Civil Plans

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (11.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
INDUSTRIAL DE ELOPMENT
 TAYLOR CT
                                                                                                                                 A
                                                                                                                              Engineering                         PTY LTD


COOROY LD
                                                                                                                     DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                        IN O   A ENGINEERING COM AU




Operational Works Application
PETER DONELAN
      NORTH POINT




                                                           DRAWING SCHEDULE




                                                                                           Table
                                                                                           List
                                                                                           Sheet
                                                               NUM ER                                  TITLE
                                                           GENERAL
                                                                  228-001-001       COVER SHEET
                                                                  228-001-002       GENERAL NOTES
                                                           EARTHWORKS & ROADWORKS
                                                                  228-001-100       SITE LAYOUT PLAN

                    SITE LOCATION            HO
                                               LT
                                                                  228-001-200
                                                                  228-001-201
                                                                                    EARTHWORKS LAYOUT PLAN
                                                                                    EARTHWORKS SECTIONS
                                                  S
                                                      RD          228-001-203       RETAINING WALL DETAIL
                                        CT




                                                                  228-001-250       SEDIMENT & EROSION CONTROL PLAN
                                     R




                                                                  228-001-251       SEDIMENT & EROSION DETAIL
                                    O
                                 YL




                                                                  228-001-300       GRADING & DRAINAGE LAYOUT PLAN
                                TA




                                                                  228-001-301       PAVEMENT LAYOUT PLAN
                                                                  228-001-302       SIGNAGE & LINEMARKING LAYOUT PLAN
                                                           STORMWATER
                                                                  228-001-400       DRAINAGE CATCHMENT LAYOUT PLAN
                                                                  228-001-401       DRAINAGE LONGITUDINAL SECTION
                                                                  228-001-402       DRAINAGE CALCULATIONS TABLE
                                                           WATER RETICULATION
                                                                  228-001-500       WATER RETICULATION GENERAL NOTES
                                                                  228-001-501       WATER RETICULATION LAYOUT PLAN
                                                                  228-001-502       WATER RETICULATION DETAIL PLAN
                                                           SEWER RETICULATION
                                                                  228-001-600       SEWER RETICULATION GENERAL NOTES
                                                                  228-001-601       SEWER RETICULATION LAYOUT PLAN
                                                           MISCELLANEOUS
                                                                  228-001-700       CONCRETE & JOINTING DETAILS
                                                           VEHICLE SWEPT PATH
                                                                  228-001-800       SWEPT PATH LAYOUT PLAN SHEET 1 OF 2
                                                                  228-001-801       SWEPT PATH LAYOUT PLAN SHEET 2 OF 2




LOCALITY PLAN


PROPERTY DESCRIPTION                                                                                                                     PROJECT DESCRIPTION
LOT:                                                                                                                                                                    PROJECT NAME:

1                                                                                                                                                1 TAYLOR COURT, COOROY QLD 4563
PLAN:                                                                                                                                                                     PROJECT NO:

SP324340                                                                                                                                                                  228-001
LOCAL AUTHORITY:                                                                                                                                                        REVISION DATE:

NOOSA SHIRE REGIONAL COUNCIL                                                                                                                                             07.04.22
LOCAL AUTHORITY APPROVAL NO:                                                                                                                                               PLAN ISSUE:

---
                                                                                                                                                     FOR APPROVAL
Log in to download the original file

Civil Plans.pdf · 11.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 21 pages

Page 2

             GENERAL                                                                                                            EARTHWORKS/ROADWORKS                                                                                                    SEDIMENT AND EROSION




             STORMWATER




                                                                                                                                 ·
                                                                                                                                 ·
                                                                                                                                 ·
                                                                                                                                 ·
                                                                                                                                 ·
                                                                                                                                 ·




             LINEMARKING




                                                                                                      ENERGY SERVICE PROVIDERS                                         TELECOMMUNICATIONS
                                                                                                                                                                        SERVICE PROVIDERS                                                       elstra                           Manual of Uniform Traffic Control Devices
                   BEFORE YOU DIG     SERVICE LOCATIONS                                                 AGL
                                                                                                                                     ERGON.                                                                                                          AUSTRALIA
                                     IT IS THE RESPONSIBILITY OF THE PRINCIPAL
                                                                                                                                     ENERGY
                                                                                                                                                        energex      ' yes'  Telstra visionstream
                                    CONTRACTOR TO CONTACT ALL RELEVANT                                               origin                                             OPTUS                                                 WARNING: OPTIC FIBRE                                NOTE: ALL SIGNS & LINE MARKING TO BE IN
                                    SERVICE AUTHORITIES TO VERIFY THE                               NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM             NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM           EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
                                    LOCATION OF ALL EXISTING SERVICES PRIOR                               PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED                PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED        VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO          ACCORDANCE WITH THE MANUAL OF
                                                                                                          PRIOR TO START OF CONSTRUCTION. PHONE DBYD                    PRIOR TO START OF CONSTRUCTION. PHONE DBYD
                                    TO THE START OF CONSTRUCTION                                          SERVICE LOCATIONS ON 1100 FOR DETAILS.                        SERVICE LOCATIONS ON 1100 FOR DETAILS.
                                                                                                                                                                                                                              BE CONFIRMED PRIOR TO START OF CONSTRUCTION.              UNIFORM TRAFFIC CONTROL DEVICES.




