Skip to the record
Search everything, all in one place.

Council archive · source document

Request for Further Information - 010.2007.00001685.001 [As Published] · 132007.1685

of 6

Text shows just the words. Original shows the document exactly as it was published.

Land Development

11.   Demonstrate compliance with Council’s Code, particularly the:

      11.1. Driveways & Carparking Code,

      11.2. Earthworks Code;

      11.3. Existing Services Code;

      11.4. Transport, Roads & Drainage Code; &

      11.5. Water Sensitive Design Code;
      Whilst a detailed assessment of these Codes will take place at the Operational
      Works stage, it is important that the development considers these Codes prior to
      obtaining a Material Change of Use approval, as they may impact on the
      proposal.

12.   Provide an accurate survey plan of the site (including the immediate surrounds),
      that incorporates:

      12.1. Contours lines at hight interval not exceeding 0.5m.

      12.2. Existing trees.

      12.3. Existing structures, buildings and fences.

      12.4. Existing services: sewer, water, telecommunication and power poles
            including those within the road reserve and adjacent to the site.

      12.5. The edge of bitumen and kerb line along the service road.

13.   Provide a general design of the proposed vehicle access to the site showing the
      grades.

14.   Provide a plan showing the depth of earthworks and finished levels to achieve
      the building platforms, carparking area/s and driveway design levels.

15.   Demonstrate how the development will cater for stormwater runoff from the
      upstream properties for Average Recurrence Interval (ARI) design storm and the
      overland flow path designed for a 1 in 100 year ARI design storm and indicate
      allocation of stormwater inter-allotment easement/s where necessary.

16.   Demonstrate how and where all stormwater will be discharged from the site and
      how this water will be treated to remove pollutants from carpark and guests’
      rubbish.

17.   Demonstrate that sufficient rainwater tanks will be provided on site to service the
      toilets in the new building and the landscaping areas. To this end the overall
      tank(s) capacity should be based on 12 litres/m2 of roof area or at least one
      3000-litre tank, whichever is the greater.




  Award Winner - Australian Clean Beach
    Challenge 2004 Litter Prevention

Used in these records

About this file

File size
20 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request for Further Information - 010.2007.00001685.001 [As Published].pdf · 20 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.