STORMWATER
MANAGEMENT REPORT
58 on RP32777
25 Tulip Street, Cooroy
May 2026


[OCR of page images]
NT REPORT

pA
:
Ee
S
7

MANAGEME
een. aee Per wl e

 

Log in to download the original (RFI - Attachment 1 - Amended Stormwater Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 13 pages

Page 2

Contents
1.     INTRODUCTION .............................................................................................................. 4
2.     SITE DETAILS ................................................................................................................... 4
2.1.      Existing Site Description and Drainage Regime ................................................................. 4
2.2.      Proposed Development Drainage Regime .......................................................................... 6
2.3.      LPOD Assessment ........................................................................................................... 6
3.     STORMWATER CHARACTERISTCS ............................................................................... 7
3.1.      Comparison of Pre/Post Development and Quantity.......................................................... 7
3.2.      Quality ............................................................................................................................ 8
3.2.1.        Construction Phase....................................................................................................... 8
3.2.2.        Operational Phase ........................................................................................................ 8
4.     Conclusion and Recommendations ....................................................................................... 9
Appendix A –Proposed Development Concept Plans ................................................................... 10

Page 3

Document Control

Report Title            Stormwater Management Report

Client                  Ashley Trompf

Client Contact          Ashley Trompf                  Client Reference             25 Tulip St, Cooroy

                                                                                        Verifier
    Rev          Date       Revision details/status      Author         Reviewer                     Approver
                                                                                     (if required)
0         5 Nov 2025    Initial Version                J.Bauleka       J.Bauleka                     J.Bauleka

1         10 Nov 2025   Issued for Use                 J.Bauleka                                     J.Bauleka

2         29 May 2026   Information Request response   J.Bauleka                                     J.Bauleka

Current revision        2




Approval

Author signature                                       Approver signature




Name                    J.Bauleka                      Name                         J.Bauleka
                                                                                    RPEQ: 20693

Title                   Civil Engineer                 Title                        Civil Engineer




                                                                             Auxilium Consulting Pty Ltd
                                                                                      ABN 84 639 195 092
                                                                                         9 Ginger Bell Ave
                                                                                          Bli Bli, Qld 4560
                                                                                                   Australia



                                                                   M                     +61 423 415 419
                                                                   E      [email protected]

Page 4

1. INTRODUCTION
Auxilium Consulting Pty Ltd (Auxilium) has been engaged to prepare a Stormwater Management
Report to accompany a development application for a residential subdivision located at 25 Tulip
Street, Cooroy. This report investigates the stormwater management considerations for the existing
and proposed development site and assesses how the run-off from the site is to be managed in
accordance with Noosa Council (Council) requirements for stormwater drainage.

Council issued an Information Request (IR) on 7 April 2026 focussing on clarification of stormwater
aspects which this report has been updated to address.


2. SITE DETAILS
2.1. Existing Site Description and Drainage Regime
The existing Site is located at 25 Tulip Street, described as Lot 58 on Plan RP32777, and contains an
existing dwelling and shed with an area of 1,529 m2. The Site is a residential setting with a large
proportion of permeable areas.




FIGURE 1 SITE LOCALITY PLAN (NOOSA COUNCIL INTRAMAPS, 2025)

The Site slopes away from the road frontage towards the rear of the property. An unmapped channel
conveys flows to the east and eventually into the Lake Macdonald catchment system. This existing,
open channel discharges in a concentrated state from the Site.

Roof run-off from the existing dwelling is discharged to the rear of the Site as overland flows to the
existing channel. Road surface flows are excluded from the Site’s catchment with the kerb and
channel and crossover.

Page 5

FIGURE 2 SITE FRONTAGE (GOOGLE STREETVIEW, AUG 2023)




FIGURE 3 EXISTING ROOF DRAINAGE TO OVERLAND FLOWS TO REAR OF THE SITE (NOV 2025)

Page 6

   2.2. Proposed Development Drainage Regime
   The proposed subdivision results in the creation of one additional rear lot with an increase of
   impermeable surfaces through roof areas and driveway. It is expected that stormwater quantities will
   increase because of these impermeable areas with attenuation via above ground tanks proposed.

   Existing surface flows from upstream adjacent properties will remain unchanged. The existing
   drainage regime of discharging to the Lawful Point of Discharge (LPOD) at the northeastern
   boundary (unmapped channel) is maintained in the developed state. Further discussion about the
   LPOD is detailed in 2.3.

