascia / Gutter main building to Mary Street – 6.9m
   Roof Pitch rear building to properties in Elizabeth Street – 8.7m
   Fascia / Gutter rear building to properties in Elizabeth Street – 7.6m
Of particular concern are the maximum roof heights of the pavilions including the 9.5m roof
height of the main building facing Mary Street. The development to the east at 18 Mary Street
has been developed to a maximum height of 8.4 metres. Properties to the rear of the site in Anne
Street are zoned Attached Housing and are permitted to be developed to 8.0 metres in height.
The dwelling on the adjoining lot to the west is approximately 6.0 metres in height, though it is
noted that this site has not been developed to its full potential. The following image details the
subject site in the streetscape.




Buildings further along Mary Street and Thomas Street within the precinct have all been
developed at a lesser height than the proposed development to meet the scheme requirements
and vision for development in this precinct to be of a domestic form and scale.
It is acknowledged that in order to address the risk from flooding the floor level of the
development is required to be raised and in this instance it will be up to 900mm above the natural
ground level. Whilst raised floor levels can often result in increased building height the proposed
maximum heights are exacerbated by the significant roof pitches, 20 degree minimum, and the
substantial floor to ceiling heights. The development proposes a 3.3 metre floor to ceiling height
for the lower level and a 2.7 metre floor to ceiling height for the upper level. Due to concerns with
the height of the buildings the Information Request included a request for a visual representation
of the proposed building situated within the streetscape, including the surrounding buildings. The
applicant did not provide a visual representation stating that in their opinion this was not required
as the adjoining properties had not been developed to their full potential.
It is recommended that the height of the main building facing Mary Street not exceed 8.80 metres
from both finished and natural ground level and the remainder of the development not exceed
8.40 metres in height from both finished and natural ground level. These heights are generally
consistent with the height of the adjoining development to the east at 18 – 20 Mary Street and will
be more consistent with the streetscape due to the domestic building form and materiality of the
development.

                                                                                     Page 57 of 84

Section 58

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 6 NOVEMBER 2018


Furthermore, the presentation of the pavilion to the rear boundary in conjunction with the
significant wall heights is not consistent with the preferred outcomes for the locality. The height to
the fascia/gutter of this pavilion is 7.6 metres, with the roof being 8.7 metres.
The following image details the elevation which faces the rear boundary, and adjacent residential
properties.




The northern (rear) elevation of the pavilion adjacent to the rear boundary has a length of
approximately 30.8 metres. A central section of wall 15.8 metres in length is inset 300mm from
walls on either side. These walls are 7.5 metres in length. Further articulation is provided by
windows and shutters to each wall. A 300mm eave is provided to that part of the wall which is
inset 300mm. The amount of articulation to this elevation is limited. Whilst improved articulation
could be provided by the inclusion of additional windows and decks the resultant noise would
likely have a detrimental impact on the adjoining properties. As noted earlier in this report it is
recommended that a condition be included to reduce the building heights, and in this instance it
is also recommended that this pavilion be required to provide further articulation by variation to
the colours and materials of the northern elevation. It is also recommended that a condition be
included to require screening landscaping within the setback to assist in reducing the bulk of this
elevation and screening it to neighbouring properties.
With regards to the front setback the application seeks variation relating to an open sided roof
structure above the entrance stairs at Mary Street frontage which is proposed to be setback 4.8
metres in lieu of the required 6 metre setback. This variation is considered reasonable due to the
open form of the structure, the minor extent in relation to overall frontage length and the
significant extent of the development which is setback beyond the required 6 metres.
The variation to the eastern side is 200mm and relates to the upper and lower eastern elevation
of the eastern pavilion. The side wall of the pavilion to the rear of the site otherwise complies.
The minor variation is adjacent to a commercial development which is setback 2 metres from the
common side boundary. It is considered that the variation will not result in amenity loss. It is
recommended that a condition be included to require some separation to the adjoining property
with landscaping.
Similarly, the variation to the western side setback relates to the both the upper and lower levels
of the western pavilion. The setback is adjacent to an adjoining dwelling which is setback 2.0
metres from the common boundary. No objection has been received from the owners of this
property to the reduced setback or the development as a whole. The plans detail that the area
between the pavilion and the side boundary can be accessed via openable doors from the lower
level units. As the occupation of this area may result in noise impacts on the adjoining residential
property Council’s Environmental Health Officer has recommended the acoustic fence be
continued for the full extent of this boundary.
The variation to the rear setback is a consequence of a sewerage infrastructure which is located
between the front of the northern pavilion and the pool. The following image details the location
of the infrastructure:




                                                                                      Page 58 of 84

Section 59

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018




The applicant has advised that Unitywater did not consent to the construction of buildings over
this asset and thus the developable area in this portion of the site is constrained. The resultant
3.985 metre setback in lieu of the required 6 metre setback is considered reasonable as it
provides sufficient separation from the adjoining residential properties in Anne Street provided
the building height is reduced and landscaping is implemented. The setback area is not proposed
to be used for recreational purposes and provides sufficient area for meaningful landscaping to
be provided.
Amenity Impacts
The amenity of the surrounding residential properties is a key aspect to be considered when
assessing the application. Whilst the site is in the Business Centre Zone it is located within the
Mary Street and Thomas Street Precinct. The precinct is intended to provide a graduated
transition between business activities and the residential uses of the surrounding area. As such,
the Noosa Plan limits the scale of built form and night time use of non-residential uses in this
area. Notably, amenity was the primary issue raised in submissions received.
In response to amenity concerns raised in submissions the applicant has advised:
     As it gets later in the evening the outdoor areas will close and we will offer a few very
     straight forward options for guests which include:
          Go to bed.
          Move into dining area – This area is purposefully designed on the Southern side of
           the property where the business is located next door. It is as far away from the
           residential side as possible. When guests are using this area after hours the staff will
           make sure that all doors and windows are closed to eliminate noise for other guests.
          Offer free shuttles and/or buses to Hastings St. In general, this is the preferred option
           for the guests and staff. It is extremely effective in Sydney. The group departs
           together and return in small groups of twos and threes which is very easy to manage
           for overnight staff.

                                                                                     Page 59 of 84

Section 60

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              6 NOVEMBER 2018


With regards to the café the applicant advises:
     The proposal incorporates a small café of 15.88m2. The café is ancillary to the large
     kitchen facilities provided for guests and is intended to offer light food and beverage
     options for guests who are utilising the outdoor communal recreational facilities (pool,
     space sundeck, and sun lounges).
     It is intended that the café will operate every day from 7:00AM till 10:00PM. An application
     to obtain a liquor license (Commercial on Premises Subsidiary – Accommodation) will be
     applied for in due course and will be subsidiary to the accommodation use. This licence will
     provide for the entire premises to be licensed to provide for service to guests who are on
     site.
     A management and operational requirement set by Bounce to its guests is that no external
     alcohol can be consumed onsite in any public areas (pool, kitchen, outside areas).
     Bounces operational model is one that is mindful of not only adjoining properties but to
     those guests on site, so the management and control of alcohol consumption is strictly
     controlled so any perceived impacts are mitigated.
     The café is located within the centre of the site and is concealed from the street by the
     specifically sited pavilions. No external advertising for the café is proposed. The café is
     sized appropriately to cater to the hostel guests only and no provisions have been made to
     cater for external demand
An acoustic report has been submitted with the application which assesses the noise impacts
associated with the use sun deck/pool area. The methodology involves consideration of the noise
generated by 3 groups of 5 persons using this area. The report concludes that the surrounding
properties will not be unreasonably impacted by noise from the use. However, Council’s
Environmental Health Officer has identified concern with the methodology used for the report.
Considering the facility can accommodate up to 122 persons it is considered that the scale of
noise generation relied on by the report has been under estimated and does not sufficiently
reflect the potential acoustic impacts on surrounding properties. Furthermore, the report does not
address noise generation from within the building which contains bedrooms that can
accommodate up to 8 guests, communal lounge areas which can accommodate a significant
number of people and an open deck situated above the reception area. As such, the conclusions
of the report are not agreed with or supported.
Generally, the development has been designed in a manner to address potential amenity
impacts. The centrally located sun deck/communal area is surrounded by double storey built form
that faces internal to the site which will aid in containing noise. Nevertheless, given the site’s
proximity to residential uses and the inadequacy of the acoustic report, it is recommended that
conditions be included which limit the hours of the outdoor use area between 7am and 7pm and
the use of amplified music.
In accordance with the requirements of the Visitor Accommodation Code common rooms and
recreational facilities have been located at least 10 metres from land in residential zone. It is
noted that:
   a dwelling currently occupies the adjoining property at 12 Mary Street and that the lower
     level of the adjacent pavilion provides guests access to this area;
   the properties adjacent to the northern boundary are zoned Attached Housing and have
     been developed for residential purposes.
It is important that the amenity of these properties is protected. Accordingly, upon review of the
application, Council’s Environmental Health officer has recommended that the acoustic fence be
extended for the full length of the western boundary and an acoustic fence be constructed for the
full length of the northern boundary. It is recommended that treatment be provided to the building
to address noise impacts on the properties adjacent to the western and northern boundaries,
including non-openable windows and the use of acoustic double glazing. It is also recommended
that conditions be included requiring dense landscaping between the northern elevation of the