                                                                                                                                                                                          A
                                                 SCALE:                                               SURVEYED:                                                                                                                    CLIENT:                                         NORTH POINT   TITLE:


                                                                                                                                                                                                                                               PETER DONELAN                                     GENERAL NOTES
                                                                                                      DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                      QT

                                      QT
                                           GWA
                                                 PROJECT NO:

                                                          228-001
                                           GWA LOCAL AUTHORITY APPROVAL NO:
                                                                              DATE

                                                                              CHECKED

                                                                              DRAWN
                                                                                         24.01.22
                                                                                          GWA
                                                                                           QT
                                                                                                      APPROVED:

                                                                                                                                  GLENN AINSWORTH
                                                                                                                                       CPESC No: 7678
                                                                                                                                       RPEQ No: 19204
                                                                                                                                                                                       Engineering
                                                                                                                                                                                   DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                                                         PTY LTD
                                                                                                                                                                                                                                   PROJECT:


                                                                                                                                                                                                                                    1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS        BY   CKD                 ---            DESIGNED     QT         FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.                                  IN O   A ENGINEERING COM AU                                                                                 PLAN No   228-001-002   REVISION   B   A1

Page 3

                                                                                                                                       H                                                                                                                     H
                                                                                                                                      M                                                                                                                     M




                                                        E ISTING LAYOUT                                                                                                                                           PROPOSED LAYOUT
                                                                                                                                                                                                             LEGEND




                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         SITE LAYOUT PLAN
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No      228-001-100   REVISION   B   A1

Page 4

                                                                                    UP


                                                                                                                                                      UP




                                                                                                                                                                                                                                               LEGEND




                                                                                                                                                        H
                                                                                                                                                       M




                                                                                                                                                               A
                                               SCALE:                                               SURVEYED:                                                                                        CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                                PETER DONELAN                         EARTHWORKS LAYOUT PLAN
                                                                                                    DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                         24.01.22
                                                                                          GWA
                                                                                           QT
                                                                                                    APPROVED:

                                                                                                                                GLENN AINSWORTH
                                                                                                                                     CPESC No: 7678
                                                                                                                                     RPEQ No: 19204
                                                                                                                                                            Engineering
                                                                                                                                                       DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                           PTY LTD
                                                                                                                                                                                                     PROJECT:


                                                                                                                                                                                                      1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED       QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.        IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-200   REVISION   B   A1

Page 5

                                                                                                                                                             A
                                               SCALE:                                               SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                               PETER DONELAN                         EARTHWORKS SECTIONS
                                                                                                    DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA

                                         GWA
                                               PROJECT NO:

                                                        228-001
                                               LOCAL AUTHORITY APPROVAL NO:
                                                                              DATE

                                                                              CHECKED

                                                                              DRAWN
                                                                                         24.01.22
                                                                                          GWA
                                                                                           QT
                                                                                                    APPROVED:

                                                                                                                                GLENN AINSWORTH
                                                                                                                                     CPESC No: 7678
                                                                                                                                     RPEQ No: 19204
                                                                                                                                                          Engineering
                                                                                                                                                      DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                          PTY LTD
                                                                                                                                                                                                    PROJECT:


                                                                                                                                                                                                     1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---              DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-201   REVISION   B   A1

Page 6

                                                                                                                                                                     NOTES




                                                                                                                                                                                 TA LE               RETAINING WALL PARAMETERS




                                         CONCRETE SLEEPER WALL DETAIL




                                                                                                                                                             A
                                               SCALE:                                               SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                               PETER DONELAN                         RETAINING WALL DETAIL
                                                                                                    DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA

                                         GWA
                                               PROJECT NO:

                                                        228-001
                                               LOCAL AUTHORITY APPROVAL NO:
                                                                              DATE

                                                                              CHECKED

                                                                              DRAWN
                                                                                         24.01.22
                                                                                          GWA
                                                                                           QT
                                                                                                    APPROVED:

