Original source · versioned page text
Rfi - PG-2096, 2022-11-03, Gr Ver 3
Project No. PG-2096 Page | 5 March 2023 Ref: PG-2096, 2022-11-03, GR VER 3 Keith & Jeannette Ince – Geotechnical Stability Assessment - Proposed Residence, 22 Arakoon Crescent, Sunshine Beach 4.0 GEOTECHNICAL MODEL The subsurface profile encountered in the boreholes consisted of initially very loose to loose sands overlying medium dense to dense sands to the termination of testing. In Borehole 1, 600mm of very loose gravelly sand was encountered. The density of the sand has been interpreted on the basis of the DCP testing results. Detailed borehole record sheets are appended to this report. Groundwater or subsurface seepage was not encountered in the boreholes at the time of drilling. 5.0 EARTHWORKS AND SITE PREPARATION CONSIDERATIONS Earthworks are expected to comprise of a cut operation of up to 4m to create an underground plant room and water tank. Minor filling removed from the excavation and primarily adjacent Arakoon Crescent is expected. Consideration should be given to maintaining the stability of the excavation immediately adjacent Arakoon Crescent during earthworks. It is recommended that the following site preparation and earthworks procedures be carried out as part of the earthworks procedures during development. • All earthworks operations should be carried out in general accordance with AS 3798-2007 "Guidelines on Earthworks for Commercial and Residential Developments". • Trafficability across the site at the time of the investigation was assessed to be poor due to the steepness of the site. • All topsoil (i.e. soil containing organic matter) and soils containing deleterious matter should be stripped from the construction area at the commencement of the earthworks operation. • The majority of the soils on site will be suitable for re-use as structural fill, provided material is free of organic matter and deleterious material. It is likely that the soils require conditioning to bring the soils to optimum If the soils were overly moist, difficulty in achieving compaction of the materials will be encountered and moisture conditioning will be required. • Imported fill should be of fair to good quality with a minimum Soaked CBR value of 10%, a maximum Iss=1.0% and a maximum particle size of 75mm or a ‘clean’ sand. • All filling should be undertaken in layer thicknesses of approximately 250mm (or as appropriate for the compaction equipment being used). Fill should be compacted to a minimum dry density ratio of 95% Standard in accordance with AS1289 5.1.1 or a minimum density index of 65% in accordance with AS1289 5.6.1.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.