                                                                                   Page 60 of 84

Section 61

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


northern pavilion and the rear boundary. The inclusion of these design features will address the
visual and sound impacts emanating from the development.
With regards to the proposed cafe, the cafe is not visible from the street or adjoining properties
and is intended for the patrons of the hostel. The hostel also includes a substantial kitchen and
dining area for guests to provide for themselves. The hours of operation associated with the cafe
are not consistent with the Locality Code which seek that non-residential uses on land adjoining
a residential zone do not involve night time use.
In order to protect the amenity of the adjoining residential properties it is recommended that the
café’s hours of operation are restricted to between 7.00am and 7.00pm. It is also recommended
that a condition be included limiting the use of the café only to persons who are guests of the
visitor hostel.
Basement
The proposal includes a basement car park which raises a significant engineering issue as there
is potential for the basement to be inundated with runoff and flood waters during significant rain
events. The Noosa Plan addresses the issue in:
The Noosaville Locality Code:
     Specific Outcome O17 Flooding and drainage
     Buildings and other works are designed and sited to—
     a)    provide flood free access to premises and flood free habitable areas;
     b)    allow only minor, short term and infrequent flooding of non-habitable areas;
     c)    ensure carparking areas can be adequately drained;
     d)    ensure drainage does not adversely impact upon other premises; and
     e)    ensure filling or excavation does not adversely impact upon other premises by
           i.     causing ponding on the site or nearby land;
           ii.    increasing flooding, which adversely affects the safety or use of any land
                  upstream and downstream; and
           iii.   adversely affecting the flow of water in any overland flow path.
The Residential Uses Code:
     Specific Outcome O8 Basement drainage
     Buildings and access works are designed and sited to protect persons and property in the
     event of a flood and power failure.
The Driveways and Carparking Code
     Specific Outcome O21
     Carparking areas are designed to ensure drainage without the use of pumps or other
     electrical apparatus
The Natural Hazards Overlay Code
     Development siting and design Specific Outcome O17
     Development provides that for all flood events up to and including the defined flood event
     a)    the safety of people on the site is protected;
     b)    the capacity to use land in the flood plain is not adversely affected; and
     c)    the risk of damage to property on the site is avoided or minimised as far as
           practicable.

                                                                                        Page 61 of 84

Section 62

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                6 NOVEMBER 2018


      Specific Outcome O20
      Development does not compromise the safety of people resulting from residual flood risk
      associated with events that exceed the defined flood event, up to and including the
      probable maximum flood
      Disaster Management O24
      Development supports, and does not unduly burden, disaster management response or
      recovery capacity or capabilities.
Council’s Development Engineer has reviewed the proposed use of a basement car park and
advises that the submitted engineering comments/plans indicate that it is not possible to
construct an access driveway to the basement that achieves the 1%AEP flood level immunity
without significantly impacting on the design due to the road/site levels and the location of the
sewer main that crosses the site to the rear of the basement. It is noted that the flooding in the
area of the site is essentially backwater (Flood Certificate dated October 2017 indicates velocity
of flood waters to be up to 0.5m/sec) and the site is not affected by wave and wind action
compared to a site on the river front.
To address the potential for flood water entering the basement the applicant proposes to install
an automatic flood barrier across the basement access driveway. The type proposed is a flood
barrier that uses the rising flood levels and the associated hydraulic differential to activate the
barrier and raise it into position. The type of barrier proposed does not require power or human
intervention to raise or lower the barrier.
It is considered that the barrier proposed does achieve:
The Noosaville Locality Code - Specific Outcome O17 (a) and (b)
The Residential Uses Code - Specific Outcome O8
The Natural Hazards Overlay Code – Specific Outcomes O17 (a), (b) and (c) and O20
The proposal also includes a grated drain and storage tank at the base of the driveway to collect
runoff from rain that falls on the driveway. The proposal is to pump from the storage tank up to
the Mary Street road formation. The proposal does not include a backup power source for the
pump. The submitted engineering comment indicates that there is potential in the event of a
prolonged power failure for the basement floor area to be inundated to provide extra storage. For
example if 500mm of rain was to fall during a power failure the basement floor would have a
depth of 53mm.
It is noted that other uses are proposed at the basement level (lift, communal laundry and
storage/data/comms). These areas may be inundated should the pump system not function.
It is recommended that conditions be included for the storage tank to have the capacity to cater
for the runoff from a 1%AEP event on the driveway and to include a backup power source for the
pump.
The proposed development does not include a stairwell from the basement to the upper floor.
There is concern that, should the barrier and pump system fail during a significant rain event, any
person in the basement will be trapped putting their life at risk. It is recommended that an internal
stairwell connecting the basement to the upper level be provided. It is considered that the
inclusion of the stairwell would address these concerns and achieve compliance with The
Residential Uses Code - Specific Outcome O8 and The Natural Hazards Overlay Code - Specific
Outcome O17 (a) and (c).
Overlays
The Natural Hazard Overlay applies to the site, Flood Hazard and Acid Sulfate Soils. The issues
relating to flooding have been addressed in the ‘Basement’ section of this report. The
recommendation includes relevant conditions to address acid sulfate soils.



                                                                                     Page 62 of 84

Section 63

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       6 NOVEMBER 2018


Land Use & Works Provisions
The application has been assessed against applicable codes. The pertinent issues arising out of
the assessment against the codes are discussed below:

 Code                     Discussion
 Visitor                  The proposed development is generally in accordance with the code, while the
 Accommodation            following further comments are made in regard to the compliance with the
 Code                     Overall and Specific Outcomes:
                               The indoor common areas and recreational facilities of the visitor hostel
                                 are located on both the ground floor and upper level of the eastern and
                                 western pavilions. Although these areas are within 10m of the adjoining
                                 properties each property is within the Business Zone. Conditions are
                                 recommended for the applicant to increase the length of the acoustic
                                 fence adjacent to the residential use on the adjoining property to the west,
                                 include dense landscaping between the northern pavilion and the rear
                                 boundary and for double-glazing (or equivalent sound suppressant
                                 construction) be included along the windows of this elevation. The
                                 inclusion of these design features will minimise the visual and sound
                                 impacts emanating from the development.
                               Conditions are recommended to control noise emanating from the visitor
                                 hostel by way of mechanical equipment and/or guests. In addition, a
                                 condition restricting the use of amplified music on-site is to be applied.
                               A condition is recommended addressing potential overlooking to the
                                 adjoining properties.
 Driveways &              The applicant has provided carparking which complies with the Probable
 carparking Code          Solution of the code for the use of 122 guests and 3 staff members.
                          The proposal plans also provide for 20 bicycle parking spaces. Shower facilities
                          are provided on site which can be accessed by staff.
4.    CONSULTATION
4.1. Referral Agencies
The application did not require referral to any Referral Agencies:
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
    Coordinator, Operational Works
    Environmental Health
    Waste Services
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. 5 properly made submissions were received. The following table provides a summary and
assessment of the issues raised by submitters.
Matters Raised                                     Comments
Location of the site is opposite Villa Noosa and   Not a planning related matter. However, most hostels
Dan Murphy’s which will encourage visitors to      in an urban environment will be within proximity of a
consume alcohol which is not a good idea           liquor outlet. The behaviour of guests will be managed
                                                   by the on-site manager whilst recommended
                                                   conditions address amenity.
Vehicle noise associated with guest arrival will   The access to the car park is provided from Mary
be excessive at night.                             Street and situated a substantial distance from the
                                                   residential zoned land to the rear of the site. As the
                                                   car park is a basement car park noise emanating from
                                                   persons in the car park will be limited.