   The roof and allotment drainage system for the proposed site shall be designed to comply with:

        1. Noosa Council Planning Scheme SC6.7.6 Stormwater Management and 9.4.8 Water Quality
           and Drainage Code
        2. The Queensland Urban Drainage Manual (QUDM); and
        3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.


   2.3. LPOD Assessment
   As per QUDM’s criteria for determining the LPOD test, an assessment of the proposed drainage has
   been detailed below:

                      Criteria                                         Development Outcome
Will the proposed development alter the site’s          The proposed development must ensure that
stormwater discharge characteristics in a manner that   stormwater discharge is maintained as sheet flow to
may substantially damage a third-party property?        the discharge point and avoid concentrating flows,
                                                        increasing quantities and/or velocities.

                                                        Therefore, utilise stormwater attenuation systems
                                                        and level spreader devices to ensure the
                                                        characteristics do not damage a third-party’s
                                                        property.

Is the location of the discharge from the development   The location of the discharge is its existing location
site under the lawful control of the local government   because of the natural, steep terrain. It is part of the
or other statutory authority from whom permission       surrounding terrain and natural flow of the land and
to discharge has been received?                         eventually flows into a natural watercourse feeding
                                                        into the Lake Macdonald system.
This will include a park, watercourse, drainage or
road reserve, stormwater registered drainage            Therefore, as the immediate downstream discharge
easement, or land held by local government              point from the Site is not under the lawful control of
(including freehold land).                              the local statutory authority, further consideration of
                                                        the next criteria is required.

An authority to discharge over affected properties      In the context of obtaining authority to discharge
will be necessary. In descending order of certainty,    over the affected property, this would be a matter if
an authority may be in the form of:                     there was a material change that resulted in damage
                                                        to a third-party’s property and/or actionable
       Dedication of a drainage reserve or park        nuisance occurring.
       A registered easement for stormwater
        discharge/works                                 As this is the existing point of discharge and
       Written discharge approval                      conveyance of flows through the Site, maintaining
                                                        quantities and velocities to a pre-development state
                                                        would result in no actionable nuisance occurring.

Page 7

                                                          Therefore, a further assessment is undertaken below.

Common Law: Principles of nuisance                        If the existing discharge point is maintained, and
                                                          discharge quantities and velocities are maintained as
Alterations to the natural flow regime will be lawful     per the pre-developed state, then no third-party
if all necessary statutory approvals have been            damage is occurring, and this gives no rise to
obtained and complied with, and:                          actionable nuisance claims.

       There is no nuisance or interference to the       Therefore, if the development can maintain these
        use or enjoyment of affected land; or             pre-development attributes when discharging from
       The affected land owner has consented to the      the Site in the post-developed state, the alterations
        change in drainage                                will be lawful.

   TABLE 1 LPOD ASSESSMENT AGAINST PROPOSED DEVELOPMENT




   3. STORMWATER CHARACTERISTCS

   3.1. Comparison of Pre/Post Development and Quantity
   The development proposes to increase the impervious area of the site by 229m2 for the additional
   dwelling and allowance for the driveway surface – note this is an approximation to provide allowance
   for siting the actual driveway layout.

   In the previous version of this report, the post-development was modelled as having an impervious
   catchment of 31% to reflect these characteristics. In response to Council’s IR, the post-development
   has been updated to account for a conservative scenario consisting of dwelling, paved and
   landscaping areas over a 400 m2 pad resulting in an overall imperviousness of 45%. The developed
   catchment increases from the 31% to 57% and the modelling has been updated to account for this
   change in Table 2.

                                                    Pre-Development        Post-Development

                           Catchment                       Pre-01                Post-01

                            Area (Ha)                      0.153                  0.153

                        Fraction Imp (%)                     20                     57


                  Time of Concentration (mins)             10.13                  10.13




   TABLE 2 MODELLING PARAMETERS




   Pre and post discharge rates have been calculated using DRAINS software to evaluate the effect of
   the development. Attenuation of post-development flows have achieved by modelling each dwelling
   having a 3kL rainwater tank.

Page 8

Utilising the modelling methods of ARR2019, parameters from the ARR Data Hub for the site
location, and rainfall Intensity Frequency Distribution data from the Australian Bureau of
Meteorology have been implemented into the DRAINS model to determine the mean peak discharge
rates from the storm events. This is presented in Table 3 below.