                                                                                                                                GLENN AINSWORTH
                                                                                                                                     CPESC No: 7678
                                                                                                                                     RPEQ No: 19204
                                                                                                                                                          Engineering
                                                                                                                                                      DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                          PTY LTD
                                                                                                                                                                                                    PROJECT:


                                                                                                                                                                                                     1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---              DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-203   REVISION   B   A1

Page 7

                                                                                                                                                                                                                                             NOTE




                                                                                                                                                                                                                                                   LEGEND




                                                                                                                                                     H
                                                                                                                                                    M




                                                                                                                                                            A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         SEDIMENT & EROSION CONTROL PLAN
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                         Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-250   REVISION   B   A1

Page 8

                                    STA ILISED SITE ACCESS
                                                                                                                                                                                                                SEDIMENT      ENCE




                                           ARRIER                     ENCE




                                                                                                                                                            A
                                                SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                              PETER DONELAN                         SEDIMENT & EROSION DETAIL
                                                                                                   DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                     QT

                                     QT
                                          GWA
                                                PROJECT NO:

                                                         228-001
                                          GWA LOCAL AUTHORITY APPROVAL NO:
                                                                             DATE

                                                                             CHECKED

                                                                             DRAWN
                                                                                        24.01.22
                                                                                         GWA
                                                                                          QT
                                                                                                   APPROVED:

                                                                                                                               GLENN AINSWORTH
                                                                                                                                    CPESC No: 7678
                                                                                                                                    RPEQ No: 19204
                                                                                                                                                         Engineering
                                                                                                                                                     DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                         PTY LTD
                                                                                                                                                                                                   PROJECT:


                                                                                                                                                                                                    1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS       BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-251   REVISION   B   A1

Page 9

                                                                                                                                                                                                                                                     LEGEND




                                                                                                                                                                                                               H
                                                                                                                                                                                                              M




                                                                                                                                                             A
                                               SCALE:                                               SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                                   PETER DONELAN                     GRADING & DRAINAGE LAYOUT PLAN
                                                                                                    DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA

                                         GWA
                                               PROJECT NO:

                                                        228-001
                                               LOCAL AUTHORITY APPROVAL NO:
                                                                              DATE

                                                                              CHECKED

                                                                              DRAWN
                                                                                         24.01.22
                                                                                          GWA
                                                                                           QT
                                                                                                    APPROVED:

                                                                                                                                GLENN AINSWORTH
                                                                                                                                     CPESC No: 7678
                                                                                                                                     RPEQ No: 19204
                                                                                                                                                          Engineering
                                                                                                                                                      DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                          PTY LTD
                                                                                                                                                                                                    PROJECT:


                                                                                                                                                                                                     1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---              DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-300   REVISION   B   A1

Page 10

                                               UP


                                                                                                                                                                                                             UP




                                                                                                                                                                                                                                      LEGEND


                                                                                                                                                                                                               H
                                                                                                                                                                                                              M




                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                                   PETER DONELAN                   PAVEMENT LAYOUT PLAN
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-301   REVISION   B   A1

Page 11

                                                                                                                                                                                                                             H
                                                                                                                                                                                                                         M




                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         SIGNAGE & LINEMARKING
                                                                                                  DATUM:   AHD                                                                                                                                     LAYOUT PLAN
B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-302   REVISION   B   A1

Page 12

                                                                                                                                                     H
                                                                                                                                                    M




                                                                                                                                                            A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         DRAINAGE CATCHMENT LAYOUT PLAN
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                         Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-400   REVISION   B   A1

Page 13

                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         DRAINAGE LONGITUDINAL SECTION
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-401   REVISION   B   A1

Page 14

                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         DRAINAGE CALCULATIONS TABLE
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-402   REVISION   B   A1

Page 15

          NORTH POINT
                                                                                                                                                                      NOTES:                                                                             WATER




                        SITE LOCATION                                        HO
                                                                                  LT
                                                                                    S
                                                                                        RD
                                                                                                                                                                                         ≤




                                                        CT
                                                                                                                                                                                                                       ≤

                                                       OR
                                                     YL
                                                   TA




        LOCALITY PLAN
      DRAWING SCHEDULE
                                             TITLE
      WATER RETICULATION
      228-001-500            WATER RETICULATION GENERAL NOTES
      228-001-501            WATER RETICULATION LAYOUT PLAN
      228-001-502            WATER RETICULATION DETAIL PLAN

