Original source · versioned page text
2018-11-06 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DEPARTMENT
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Director’s office
Sustainability Institute Feasibility Study Still awaiting the outcome of a Grant This project has been delayed due to Receive final report from CSIRO and
Stage 1 application submitted to ‘Maturing the competing priorities. schedule a Workshop with Council
Infrastructure Pipeline Program’ to and internally on the draft report on
assist Council in the next stages of Stage 1.
assessment and business case
development post consideration of
Stage 1.
Policy to eliminate single use plastics Cross Council working group Survey of all areas of Council Develop Council policy on
from Council business established to consider barriers and business to determine use, potential elimination of single use plastics
opportunities for eliminating single alternatives and expenditure on from Council business for discussion
use plastics from all Council business plastics with Council
Environmental Services
Implementation of the ZEN Organisation Completion of installation of solar Tewantin lighting retrofit tender ZEN Strategy and action plan mid
Strategy systems at: underway way review
o NAC (26.5 Kw) Tewantin roof/solar tender NAC roof/solar as part of NAC roof
o Noosa Community Support (32 completion replacement
Kw) Noosaville library solar system Small electricity sites consumption
o Cooroy Library (60 Kw) Community emissions footprint and reduction investigations
NAC Internal lighting retrofit opportunities Continue to work with community of
Completion of 2017/18 carbon Investigations into Science based community emissions reduction plan
footprint targets and annual reduction Ongoing investigation and
UQ Student placement and EcoBiz - requirements to meet targets implementation of Landfill
audits of 10 community buildings to emission reduction strategies
Investigation into Landfill emission
identify energy, waste & water including
reduction strategies
reduction opportunities.
Working with ZEN inc to support a
range of community based initiatives
Development of new Noosa River Plan Community consultation on draft Complete review of public and Prepare final draft of the River Plan
concluded. Councillor consultation. for Council.
Workshop with Councillors on results Amend plan and make alterations
of feedback on draft plan. from feedback received.
Prepare a Councillor workshop on
issues related to Council taking over
State responsibilities on the river.
Page 76 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.