                                                                      QPROPOSED M³/S (WITH
% AEP EVENT Q EXISTING M³/S QPROPOSED M³/S (NO ATTENUATION)                                QCHANGE M³/S
                                                                        ATTENUATION)

      63.2           0.020                      0.023                         0.019              -0.001

      39.3           0.030                      0.032                         0.026              -0.004

      18.1           0.043                      0.046                         0.039              -0.004

       10            0.051                      0.056                         0.046              -0.005

       5             0.063                      0.066                         0.059              -0.004

       2             0.072                      0.074                         0.072              0.000

       1             0.082                      0.085                         0.079              -0.003

TABLE 3 PRE AND POST COMPARISON OF PEAK DISCHARGE RATES

The effect of the rainwater tanks is effective attenuation of discharge rates to maintain existing rates
or even a reduction of the pre-development rates.

Controlled flows from the outlets of these tanks will be discharged to the LPOD via a level spreader
device to maintain the pre-development drainage regime. A grated trench drain will intercept flows
from the driveway and pipe to the level spreader prior to sheet flowing to the LPOD.

Refer to Appendix A Proposed Development Concept Plan for the proposed stormwater drainage layout
plan illustrating the concept described above. Note the specific details of the level spreader pipe inlet
will be determined during the Operational Works phase and this demonstrates the drainage concept.


3.2. Quality

        3.2.1.Construction Phase
To fulfill the General Environmental Duty, a person “…must not carry out any activity that causes or is
likely to cause environmental harm, unless measures to prevent or minimise the harm have been taken…”. It is
necessary to manage and mitigate these impacts through best practise erosion and sediment controls.
Due to the development area being less than 2,500 m2 the construction impacts will be managed
using the principles aligned with the desired outcomes of Appendix 2 of State Planning Policy (SPP).

A site-specific erosion and sediment control plan must be prepared and submitted as part of the
Operational Works approval.


        3.2.2.Operational Phase
This development consists of an additional dwelling as part of the subdivision and is consistent in
character with the existing residential dwelling and environment. As the development proposal is not

Page 9

considered to significantly alter the potential for pollutant generation, stormwater quality treatment
processes are not proposed for the development.


4. Conclusion and Recommendations
This Stormwater Management Report demonstrates how the stormwater run-off from the site is to be
managed to comply with the relevant requirements and mitigate adverse impacts to the downstream
catchment. Of note, QUDM assessment has been undertaken against the LPOD criteria demonstrating
no actionable nuisance arising from the proposed development.

       The proposed site stormwater run-off maintains the existing drainage regime. The existing
        surface runoff from the upstream properties remains unchanged compared to the existing state.

       An assessment against the LPOD criteria of QUDM has been detailed in this revised report
        with the outcomes incorporated into the concept stormwater layout, demonstrating no
        actionable nuisance outcomes because of the development.

       Pre and post development modelling of the resultant peak flows has been carried out, with
        attenuation using two 3kL rainwater tanks identified to mitigate peak flows. Outlets from the
        tanks discharge via a level spreader device to the LPOD, to maintain the pre-development
        drainage regime. The driveway surface flows are intercepted and piped to the level spreader via
        a trench drain.

       A site-specific erosion and sediment control plan is to be prepared and submitted with the
        Operational Works approval to mitigate impacts to the receiving catchments and fulfil the
        general environmental duty of care and Appendix 2 of the SPP.

       The proposed development is not considered to significantly alter the pollutant generating
        potential of the site; therefore, stormwater quality treatment processes are not proposed for the
        development.

Page 10

Appendix A –Proposed Development Concept Plans


[OCR of page images]
Appendix A —Proposed Development Concept Plans

Page 11

                                                   Concrete




                                                              STREET
                                         Deck
Shed




                                            Step
                     EXISTING BUILDING




                                                                TULIP
              DECK
       Slab


[OCR of page images]
XREFS :— X—IMAGE.dwg ; X-SURVEY.dwg

 

NORTH

 

Poe ee ee eee

 

LPOD 01

\ y

57
RP32777

 

 

 

Ma se msm sm sss se mm mm mm

 

 

 

 

 

 

 

59
RP32777

\

\

 

a

\
ee

i
i
i
i
i
i
1
=

TULIP STREET

 

 

 

 

 

 

 

 

 

 

 

 

 