                                                                                                                                                                                               SERVICE LOCATIONS
                    CLEARANCES BETWEEN WATER MAINS AND                                                                                                                                        IT IS THE RESPONSIBILITY OF THE PRINCIPAL
                                                                                                                                                                                             CONTRACTOR TO CONTACT ALL RELEVANT
                          UNDERGROUND SERVICES                                                                                                                                               SERVICE AUTHORITIES TO VERIFY THE
                                                                                                                                                                                             LOCATION OF ALL EXISTING SERVICES PRIOR
                                                                                                                                                                                             TO THE START OF CONSTRUCTION



                                    ≤                                                                                                                                           Manual of Uniform Traffic Control Devices
                                                                                                                                    BEFORE YOU DIG
              ≤


                                                                                                                                                                                 NOTE: ALL SIGNS & LINE MARKING TO BE IN
                                                                                                                                                                                       ACCORDANCE WITH THE MANUAL OF
              ≤
                                                                                                                                                                                       UNIFORM TRAFFIC CONTROL DEVICES.



                                                                                                                                    ENERGY SERVICE PROVIDERS                                        TELECOMMUNICATIONS
                                                                                                                                      AGL                                                            SERVICE PROVIDERS                                                             elstra
                                                                                                                                                                     ERGON.                                                                                                             AUSTRALIA
              ≤                                                                                                                                                      ENERGY
                                                                                                                                                                               energex            ' yes'  Telstra visionstream
                                                                                                                                                origin                                               OPTUS                                                       WARNING: OPTIC FIBRE
                                                                                                                                  NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM            NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM                 EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
                                                                                                                                        PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED               PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED              VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO
                                                                                                                                        PRIOR TO START OF CONSTRUCTION. PHONE DBYD                   PRIOR TO START OF CONSTRUCTION. PHONE DBYD
                                                                                                                                        SERVICE LOCATIONS ON 1100 FOR DETAILS.                                                                                   BE CONFIRMED PRIOR TO START OF CONSTRUCTION.
                                                                                                                                                                                                     SERVICE LOCATIONS ON 1100 FOR DETAILS.




                                                                                                                                                                                                           A
                                                              SCALE:                                               SURVEYED:                                                                                                                          CLIENT:                                                       NORTH POINT   TITLE:


                                                                                                                                                                                                                                                                        PETER DONELAN                                             WATER RETICULATION
                                                                                                                   DATUM:   AHD                                                                                                                                                                                                   GENERAL NOTES
B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                                   QT

                                                   QT
                                                        GWA
                                                              PROJECT NO:

                                                                       228-001
                                                        GWA LOCAL AUTHORITY APPROVAL NO:
                                                                                             DATE

                                                                                             CHECKED

                                                                                             DRAWN
                                                                                                        24.01.22
                                                                                                         GWA
                                                                                                          QT
                                                                                                                   APPROVED:

                                                                                                                                               GLENN AINSWORTH
                                                                                                                                                    CPESC No: 7678
                                                                                                                                                    RPEQ No: 19204
                                                                                                                                                                                                        Engineering
                                                                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                                                                            PTY LTD
                                                                                                                                                                                                                                                      PROJECT:


                                                                                                                                                                                                                                                       1 TAYLOR COURT, COOROY QLD 4563
No.    DATE             REVISIONS                  BY   CKD                 ---              DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.                                      IN O   A ENGINEERING COM AU                                                                                                 PLAN No   228-001-500   REVISION   B   A1

Page 16

                                                                        UP


                                                                                                                                                                                                                  UP




                                                                                                                                                                                                                                                      LEGEND




                                                                                                                                                                                                                     H
                                                                                                                                                                                                                    M




                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         WATER RETICULATION LAYOUT PLAN
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-501   REVISION   B   A1

Page 17

                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         WATER RETICULATION DETAIL PLAN
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-502   REVISION   B   A1

Page 18

        NORTH POINT                                                                                                                                                 SEWER




                      SITE LOCATION                                         HO
                                                                                 LT
                                                                                   S
                                                                                       RD




                                                       CT
                                                     OR
                                                   YL
                                                 TA




             LOCALITY PLAN


             DRAWING SCHEDULE
                                                       TITLE
             SEWER RETICULATION
             228-001-600            SEWER RETICULATION GENERAL NOTES
             228-001-601            SEWER RETICULATION LAYOUT PLAN




                                                                                                                                                                            A
                                                             SCALE:                                               SURVEYED:                                                                                        CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                                              PETER DONELAN                         SEWER RETICULATION
                                                                                                                  DATUM:   AHD                                                                                                                                      GENERAL NOTES
B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                                  QT

                                                  QT
                                                       GWA
                                                             PROJECT NO:

                                                                      228-001
                                                       GWA LOCAL AUTHORITY APPROVAL NO:
                                                                                            DATE