                                                                                             Page 63 of 84

Section 64

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         6 NOVEMBER 2018


Matters Raised                                      Comments
The hostel will result in excessive noise in a      The amenity of the surrounding area is an
quiet area.                                         important consideration and it is noted that the
                                                    design of the development generally assists in
Air-conditioning units will result in noise         mitigating noise impacts. The recommendation
Parties and entertainment functions will result     includes conditions to further protect the amenity of
in noise                                            the area. These include:
                                                           Limitation on the use of the café and
                                                             outside areas to guests of the visitor
                                                             hostel;
                                                           Limitation on the hours the outside areas
                                                             and café can be used;
                                                           Limitation on the emission of           noise
                                                             associated with amplified music,
                                                           Acoustic double glazing to windows,
                                                           Screening vegetation
                                                           Acoustic fencing
There are existing backpackers and there is no      The site was identified at the inception of the Noosa
need for a backpackers in this area.                Plan as being suitable for the use of Visitor
                                                    Accommodation Type 4 Conventional (Hostel) and
                                                    provisions were specifically included within the plan
                                                    referring to the location. The Noosa Plan also
                                                    underwent extensive public consultation prior to
                                                    adoption. The visitor hostel use is a consistent use for
                                                    the site and will provide low cost visitor
                                                    accommodation to support Noosa’s tourism industry.
Insufficient car parking                            The proposal complies with the car parking
Existing car parking problems in the area           requirements of the Noosa Plan. Existing car parking
                                                    concerns within the area are not a result of the
                                                    proposed development.
Reduced setback and excessive bulk of the           It is noted that the bulk attributed to the northern
northern elevation will be visually obtrusive and   elevation may impact on the visual amenity of the
block cooling winds.                                adjoining properties in Anne Street. The
                                                    recommendation includes conditions which
                                                    reduce the building height, require the provision of
                                                    600mm eaves and the installation of screen
                                                    planting between the pavilion and the rear
                                                    boundary.

5.    CONCLUSION & REASONS FOR DECISION
The application is for use of 14-16 Mary Street for Visitor Accommodation Type 4 - Conventional
(visitor hostel). The use is identified within The Noosa Plan as a consistent use for the site. The
application seeks to develop 4 pavilions which are of a domestic appearance but considered
excessive in height and it is recommended the building heights be reduced. A basement car park
is proposed in an area which is subject to flooding. The applicant proposes a non-mechanical
barrier to stop flooding of the basement. This has been reviewed by Council’s Development
Engineer and accordingly the basement is supported subject to conditions.
The impact of the proposed use on the amenity of the surrounding area forms an important part
of the assessment. As a result of the form of the development, where the 4 pavilions are
situated around the central communal area, and proposed conditions it is considered that the
use can operate whilst preserving the amenity of the surrounding area.
The application does not raise any other significant planning, engineering, building or health
issues and is recommended for approval, subject to conditions.



                                                                                               Page 64 of 84

Section 65

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


Departments/Sections Consulted:

   Chief Executive Officer        Community Services                      Corporate Services
   Executive Officer              Community Development                   Financial Services
   Executive Support              Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                              x   Waste & Environmental Health            Revenue Services

   Executive Services         x   Environment & Sustainable Development   Infrastructure Services
   Community Engagement           Building & Plumbing Services            Asset Management
   Customer Service           x   Development Assessment                  Buildings and Facilities
   Governance                     Economic Development                    Civil Operations
   People and Culture             Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                       Page 65 of 84

Section 66

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 66 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA               6 NOVEMBER 2018

                    é                                                                       se a ies           :
                                                                                         ce age             .
                                                                                      oo      5            nee
                ie at                                                                     .  a     ;  P F ecw
                   eg ~~ -                                                                 ae ; J         r
                                                                                          we        Li.
          :                                                                               a see           =

                                                                                               Na
                  .   iy ir       Oe     } =                =    ae -: —    \         — ee:             i     # c *
                        hs     ae      iy   |  F               | te lad      |        dl             ™
                    ae coin dla           p          |   een) er                         cys,                   |
                          7    al   |     |    =               ‘4      Pees | et    —s

                                                                                =                    ae
                                                  —__—S—i—‘(— Ne        an   saat                                  f

                           BOUNCE NOOSA     __                            |          wawonintt—t_T—L_F ee       we le
                           =              ceed                         COVER SHEET                     _ A004
              —_           os             Fugiang Investments Pty Ltd                                18001   I~
                                                                   Page 66 of 84

Section 67

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 67 of 84

uU
                                                                          ia
                                                                          >
                                                                          Zz
                                                                          <
                  CHE fl Hau      THE iniairrnnian if  5       THEEUE     Zz
                 HT aE            i meer        HEL)  pL |
                 (UP RTTE HEISE   Genrer i aie | ag age Ds
                  bya Hy LG       tH iH ule fit       rt     |    if      5
                          an      Ga                  |p          OP)     |g
 i                boy        in    Hepp Pe ah                             a
 2         ef                                                             é
 :                           |             |           {Hy    =m          a
                                                      Hee            |    3
                                                            :    a:       =a
aS                       |        |       |           et         aig
  ii S                                                     |       /\ | 3
    i —_              te                                                  5
    i ie                {ke           10  Proposed tang, 2a”              m
      OS               eee                                     i
         PEE           3                           ey     |      AF       =
7)  Zilee   ;           te Dae             ‘ah     Ca          oar        z
a: BEIRS |             cree                ome,           1       RE      5
me Zetim          :           Es                      |    s 6 6| gee     >
(flr              oo:   §                  toy       #     ||  cael | 8
   Fe} a f                       |    :              ‘         \ ae       B
2 ca   = i                  Z                        y    |    (Sas       =<
a8 | 8 |              ae  to ee)                                   |      >
a      o ; P=      sem   18 Fo He i E |     im 3g 1 & | __j* y re
       7 ae   Saaj_xfe       st —————       hai   SS           og:
   S             |    =  :        .        a        7 Eg 4  L  b sca 2    o
   Oo          a                      ow   4        |     Be
5	1	1	1	32	7	2292	1832	34	28	19	S
4	1	1	1	33	0	311	1806	2015	128	-1	
5	1	1	1	33	1	311	1877	37	33	39	8
5	1	1	1	33	2	648	1874	293	60	44	ope)
5	1	1	1	33	3	1088	1802	145	157	30	6G
5	1	1	1	33	4	1165	1806	501	123	32	Se
5	1	1	1	33	5	1697	1835	410	96	33	Beal
5	1	1	1	33	6	2161	1802	80	157	84	|
5	1	1	1	33	7	2291	1864	35	64	61	8
4	1	1	1	34	0	149	1904	2177	98	-1	
5	1	1	1	34	1	149	1918	44	78	11	Z
5	1	1	1	34	2	199	1900	45	131	96	|
5	1	1	1	34	3	264	1904	109	68	45	tee
5	1	1	1	34	4	648	1933	118	50	26	fw
5	1	1	1	34	5	809	1917	61	85	12	gel
5	1	1	1	34	6	1625	1928	299	73	45	oS.
5	1	1	1	34	7	2075	1927	41	73	66	all
5	1	1	1	34	8	2188	1895	67	131	65	|
5	1	1	1	34	9	2292	1931	34	64	65	2
4	1	1	1	35	0	158	1970	2168	92	-1	
5	1	1	1	35	1	158	2000	35	62	62	>
5	1	1	1	35	2	497	2030	35	8	41	a
5	1	1	1	35	3	653	1991	16	37	0	a
5	1	1	1	35	4	774	2038	9	1	29	yt
5	1	1	1	35	5	808	2005	8	42	89	\
5	1	1	1	35	6	835	1970	34	82	21	i
5	1	1	1	35	7	937	1997	39	56	24	$=
5	1	1	1	35	8	1622	2002	25	46	37	i
5	1	1	1	35	9	1669	2001	30	33	54	x
5	1	1	1	35	10	1989	2033	8	1	0	r
5	1	1	1	35	11	2292	2000	34	59	0	m
4	1	1	1	36	0	158	2107	2168	112	-1	
5	1	1	1	36	1	158	2130	35	52	0	|
5	1	1	1	36	2	323	2124	64	50	66	2)
5	1	1	1	36	3	514	2144	18	12	46	|p
5	1	1	1	36	4	852	2107	18	112	36	Po
5	1	1	1	36	5	1630	2123	367	71	36	‘roe
4	1	1	1	37	0	159	2176	2167	81	-1	
5	1	1	1	37	1	159	2184	33	23	50	5
5	1	1	1	37	2	323	2177	36	80	12	&
5	1	1	1	37	3	497	2191	36	34	67	ty
5	1	1	1	37	4	714	2176	80	48	0	onic
5	1	1	1	37	5	990	2185	10	53	40	i
5	1	1	1	37	6	1630	2184	36	50	0	up
5	1	1	1	37	7	1743	2179	19	50	76	ba
5	1	1	1	37	8	1869	2214	10	13	0	:
5	1	1	1	37	9	2075	2196	33	38	45	“|
5	1	1	1	37	10	2291	2184	35	23	60	co
4	1	1	1	38	0	496	2271	1469	87	-1	
5	1	1	1	38	1	496	2271	33	87	12	be:
5	1	1	1	38	2	1160	2282	36	64	65	|
5	1	1	1	38	3	1209	2293	68	48	8	ssc
5	1	1	1	38	4	1362	2282	26	64	74	|
5	1	1	1	38	5	1587	2285	112	56	37	TE
5	1	1	1	38	6	1723	2281	79	78	21	Be
5	1	1	1	38	7	1940	2282	168	61	0	fn
4	1	1	1	39	0	891	2324	1227	161	-1	
5	1	1	1	39	1	891	2341	182	66	81	Ho,
5	1	1	1	39	2	1251	2350	18	38	16	5
5	1	1	1	39	3	1631	2344	73	50	53	a
5	1	1	1	39	4	1741	2324	211	161	0	Aarts
5	1	1	1	39	5	1869	2350	54	44	41	=