Last Modified :- Moy 28, 2026 — 4:23pm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEGEND
ADJACENT BOUNDARY CATCHMENT TABLE
EXISTING ELECTRICAL
EXISTING DRAINAGE CATCHMENT | AREA (ha) | IMPERVIOUS ( % )
EXISTING KERB PRE 01 0.153 20.00
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
=a =o CATCHMENT BOUNDARY
LPop O LEGAL POINT OF DISCHARGE
F [Associated Job Nos] Survey Data Scales CLIENT 25 TULIP STREET, COOROY QLD 4563 COUNCIL
E Horiz. .
0 i mee YJ. & C. TROMPF PRE CATCHMENT NOOSA SHIRE COUNCIL
c foton Og Nos[Rarz. [WDD | 9 36 in ASSOOMTED CONSULTANTS DEVELOPMENT LAYOUT PLAN
B | STORMUATER UPOATE 28.05.26 Height |p) 66.399 Scale 1150 @A © ABN 84 639 195 092 BREN PLANNING STATUS Job No] =
A [ISSUE FOR REVEW 28.05.26 Datum " PIKK|. ST JARO. BAULEKA SIGNATURE ISSUE FOR USE Contract_No, -
a Signatory: - RPEQ Full Name, Eng. Area and RPEQ No. or Survey | SURVEYPLAN ] Dimensions shown in metres MAROOCHYDORE BC, QLD 4558 RPEQ #20693 DRAWN DESIGNED DATE j
Revisions/Descriptions = Full Name and Position Title Date Books | __%% __| except where shown otherwise +61 423 415 419 cPEng HN MN 28.05.26 Drawing No.| C900 IB
COTES] [email protected].AU__} DATE:28.05.26 Ud. Series Number 1 of 4

 

 

 

Page 12

                      Emt for Access & Services                                   Concrete




                                                                                             STREET
                                                                        Deck




       806m²




                                                              725m²
Shed




       2




                                                                           Step
                                                      1
                                                    EXISTING BUILDING




                                                                                               TULIP
                                             DECK
               Slab

Page 13

                                     Emt for Access & Services                                       Concrete




                                                                                                                STREET
                                                                                        Deck




                   806m²




                                                                             725m²
       Shed




              2




                                                                                           Step
                                                                     1
                                                                   EXISTING BUILDING




                                                                                                                  TULIP
                                                            DECK
                           Slab




                           Depth to be
                           determined during
LEVEL SPREADER SECTION     Operational Works                                           LEVEL SPREADER PLAN
                           phase

Page 14

 

XREFS :— X—BASE.dwg ; X-SURVEY.dwg

May 28, 2026 - 4:23pm

ALL ROOFWATER TO
DISCHARGE OVER TANK
INLET

MESH PROTECTION COVER
OVER INLET INTO TANK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Last Modified :—

CAD FILES J

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

poo n---- nnn H \
PROPOSED #100 ORIFICE 2 | | |
AT 1.82m OF TANK
PROPOSED $40 ORIFICE 1 DISCHARGE TO PROPOSED
AT BASE OF TANK STORMWATER DRAINAGE
t—| SYSTEM (REFER PLAN)
pase Ut é
= a z x
: a a ae 243 ; . ° faa 4 ga yg
q ¢ 4 4 < @
“ <
STORMWATER DETENTION TANK DETAIL-3kL
F Associated Job Nos] Survey Data Scales CLIENT 25 TULIP STREET, COOROY QLD 4563 COUNCIL
E tore J. & C. TROMPF ;
AHD AUXILIUM ° a
E btu oes TANK DETAIL NOOSA SHIRE COUNCIL
C Auxiliary Drg Nos] Horiz. | MGA2020 | 9 02 Oh 0.6m ASSOCIATED CONSULTANTS
Grid ZONEQ6 k ‘ ‘ NAN
B | STORMUATER UPOATE 28.05.26 Height | pr gg. 399 Scale 110 @A1 © ABN 84 639 195 092 BREN PLANNING STATUS Job No] =
A [ISSUE FOR REVEW 28.05.26 Datum : PIKK|. ST JARO. BAULEKA SIGNATURE ISSUE FOR USE Contract_No, -
a Signatory: - RPEQ Full Name, Eng. Area and RPEQ No. or Survey | SURVEYPLAN | Dimensions shown in metres MAROOCHYDORE BC, QLD 4558 RPEQ #20693 DRAWN DESIGNED DATE i |
Revisions/Descriptions = Full Name and Position Title Date Books | __y% __| except where shown otherwise +61 423 415 419 cPEng HN MN 28.05.26 Drawing No.| C903 |B
[email protected]__|_ DATE:28.05.26 Ud. Series Number 4 of 4

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.