                                                                                            CHECKED

                                                                                            DRAWN
                                                                                                       24.01.22
                                                                                                        GWA
                                                                                                         QT
                                                                                                                  APPROVED:

                                                                                                                                              GLENN AINSWORTH
                                                                                                                                                   CPESC No: 7678
                                                                                                                                                   RPEQ No: 19204
                                                                                                                                                                         Engineering
                                                                                                                                                                     DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                                         PTY LTD
                                                                                                                                                                                                                   PROJECT:


                                                                                                                                                                                                                    1 TAYLOR COURT, COOROY QLD 4563
No.   DATE            REVISIONS                   BY   CKD                 ---              DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.        IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-600   REVISION   B   A1

Page 19

                                                                                                                                                                                                                                                         LEGEND




                                                                                                                                                                                                   H
                                                                                                                                                                                                  M




                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                               NORTH POINT   TITLE:


                                                                                                                                                                                                              PETER DONELAN                           SEWER RETICULATION LAYOUT PLAN
                                                                                                  DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                      1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                     PLAN No   228-001-601   REVISION   B   A1

Page 20

                                                                                                                                                                                                                                                                                A
                                                                                                                                                                A                                                                                                               -
                                                                                                                                                                -


                                                                            A
                                                                            -




                                                                                                                                                              A
                                               SCALE:                                                SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                                PETER DONELAN                         CONCRETE & JOINTING DETAILS
                                                                                                     DATUM:   AHD

B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                                CHECKED

                                                                            DRAWN
                                                                                          24.01.22
                                                                                           GWA
                                                                                            QT
                                                                                                     APPROVED:

                                                                                                                                 GLENN AINSWORTH
                                                                                                                                      CPESC No: 7678
                                                                                                                                      RPEQ No: 19204
                                                                                                                                                           Engineering
                                                                                                                                                       DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                           PTY LTD
                                                                                                                                                                                                     PROJECT:


                                                                                                                                                                                                      1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED        QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-700   REVISION   B   A1

Page 21

                                                                                                                                 UP


                                                                                                                                                                                                                                             UP




                                                                                                                                                                                                                                                              LEGEND




                                                                                                                                                           A
                                               SCALE:                                             SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                             PETER DONELAN                         SWEPT PATH LAYOUT PLAN
                                                                                                  DATUM:   AHD                                                                                                                                     SHEET 1 OF 2
B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA
                                               PROJECT NO:

                                                        228-001
                                         GWA LOCAL AUTHORITY APPROVAL NO:
                                                                            DATE

                                                                            CHECKED

                                                                            DRAWN
                                                                                       24.01.22
                                                                                        GWA
                                                                                         QT
                                                                                                  APPROVED:

                                                                                                                              GLENN AINSWORTH
                                                                                                                                   CPESC No: 7678
                                                                                                                                   RPEQ No: 19204
                                                                                                                                                        Engineering
                                                                                                                                                    DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                        PTY LTD
                                                                                                                                                                                                  PROJECT:


                                                                                                                                                                                                   1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---            DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-800   REVISION   B   A1

Page 22

                                                                                                                                   UP


                                                                                                                                                                                                                                               UP




                                                                                                                                                                                                                                                                LEGEND




                                                                                                                                                             A
                                               SCALE:                                               SURVEYED:                                                                                       CLIENT:                            NORTH POINT   TITLE:


                                                                                                                                                                                                               PETER DONELAN                         SWEPT PATH LAYOUT PLAN
                                                                                                    DATUM:   AHD                                                                                                                                     SHEET 2 OF 2
B 07.04.22 CARPPARK ADJUSTED

A 21.01.22 ISSUED FOR INFORMATION
                                    QT

                                    QT
                                         GWA

                                         GWA
                                               PROJECT NO:

                                                        228-001
                                               LOCAL AUTHORITY APPROVAL NO:
                                                                              DATE

                                                                              CHECKED

                                                                              DRAWN
                                                                                         24.01.22
                                                                                          GWA
                                                                                           QT
                                                                                                    APPROVED:

                                                                                                                                GLENN AINSWORTH
                                                                                                                                     CPESC No: 7678
                                                                                                                                     RPEQ No: 19204
                                                                                                                                                          Engineering
                                                                                                                                                      DA ID LOW WAY PEREGIAN EACH    LD
                                                                                                                                                                                          PTY LTD
                                                                                                                                                                                                    PROJECT:


                                                                                                                                                                                                     1 TAYLOR COURT, COOROY QLD 4563
No.   DATE           REVISIONS      BY   CKD                 ---              DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.       IN O   A ENGINEERING COM AU                                                                  PLAN No   228-001-801   REVISION   B   A1

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.