                                                               eH
            +          Hoe                        mid        Fe
           BO-| ---- 2981. -------------3------- yy HD -- - Lig
         ' - il?  fs FR s ee     aR                   Rev Me Se x
Go       e J        th STI tac                   = ES oces     \ +i d ;
pelle
5	1	1	1	44	2	755	2895	267	69	0	[Rioer
5	1	1	1	44	3	1724	2896	36	67	0	ni

Section 68

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 68 of 84

78 0 g9 abed
  4, [J vg       TOO8T                                                             »                    PT] Aig squauasaAu Bueibn4                  . a            NSISSO SNICTUINE
|     =<      as                                nonce          —                                                                  VSOON JONNOd
§                                                      !           —      °                                 °          °          AWVONNOG ALHSd0ud 305
                                                                |          |                                 |          |                                                        CFL t 1 92S
:                                      mae            PN                                                               f               soe        eee,             THAR LN3W3SV9
He                   2                                            |        |                                 |
z                    5                                 1     |                                                                                               a
:                    i          ‘a                     1     Ent      SINNOO / via                AwaNnv)                                                    3
                     3                    |                  :  E        / FDVYOLS               TWNAWWOO                                                    j
                                                       ot                                                         pe
                  am oe ee ee           i Lhe                                       perererreral             |            —-— - ——-- —_ - —_ - —__- - -g
                                          3            !                   |                                 |
                                          !            t      :
                                4         meen         ;                                                                                1g
                  3                                                   EIS P                                ii                           !    i
                                                       1      je anes ees   ,                                                           \    2
                                                                      yes |!                             yh!                            |
                   pa                                             th                                                     fe
                                 !                     1      ft           |           i                                                     1
                  .              |            biog           f              4                            ifs                                 t
                  .              |            RE       ls    ff            |                             UMA                                 :
                                 |            ipo      yf                  9
5	1	1	1	23	5	1891	1349	52	46	31	Gb!
5	1	1	1	23	6	2410	1352	1	33	84	|
4	1	1	1	24	0	843	1386	1568	35	-1	
5	1	1	1	24	1	843	1391	1	13	42	|
5	1	1	1	24	2	1157	1395	4	18	36	1
5	1	1	1	24	3	1268	1386	1	35	37	|
5	1	1	1	24	4	1460	1386	1	34	50	|
5	1	1	1	24	5	1905	1394	1	13	31	!
5	1	1	1	24	6	2410	1395	1	11	87	|
4	1	1	1	25	0	843	1443	1495	27	-1	
5	1	1	1	25	1	843	1454	1	16	81	|
5	1	1	1	25	2	1268	1450	1	14	76	|
5	1	1	1	25	3	1460	1443	29	26	50	1S
5	1	1	1	25	4	1915	1443	11	25	88	L
5	1	1	1	25	5	2337	1450	1	10	51	i
4	1	1	1	26	0	1406	1408	932	95	-1	
5	1	1	1	26	1	1406	1408	62	94	59	+
5	1	1	1	26	2	1896	1444	11	24	0	,
4	1	1	1	27	0	626	1515	1800	65	-1	
5	1	1	1	27	1	626	1566	9	14	43	3
5	1	1	1	27	2	843	1522	1	55	77	!
5	1	1	1	27	3	1268	1517	1	55	82	!
5	1	1	1	27	4	1451	1515	40	62	0	ly
5	1	1	1	27	5	1940	1515	4	62	54	|
5	1	1	1	27	6	1999	1538	10	25	73	L
5	1	1	1	27	7	2337	1535	1	32	59	|
5	1	1	1	27	8	2413	1537	13	36	0	r
4	1	1	1	28	0	623	1543	1802	141	-1	
5	1	1	1	28	1	623	1580	12	15	15	.
5	1	1	1	28	2	1268	1581	1	13	40	Lf
5	1	1	1	28	3	1314	1581	147	32	16	arses
5	1	1	1	28	4	1438	1577	26	51	54	1)
5	1	1	1	28	5	1736	1556	23	51	30	on!
5	1	1	1	28	6	1924	1543	38	141	2	Hl
5	1	1	1	28	7	1984	1578	26	49	8	é@
5	1	1	1	28	8	2413	1576	12	60	45	:
4	1	1	1	29	0	1011	1622	1328	62	-1	
5	1	1	1	29	1	1011	1623	38	34	11	|
5	1	1	1	29	2	1451	1622	4	62	90	|
5	1	1	1	29	3	1473	1633	18	25	69	€
5	1	1	1	29	4	1994	1633	18	25	86	€
4	1	1	1	30	0	632	1631	2472	112	-1	
5	1	1	1	30	1	632	1721	229	3	21	tof
5	1	1	1	30	2	1366	1721	23	2	14	ee
5	1	1	1	30	3	1764	1721	130	2	22	ee
5	1	1	1	30	4	1920	1631	110	92	20	aca
5	1	1	1	30	5	2121	1721	230	2	20	a
5	1	1	1	30	6	2373	1694	140	44	20	____
5	1	1	1	30	7	2551	1671	87	72	19	aa
5	1	1	1	30	8	2818	1708	27	18	57	oz
5	1	1	1	30	9	2858	1694	30	44	57	=
5	1	1	1	30	10	2898	1712	9	8	72	=
5	1	1	1	30	11	2913	1694	103	44	0	39¥HOLS
5	1	1	1	30	12	3021	1694	87	44	0	3TD/0IE
4	1	1	1	31	0	964	1697	2141	95	-1	
5	1	1	1	31	1	964	1729	197	57	2	pt
5	1	1	1	31	2	1406	1697	84	94	34	Te
5	1	1	1	31	3	2833	1742	12	50	21	+
5	1	1	1	31	4	2869	1740	236	52	5	cave
4	1	1	1	32	0	624	1776	2480	79	-1	
5	1	1	1	32	1	624	1830	10	15	0	g
5	1	1	1	32	2	964	1797	1	52	84	!
5	1	1	1	32	3	1941	1804	2	16	0	;
5	1	1	1	32	4	2178	1806	36	27	96	dn
5	1	1	1	32	5	2225	1776	90	79	68	duey
5	1	1	1	32	6	2916	1785	188	40	0	—/TOADOLOW
4	1	1	1	33	0	624	1834	2411	56	-1	
5	1	1	1	33	1	624	1847	11	15	59	3
5	1	1	1	33	2	832	1861	133	10	25	L_____4
5	1	1	1	33	3	1478	1849	11	25	0	L
5	1	1	1	33	4	2174	1834	136	56	11	sBINDIYSA
5	1	1	1	33	5	2606	1870	10	9	36	:
5	1	1	1	33	6	3028	1877	7	5	58	:
4	1	1	1	34	0	1157	1833	1949	97	-1	
5	1	1	1	34	1	1219	1917	47	11	25	lo
5	1	1	1	34	2	1941	1833	107	94	33	Le
5	1	1	1	34	3	2106	1833	2	94	79	|
5	1	1	1	34	4	2381	1887	50	24	44	=
5	1	1	1	34	5	2604	1884	12	39	68	of
5	1	1	1	34	6	2725	1826	76	113	88	|
5	1	1	1	34	7	2815	1867	291	51	55	se
4	1	1	1	35	0	1157	1931	1949	30	-1	
5	1	1	1	35	1	1157	1942	4	19	65	|
5	1	1	1	35	2	1212	1938	64	10	0	OULYIRE
5	1	1	1	35	3	2832	1935	13	17	71	8
5	1	1	1	35	4	2972	1938	8	8	83	=
5	1	1	1	35	5	2989	1931	66	29	0	Sauvd
5	1	1	1	35	6	3057	1931	49	29	54	YvD
4	1	1	1	36	0	859	1948	2246	142	-1	
5	1	1	1	36	1	859	1969	291	2	14	ee
5	1	1	1	36	2	1228	1948	136	142	19	im
5	1	1	1	36	3	1484	1955	123	39	0	———
5	1	1	1	36	4	2016	1969	17	2	92	=
5	1	1	1	36	5	2121	1969	412	2	0	—RVSSS—_V_—T—
5	1	1	1	36	6	2645	1966	27	24	41	-
5	1	1	1	36	7	2689	1950	22	44	41	—-
5	1	1	1	36	8	2833	1966	12	18	7	€
5	1	1	1	36	9	2950	1970	9	8	87	=
5	1	1	1	36	10	2962	1956	72	39	18	SWud
5	1	1	1	36	11	3037	1956	68	39	0	441s
4	1	1	1	37	0	1157	1994	1947	40	-1	
5	1	1	1	37	1	1157	2004	4	19	60	1
5	1	1	1	37	2	1273	1994	10	39	20	és
5	1	1	1	37	3	1452	2018	2	16	11	'
5	1	1	1	37	4	1941	2018	2	16	45	'
5	1	1	1	37	5	2106	2018	2	16	13	'
5	1	1	1	37	6	2829	1994	15	29	62	Tt
5	1	1	1	37	7	2972	2002	8	3	90	=
5	1	1	1	37	8	2989	1994	66	29	0	Sauvd
5	1	1	1	37	9	3062	1994	42	29	46	SNe
4	1	1	1	38	0	1157	2028	134	24	-1	
5	1	1	1	38	1	1157	2034	4	18	58	1
5	1	1	1	38	2	1277	2028	14	11	45	5)
4	1	1	1	39	0	1157	2056	1951	29	-1	
5	1	1	1	39	1	1157	2065	4	20	88	|
5	1	1	1	39	2	2903	2056	205	23	0	TSwuVd
5	1	1	1	39	3	2980	2052	36	36	62	UV
5	1	1	1	39	4	3031	2056	75	23	35	WIOL
4	1	1	1	40	0	1301	2291	1968	35	-1	
5	1	1	1	40	1	1301	2291	99	34	33	8L0¢
5	1	1	1	40	2	1416	2291	260	35	34	YAGINSAON
5	1	1	1	40	3	1693	2291	23	34	96	9
5	1	1	1	40	4	1916	2291	196	35	37	VONADV
5	1	1	1	40	5	2130	2291	203	35	0	DSNILASW
5	1	1	1	40	6	2350	2291	271	35	71	SSLLININOD
5	1	1	1	40	7	2636	2291	335	35	76	LNSINNOYIANS
5	1	1	1	40	8	2988	2291	30	34	65	8
5	1	1	1	40	9	3051	2287	158	51	29	DSNINNV
5	1	1	1	40	10	3215	2292	54	34	77	Id

Section 69

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 69 of 84

Wv@r col et wor pew   oo je
            ‘N)                                                                                  |   S 7°
               ~—-—-—-—-—-—-—-—-—- —- ee                                          ee               |    8
             i                                                                     i 3          [a      4/8
                                                                                    }                      S
             |                                                                    +             to         =
             |           a1                                                   ix                |
             |                blest       818            18     1S      Pssas                   1
                         ;                                                       ee             |
             '                                                                                  |     ~
             |                                                                                  aie
             '                                                                                  |  i  ws
             !                                                              Lj
             |                  |                                                                     lg
             |          “Toe in                                               Ts)               |     12].
 ©           |                                                                                  1     16       =
 Sf                     Sof                                                                     |    |e |
 co          '                                                               '                  |      Ww      ©
 a | |       |          Wil                                                                     |               2
 =                                                                      -                       1     e
 i           |                    =                                              g              |      Se      o
 5           |                    FE:                                                                  0
 z           |                    |                                              q                     Cc
 o           '                    ;                                     :                              5
            '                     |
            3           5                      —                           Pals]                i       lige
                                  !             A                                               :           z
 S|                               |                                         }                   |     lee
 =a        - |    |                             :          aN            [|        CY           '     &     E
          ie                                    a                                      mS            |e
              ——          OO                         ~      wu                         &        [
 S|          ip                                       f                                         y    |e
 Zz |      |)                                   _    i.
 fh        |                                               _f                                   rs
 =         7                                                                                    ine
 ra                                                           hy                                io
             |                                                4 i                                 ul   3
 E           |                                               tF3]                               1 Oi
 5                                                 —                                              Ol i
 oO                                                                                       a
                                                                                          z
 2                                                                                        a
 >                                                                                        <               3
fz                                                                                         ;              g
                                                                                          =               Z
 >                                                                                        _.              2
it                                                                                       rf
 0                                                                                        a
 O
 z
 >
 Ss
 =z
 a |
 a

Section 70

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 70 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                    6 NOVEMBER 2018

                                                                         =                           750
                                                                                    ete Soe        Se Se Se

                                               i                               Ul      u2 | us | u4 | us | We
                                     as        :     Down to basement                                                                                           3
                          a ge                 -     ot                     .               2       .        .        =       .              “Thr Ty)             lay     ye
                                 :             i                                                                                              _                           8
                                    als        8                               ENS    ins      ins      NS               ENS                          FEMALE    :         §
                                 /                                            i         im      “Th     |  te       t        +  a     —          :  4    \        . i z z
                          IEE                                        W,             Tannen nt                  ean"             +:                  f           |:
                                                       ”            +                      et                                          i         :
                            ; al ale                              Ho                                                              é               :
                                                       4           2                                                              3              T                      =
                                                                   BH rent cmct                                      |               5             U7                   a
                                                                                 wT 1                                    root
                                                                                                                                     i           Ue               ||    |?
                          a A) s] *) as                          :                   8p                         iat            ik                                | lag)
                                                    |                                                           } 2 SUN DECK         EE             Wis      ,          ;
                                                                  ¢     '        =m om                          ae                   ;
                                                                      eo                                                 7”          +e          p
                             | ot                                                                                    i               li             i
                               g| #8 3                        store |    i                                                                                        S
                          {qs                    {|    7              Pee                  THUR Goss                                                3           ;
                                                                           =                                        L.                See                           Ass 8
                                     aE         lee                  3]            PANTRY |” COLD ROOM COMMUNAL KITCHEN      ]                   tp    os         :
                                                 yo                            FT       A"                                                       ey     \         =                        z
                                                                                                                                             ont                                          a
                          Va).                    7                   i       :                            i         Err                     p=      BABA           EE
                                     ®          ae                    i       Z                                                             4 4 ee = mop                                   :
                                                                        i.                                                       t              j=          jf                             i
                          Ty | =           a    bi                                               pany                                                           3                          :
                   ———              Ss                         ee er rt                                                               oe       te       So                                 i
                                                                      130    S70          s1D     1340,   sa70         240     190                                                         a
                                            BOUNCE NOOSA                                         —                                       sour ons                  —      nee        cei
                                           =                        We16MARYSTRET            Le             @       DIMENSION PLAN - LEVEL 1                               A0S             4):
                                           =                        NOOSAVILLE QLD 4566       OUNC: &                                        -                          DA ISSUE           2
                       BUILDING DESIGN     ose                     Fugiang b    ents Pty tm                                                                         18001       Sr ry tee
                                                                                                           Page 70 of 84

Section 71

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 71 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                         6 NOVEMBER 2018

                                                             om        12    meso  .   20   .  =          xn      a]       70             mo         tm mat                  ma

                                      d  ale =| al?                          un | ue | up | wwe | ua | us                                   {ier                   4) als     77:
                                                  :                                                                                               =
                                   a                                                                                                                   FEMALE            i   q
                                         q   7;                       (MU.                                                 ,                        -     \        | faa
                                      :                                                2] ur     na00E!'                                              a                      5
                                                                                                                                                                             %
                                                                                                                                                                             &-
                                   z     ‘                                                                                                        ,   Ub                   i

                                                                                                                                                  ||  a7                   i
                                   a  ]  s]3 ]  E          onan ened          a                                                                                    BY aa] E >
                                                                                |                                                                     >                    bit

                                         ;

                                         tf                           i                               ey                          ToT                     FY       ails
                                   :     S|s                                                                        U20       _                       9  MALE         2       :
                                                                          Ci                                                     |                 Fs                 ah      :                    z
                                      i      |  32                                    U24]U23]U221      ounce                    |             wth                 |    +i    i                    :
                                         i                                  U25                                      U2          |                                    ;                            }
                                                     =F        m0     +f                                mar                                      7   +    ao   +
                             Plan                   tT I EE                                       EE                    TT     St         HH           SS    SS                                    i
                            TCUMENSION PLAN - LEVEL? a) ee," 7                =                          om                                          '         |                                   a
                                             BOUNCE NOOSA                                                                                       ee eee te
                     CAL                     ==                        Eee                        counceg                tivensoneun-uever2                                    ADB
                                            Sinahine Coast             ~no                                              Sewers                                                                     :
                       BUILDING DESIGN       oer                      Fugiang b     ents Pty ud                                                                            18001        5 ry tue
                                                                                                                Page 71 of 84

Section 72

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 72 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                  6 NOVEMBER 2018

                                      [ ie
                =e          -—-—|--—4 ee we - —- — -— - — -— Oe age    ee  a e —— — ——     oe   rei eee sm en ome eee
                5     a a                                                                                    sagen
                              rei                      |                     cei Tic            al        Mh
                  Te                   i                ~ ae                    ae               Se   tee    PL 6O00rn
                 a all       OS a                                      ee By lh | = Tal,               ;  | ‘Z
                        qo gh             3      :     |  T    a        :   J    =   Wd           i
                 / |     —     |   —      s  =            TH   7               TE    |            |     5

                        SOUTH ELEVATION                                                                   —

       a Vv                                                                  as ~~)                     ew
          Se i ao            <<    2      —                                      ———      ed      a          =    r
         ee eee ee ——     ,  ae  ae     Cn        nn        ene                a            i a         Bg nes Co     teva. 3 CBoMa
        -     ogo.                   t= fae                      a              a          oe                     r
      ie      =)         |         ime        oA      Be                Bee                                    ot
        acs        -—-— EE                 =      SS SS                               eh ——        ee                 wail.
      earl an                                         acne   cee                 ee                           La           |
          &   ate         |             E           —     —                                                    f |
       Cot    oh       As. |               |    uA        fa   5  i z    tl     Ht   ]  a.       \            je           ;
       o i hi RL eS EER eet a aa WA Oe                   a a                                     ss         3    |    fem
             EORATION                                                                                                      i
             Waues?                                                                                                meauiet 13 z
                           WEST ELEVATION
                                                                                                           5   intorreaton Request novo i
                             BOUNCE NOOSA                                                  sro —t_F—1_T =       —     — :
              eCAt           ———             NOOSAVILLE QLD 4566 bounce &   ELEVATIONS                         Aor         ;
                             =o              14-16 MARY STREET          vw  Ses                                    i       :
              Eaten aeoe    rr)             Fugiang Investments Pty Ltd                                     18001 9 ||
                                                                       Page 72 of 84

Section 73

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 73 of 84

v8 Jo ¢2 abed
 J Ld ZS TOO8T                              2           — “=                     an    NSISRO SNICTUING
z    anssi va                                            99Sb GTO JTIAVSOON  ania
1/7  s0'v                      SNOLLWATIS   @ POVNOG      ™ ausaaw art         ae   TVa
|e      ee DE         aipers                                          VSOON JONNO@
g mocico'te Ber beg omc .
2                                                                            NOILVA313 HIYON
i
i                                                                                         a woort
:        7 all      =  aH              RE REN NN — a                  RO               .     —_..
:        ae          |                      3     q                   LE   aaa
          Oy                         I                    q
          |)                         I                    ia                         |
        Seige foo np                         gn geo                               =          all
        oP    te     |
         __,          = -s & is                          s&s    i #=»          se =.         —
           $ a al    | —                                                 =    - _— €    ‘    ‘owng2 cmagt

                                                                                 NOUWARTISV3
   Bea    FUR ae a                              Seas             = a ees Se             et a
  ih   ll         a           | '                           :      | |           ll Ler
  Ppp ir” MOT noo              k_|                                              a    :     |
  ra es -—-         Ee rare             = =         =                               ee  -=-—      ="
  o 8   SNS         [2A Y Ca nV                                       yh             a    |    :
  Po    ak          ‘lip                        |   i     oe          ia             ig
   tp Dp  i                    le   PT                              =f              eee — 3 -— 4  eer ae
   ie EL Bn a                       bh a es tn     es Se Ss     SL Se ee      =o Ss     = —    Fe

                                   81L0¢ YHAEINSAON 9     VGNADV DNILSAAW SSLLINNOD LNSINNOUIANS SNINNV 1d

Section 74

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   6 NOVEMBER 2018




                                                      Page 74 of 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                  6 NOVEMBER 2018

                                                                       3              Selected colorbond custom          i                   yy
                                                                       ;                   ob roofing iron.              7
                                                                           e                 209.6m?                 .                        ;

                                                    Alin              |                                                                     es
                                                  ie     *       ¢                LL.                                                           e
                                                  |     *    :   #           :   e                                                        §
                                                  } 's                       5  | £                                                      38
                                                  | 2 custom orb roofing iron. *   2                                                         a      :
                                                  |       254.5m?        =      }                                                        3 $
                                                 |     “9    '   4%          i    et }                                                   3
                                                 |         reno                                                                             My
                                                 i  f       od hing tate                            ot tn ew                           + Il  i  :
                                                                                         ae                <|                :            !
                                                                       iy                orb roofing iron.          ee                                                                3
                                                                                            Tn                                                                                        3
                                            —                        ——$—S                                              =
                                           ROOF DRAINAGE PLAN                                                                                                                         ;
                                           BOUNCE NOOSA                                                                                sae                    -     “see
                   est                             lll             noosamuieainasss    — OOUNC oe                ROOF LAYOUT PLAN                                   ey            |
                                           Ea                      aie                                           ROC                                                                  :
                       —                   sae                     Fugiang Investments Pty Ltd                                                                  18001)      &["|F
                                                                                                         Page 74 of 84

Section 75

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        6 NOVEMBER 2018


6                        ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT UPDATE - 1ST
                         QUARTER 2018-19
DOCUMENT INFORM AT ION




Author                              Director Environment and Sustainable Development, Kim Rawlings
                                    Environment and Sustainable Development Department

Index                               ECM/ Subject/ Environment and Sustainable Development Reports

Attachments                         Nil

EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Director Environment and Sustainable Development to the
Planning and Environment Committee Meeting dated 6 November 2018 providing an update on
operations of the Environment and Sustainable Development Department for the period 1 July to
30 September 2018.

REPORT
The adopted organisation structure includes the following branches under the Environment and
Sustainable Development Department:
                       Environmental Services;
                       Strategic Land Use Planning;
                       Economic Development;
                       Development Assessment; and
                       Building and Plumbing
This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the Environment and Sustainable Development Department.




                                                                                            Page 75 of 84

Section 76

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           6 NOVEMBER 2018


ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT
BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                         THE NEXT QUARTER
Director’s office
Sustainability Institute Feasibility Study    Still awaiting the outcome of a Grant     This project has been delayed due to       Receive final report from CSIRO and
Stage 1                                         application submitted to ‘Maturing the      competing priorities.                        schedule a Workshop with Council
                                                Infrastructure Pipeline Program’ to                                                      and internally on the draft report on
                                                assist Council in the next stages of                                                     Stage 1.
                                                assessment and business case
                                                development post consideration of
                                                Stage 1.
Policy to eliminate single use plastics       Cross Council working group               Survey of all areas of Council             Develop Council policy on
from Council business                           established to consider barriers and        business to determine use, potential         elimination of single use plastics
                                                opportunities for eliminating single        alternatives and expenditure on              from Council business for discussion
                                                use plastics from all Council business      plastics                                     with Council
Environmental Services
Implementation of the ZEN Organisation        Completion of installation of solar       Tewantin lighting retrofit tender          ZEN Strategy and action plan mid
Strategy                                        systems at:                                 underway                                     way review
                                                 o NAC (26.5 Kw)                          Tewantin roof/solar tender                 NAC roof/solar as part of NAC roof
                                                 o Noosa Community Support (32              completion                                   replacement
                                                      Kw)                                 Noosaville library solar system            Small electricity sites consumption
                                                 o Cooroy Library (60 Kw)                 Community emissions footprint and            reduction investigations
                                              NAC Internal lighting retrofit              opportunities                              Continue to work with community of
                                              Completion of 2017/18 carbon              Investigations into Science based            community emissions reduction plan
                                                footprint                                   targets and annual reduction               Ongoing investigation and
                                              UQ Student placement and EcoBiz -           requirements to meet targets                 implementation of Landfill
                                                audits of 10 community buildings to                                                      emission reduction strategies
                                                                                          Investigation into Landfill emission
                                                identify energy, waste & water                                                           including
                                                                                            reduction strategies
                                                reduction opportunities.
                                              Working with ZEN inc to support a
                                                range of community based initiatives
Development of new Noosa River Plan           Community consultation on draft           Complete review of public and              Prepare final draft of the River Plan
                                                concluded.                                  Councillor consultation.                     for Council.
                                              Workshop with Councillors on results      Amend plan and make alterations
                                                of feedback on draft plan.                  from feedback received.
                                                                                          Prepare a Councillor workshop on
                                                                                            issues related to Council taking over
                                                                                            State responsibilities on the river.

                                                                                                 Page 76 of 84

Section 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     6 NOVEMBER 2018


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                        CURRENT PRIORITIES                           THE NEXT QUARTER
Noosa Parklands Management Plan          Bushland Operational Assessment          Installation of small capital (seat) in
                                           performed by consultant for Heritage       July.
                                           Park Bushland Reserve.
                                         Some small capital items (seats)
                                           purchased late in financial year.
                                         Draft Environmental Management
                                           Plan completed.
Noosa Bushland Reserve Strategic Plan    First draft complete and consulted       Continue to develop document with          Host workshop with Councillors and
                                           with previous internal stakeholder         new additions to stakeholder groups          receive feedback.
                                           group                                      and edit where required.
Environment Strategy                     Completion of community workshops.       Finalising first draft of the policy       Workshop draft with the Councillors.
                                         Your Say Noosa feedback completed          strategy.                                  Get draft authorised for release for
                                           and reviewed.                                                                           public comment.
Conservation Land Plan                   Conservation Land Plan, Revolving
(guides Environment Levy Acquisition       Fund Policy and Private Land
Program, VCA Program and Land for          Conservation Program Guideline
Wildlife Program)                          adopted by Council.
Environment Levy Land Acquisition        Start-up works for Johns Landing and     Continue maintenance works at              Commence maintenance scheduling
Program                                    Cooloothin Creek Reserves have             Johns Landing and Cooloothin                 for Johns Landing and Cooloothin
                                           commenced                                Nature Refuge processing for both            Creek
                                         Continue to support project team with      Johns Landing and Cooloothin               Finalise Nature Refuge processing
                                           Yurol-Ringtail Conservation Project      Start ecological restoration works at        for both Johns Landing and
                                                                                      Johns Landing                                Cooloothin and media release
                                                                                    Support Yurol-Ringtail State Forests
                                                                                      Conservation project and Transition
                                                                                      Committee
Pest Management                          Completed 1st quarter of Biosecurity     Property inspections and compliance        Complete 2nd quarter of biosecurity
                                           Surveillance Program including the         activities as part of approved               surveillance program.
                                           inspection of properties in the            Biosecurity Surveillance Program.          Finalise annual contract work for
                                           Cooroy, Cooroy Mountain,                 Feral Deer control in the Lake               Transport and Main Roads for Feral
                                           Tinbeerwah, Cooroibah and Doonan           MacDonald area.                              Deer control and priority weed control
                                           areas.                                   Priority weed control on council             works on State Roads.
                                         Completed the 2nd round of twice           managed lands as part of scheduled         Inspection of properties in the Six
                                           yearly coordinated Wild dog control        work.                                        Mile Ck catchment area for the
                                           1080 baiting working on public and       Fox den detection program using              mapping of Cat’s Claw Creeper after
                                           private land in the Ridgewood,             trained sniffer dogs to locate, map          recent detection in council bushland
                                           Federal, Kin Kin, Como, Cootharaba         and fumigate occupied dens.                  reserves in the upper catchment.
                                           and Cooroibah areas.


                                                                                           Page 77 of 84

Section 78

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       6 NOVEMBER 2018


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                            THE NEXT QUARTER
Noosa Trail Network                         Ongoing participation in Master Plan      Re-opening of Trail 8.                      Complete re-route at Lake
                                              for the trail network being               Finalising minor re-routing as a              MacDonald.
                                              coordinated by Tourism Noosa.               result of impending closure of              Review of draft Master Plan when
                                                                                          access to Lake MacDonald due to               available.
                                                                                          dam works.

Flying-foxes                                Support scheme for residents at           Winding down the support scheme             Review future management options
                                              Wallace Park successfully                   now the flying-fox numbers have               for Wallace Park.
                                              implemented.                                dropped.
                                            Ongoing monitoring undertaken             Report on the success and costs of
                                              while numbers of flying-foxes were          the scheme.
                                              very high.                                Continue to support local residents
                                                                                          in Cooran in dealing with flying-foxes
                                                                                          on their properties.

Conservation Partnerships on Private        Coordinated the 20th Anniversary          Represent Noosa at the Strategic            Finalise Briefing Note and Business
Land - Land for Wildlife and Voluntary        Open Property Event for Land for            Sub-Committee meeting for Land for            Case with LfW for strategic
Conservation Agreements.                      Wildlife members.                           Wildlife Regional Coordination                subcommittee regarding regional
                                            Finalised VCA payments and                  arrangements and develop a briefing           coordination as soon as possible.
                                              incentives for 16 active properties.        note and business case in                   Work with existing Voluntary
                                            Private Land Conservation                   collaboration with 11 other SEQ               Conservation Agreement property
                                              Partnerships Guideline going                Councils.                                     owners to implement annual
                                              through Council.                          Prioritise properties that have               incentives.
                                                                                          expressed an interest in establishing       Assess resources required to meet
                                                                                          VCA’s, through the Environment                demand for the program into the
                                                                                          Levy Working Group.                           next financial year.
                                                                                        Undertaking Land for Wildlife visits
                                                                                          already booked. New visits for the
                                                                                          program are currently booked until
                                                                                          early next year with the resources
                                                                                          we have available, so we are not
                                                                                          actively seeking new members until
                                                                                          we catch up.

Community Bushland Care Program             Recruitment of new full-time              Meeting and building relationships          Improve promotion of existing
                                              Bushcare coordinator.                       with all the groups.                          Bushcare Group.
                                                                                                                                      Look at options for new Bushcare
                                                                                                                                        groups in early 2019.



                                                                                              Page 78 of 84

Section 79

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           6 NOVEMBER 2018


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
Strategic Land use Planning
Drafting new Noosa Plan                      Responded to State on all the State          Incorporating LGIP and Local               Community consultation on the draft
                                               Interest questions and comments                Planning Policies into Draft Scheme          new Noosa Plan.
                                                                                            Preparing material for consultation
                                                                                              while waiting State Interest sign off
Biodiversity Plan and assessment report      Awaiting further progress on high            Draft priorities for the Environment       Finalise priorities for Environment
                                               level Environment Strategy to refine           Strategy including workshopping and          Strategy including for biodiversity
                                               the scope of Biodiversity Plan                 drafting priorities for biodiversity.        conservation

Flood risk assessments                       Flood risk assessment finalised and          Response to state interest check           Finalise for final review.
                                               submitted to state government with             comments for flooding.
                                               planning scheme.
Climate Change Adaptation Plan               Community engagement campaign                Complete key asset register and risk       Commence socio-economic analysis
                                               completed for the coastal hazard               assessment report for submission to          of adaptation options; validate
                                               modelling.                                     LGAQ & State government; advance             whole-of-Shire multi-sectoral climate
                                             Tidal inundation modelling further             climate change biodiversity                  change risk assessment results with
                                               developed.                                     assessment; stage 2 of community             sector experts.
                                                                                              engagement campaign, including
                                                                                              workshop.
Business as Usual activities                 General advice and advocacy
                                             Customer enquiries
Economic Development
Local Economic Plan implementation           Initiate mid way monitor and review          Provide monitor and status update to       Produce report card on LEP
                                               of LEP implementation progress                 Council                                      implementation progress to be
                                                                                                                                           published
Business Support and Development             Sunshine Coast Business Awards               Working with potential grant               Providing ‘concierge’ services to key
                                               2018 – Record number of Noosa                  applicants to develop quality                clients
                                               entries. Finalist’s event to be held at        applications with high impact              Continue to promote and improve
                                               Peppers Resort 26 October.                     outcomes. Potential applicants               the quality of Grant applications
                                             Regional Innovation Program                    include; CCIQ Noosa, Innovate
                                               (SCRIPT) – Partnered to host                   Noosa, Create Noosa, Generation
                                               Govhack event, Entrepreneurs event             Innovation, Noosaville Business
                                               with Steve Baxter (Shark Tank),                Association
                                               funded Noosa based projects;                 Regional Innovation Program –
                                               Create Noosa Immerse event,                    working with partners to establish a
                                               Innovation Master Class (partner               sustainable governance model
                                               with Noosa Council) and Silicon              Providing ‘concierge’ services to key
                                               Beach Noosa event scoping study.               clients

                                                                                                 Page 79 of 84

Section 80

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 NOVEMBER 2018


BRANCH ACTIVITIES               RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                       THE NEXT QUARTER
                                   Start-up program launched with
                                     SCRIPT funding
                                   Innovate Noosa, with funding from
                                     Federal Government launched the
                                     ‘Venture Playbook’, a tool for
                                     businesses to use to grow and
                                     innovate
                                   Economic Development Grants
                                     awarded to: Create Noosa $2,000
                                   Concierge service provided to
                                     multiple stakeholders including:
                                     Alkira Software, Offiscape Furniture,
                                     Bendigo Bank, Commtract,
                                     Cleansight, Boardrooms Australia,
                                     Lime Transport Solutions, Land and
                                     Sea Brewery

Industry & Sector Development      Digital Sector – Peregian Digital Hub      Digital Sector – Continue to           Digital Sector - finalise operational
                                     officially opened 12 September.              ‘operationalise’ the Digital Hub.        management of the Digital Hub.
                                     Currently 18 Technology Co-workers           Launch ‘Barception’ service              Focus on expanded revenue
                                     located downstairs, and part-time          Education Sector – finalise NETA         opportunities and program
                                     co-worker option launched in                 action plan and funding                  expansion
                                     September. Program of events
                                     during report period include
                                     Govhack, Steve Baxter entrepreneur
                                     event, e-game (Fortnite), schools
                                     coding and maker day, creative in
                                     residence.
                                   Barception Invitation to Quote closed
                                     and negotiations being finalised with
                                     the successful applicant
                                   Education Sector – the Noosa
                                     Education and Training Alliance
                                     (NETA) launched officially at the
                                     Digital Hub in September. Minister
                                     for Innovation and Sandy Bolton,
                                     local MP hosted an Education
                                     Pathways workshop at the Digital
                                     Hub


                                                                                     Page 80 of 84

Section 81

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     6 NOVEMBER 2018


BRANCH ACTIVITIES                      RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
                                          Rural & Agribusiness Sector –
                                            Council supporting food tourism
                                            collaboration involving Tourism
                                            Noosa, FAN, Slow Food Noosa and
                                            Country Noosa
                                          Sustainable Tourism – working on
                                            Noosa Trails Master Plan project,
                                            Value of Tourism research, and
                                            assessing opportunities for Business
                                            Events
                                          Transport – Govhack event, hosted
                                            at the Digital Hub provided winning
                                            entries related to innovative tech
                                            transport solutions

Communications and Marketing Program      Launched Knowledge Investment in          Continued promotion of the Peregian       Development and adoption of a
                                            Noosa – the education and training          Beach Digital Hub                           marketing and communications
                                            sector profile                            Development of marketing collateral.        strategy.

Leadership & Strategy Program             RDA Sunshine Coast – Economic             Support and Influence regional            Contribute to the strategic plan
                                            Development Manager ex-officio              priorities through involvement with         associated with the $2.5M
                                            member of RDA Sunshine Coast                RDA, Sunshine Coast Business                announcement for the Rufous Street
                                          Sunshine Coast Business Council –           Council and others                          and Digital Hub project
                                            attended and contributed to Think
                                            Tank sessions
                                          CCIQ Noosa – supported events
                                            and transition to a new Committee

Business as Usual activities              Represent Council at a range of           Client management and inward              Ongoing business enquiry
                                            business and network forums                 business enquiries                          management
                                                                                      Meetings with key stakeholders
                                                                                        internally / externally




                                                                                            Page 81 of 84

Section 82

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          6 NOVEMBER 2018


BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
Development Assessment
Local Government Infrastructure Plan for      Council adoption of LGIP                   Implementation of LGIP
existing planning scheme
Local Government Infrastructure Plan for      Transference of Unitywater’s DMaTT         Public Notification of draft LGIP and      Review of submissions received to
next planning scheme                            model to Council’s T1 property               supporting documents                         draft LGIP by Council and resolve to
                                                system                                                                                    proceed
                                              Review LGIP mapping of Priority                                                         Second independent review of draft
                                                Infrastructure Area (PIA) & Plans for                                                     LGIP
                                                Trunk Infrastructure (PFTI)                                                             Minister’s second review of draft
                                              Finalise draft LGIP                                                                       LGIP and approval for Council to
                                              Submit draft LGIP to independent                                                          adopt
                                                reviewer                                                                                Council adoption of LGIP
Auditing program for Advertising Devices      Agreement reached with a number            Currently auditing signage in the          Continue auditing program for
                                                of business owners in Tewantin,              Noosaville area                              advertising devices – Eastern
                                                Noosa Junction & Noosaville to             Ongoing inspection of signage                Beaches & Hinterland area
                                                address non- compliant signage               complaints and advice on signage
                                                                                             requirements
                                                                                           Discussions commenced with
                                                                                             business owners with non-compliant
                                                                                             signage in Noosa Junction &
                                                                                             Noosaville
Business as Usual activities                  Successful judgement for Elanda            Preparation work for Eaglerise             Continued assessment of
                                                Appeal Preliminary Point                     Development & Gabarrin Appeals               Development Applications lodged
                                              Monthly reporting to Treasury QLD          Settlement of Thomco appeal and              under The Noosa Plan
                                                State Government and Australian              currently preparing conditions to
                                                Bureau of Statistics on development          finalise Thomco Appeal
                                                approval information                       Preparation work for Tribunal appeal
                                              Introduced ‘alerts scheme for                re 26 Dolphin Bay Dve
                                                development applications in T1             Compliance action commenced with
                                                property to better track time frames         Noosa Airfield, Elanda Point, 2
                                                                                             jetties on Noosa River and a number
                                                                                             of sites for breaches of The Noosa
                                                                                             Plan
                                                                                           Reviewing new planning legislation
                                                                                             amendments for containers for
                                                                                             change scheme




                                                                                                 Page 82 of 84

Section 83

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        6 NOVEMBER 2018


BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
Building and Plumbing
Legislative Review                        Preparation for the introduction of the    Continue to develop procedures &           Attendance at next legislative
                                            amended Plumbing and Drainage Act            processes for the adoption of new            workshop in Brisbane
                                            2002 with the new Plumbing Act 2017          legislation                                Continue to prepare new legislative
                                            legislative obligations.                   Implementation of Plumbing Works             documentation and report to Council
                                          Attendance at legislative meeting in         Permit template & inhouse processes          with proposed resolutions once State
                                            Brisbane to discuss Local Govt               to replace existing compliance               regulations have been released.
                                            obligations.                                 certificate.
Business as Usual activities              Meeting legislative timeframe              Maintain existing legislative              New Plumbing and Drainage fast
                                            requirements for all applications.           timeframes and obligation.                   track approval processes and permits
                                          Monthly reporting to Treasury QLD          Identify new Legislative fines and           have been developed to meet
                                            State Government and Australian              State approvals for SPER. Building           Councils obligations under new
                                            Bureau of Statistics timeframes on           Act has been completed but more              Plumbing and Drainage Act
                                            track.                                       work to be undertaken in regards to        Joint meeting with Distribution
                                          Complaint and investigation reporting        new Plumbing Act.                            Retailers and Regional Councils for
                                            timeframes on track                        Tribunal preparation:                        the development of a new domestic
                                          Tribunal summons to appear on:               1. Forest Acres, Shorehaven.                 and commercial “connection”
                                            1. Forest Acres Drive, Lake Mac              2. Tribunal overturned in favour of          approval agreement
                                            2. Shorehaven, Noosaville                        customer: Honey Myrtle, Noosa
                                            3. Honey Myrtle, Noosa Heads                     Heads (Roofed patio deck- side
                                            Appeals withdrawn:                               boundary)
                                            1. Callitris street, Marcus Beach
                                            2. Pickering Cour,Tewantin
                                            3. Shipyard Court, Noosaville
Plumbing and Building Audit &             Audit Programme stage one of four          Mail out to identified commercial          Residents have been advised of
Educational Programmes                      stages (Backflow Prevention Device)          properties subject to (Backflow              results of audit and two residents
                                          Swimming Pool educational                    Prevention Device) audit programme.          have been contacted to complete
                                            programme – Developed new                  Check Queensland Building and                actioned works.
                                            educational brochure and mail outs to        Construction Commission swimming           Undertake desk top analysis with
                                            7,500 commercial residential                 pool register to complete this part of       identified results of audits (estimated
                                            customers.                                   mail out programme (90% complete)            programme timeframe 9 months) This
                                                                                                                                      programme is 90% complete to date.
Council implementation of Building        Develop and Implement processes            Promotion of Referral Processes for        Continue to develop programme and
Demolition Referrals Response               for building demolition referral             new Customers (Private Building              record keeping processes.
                                            responses                                    Certifiers/ Residents/ Unitywater)
State Government Form 4A Process          Council opted in to this new plumbing      Meet with all Public entities including    Undertake Shire wide audits
Implementation Audit Programme.             minor work audit programme                   Noosa Council representatives to           Meet with Unitywater, Q build & Main
(included in programme: Federal, State                                                   discuss processes for audits and             Roads reps to discuss programme
and Local Government Agencies)                                                           plumbing work applications

                                                                                              Page 83 of 84

Section 84

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  6 NOVEMBER 2018



Previous Council Consideration

Nil.

Finance

Nil.

Risks & Opportunities

Nil.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Departments/Sections Consulted:

       Chief Executive Officer       Community Services                      Corporate Services
       Executive Officer             Director                                Director
       Executive Support             Community Development                   Financial Services
                                     Community Facilities                    ICT
                                     Libraries & Galleries                   Procurement & Fleet
                                     Local Laws                              Property
                                     Waste & Environmental Health            Revenue Services

       Executive Services        X   Environment & Sustainable Development   Infrastructure Services
       Director                  X   Director                                Director
       Community Engagement      X   Building & Plumbing Services            Asset Management
       Customer Service          X   Development Assessment                  Buildings and Facilities
       Governance                X   Economic Development                    Civil Operations
       People and Culture        X   Environmental Services                  Disaster Management
                                 X   Strategic Land Use Planning             Infrastructure Planning,
                                                                             Design and Delivery




                                                                                          Page 84 of 84

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.